Eps Remodel Inc
- Based in
- Sacramento
- On San Francisco permits
- Oct 2018 to Aug 2023
- Last 24 months
- 0 permits filed
27 permits since 2000: 20 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 4 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 5 days from filing to permit and 95 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 31, 2022 | Completed final sign-off Aug 2022 | 2286 15th St | (all work in rear) painting back of building. replace 12 windows in back of building. dry rot reapir on back stairs (less than 50%), siding back deck (less than 50%). replace 3 doors in back of building. replace wood plank for wood back deck with no changes or alteration to layout and roof repairs.Details
(all work in rear) painting back of building. replace 12 windows in back of building. dry rot reapir on back stairs (less than 50%), siding back deck (less than 50%). replace 3 doors in back of building. replace wood plank for wood back deck with no changes or alteration to layout and roof repairs. | $70,000 |
| May 11, 2021 | Completed final sign-off May 2021 | 54 Stanford Heights Av | exterior deck dryrot repair. repair in hand rails nd floor joist, less than 15% or as needed.Details
exterior deck dryrot repair. repair in hand rails nd floor joist, less than 15% or as needed. | $7,000 |