Block 3569, lot 021
17 Hoff St
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 3
- Units
- 6
- Rooms
- 12 bedrooms, 6 bathrooms
- Building
- 7,896 sq ft
- Lot
- 4,199 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 8, 2023 | Completed final sign-off Mar 2023 | 17 Hoff St | Luminous Fire Alarm | revision to f.a. permit 202107134240. remove some devices on plansDetails
revision to f.a. permit 202107134240. remove some devices on plans | |
| Apr 6, 2022 | Completed final sign-off Apr 2023 | 17 Hoff St | Perez Construction Llc. | unit #17: remodeling 1 existing kitchen and 1 bathroom of unit #17 of apartment building.Details
unit #17: remodeling 1 existing kitchen and 1 bathroom of unit #17 of apartment building. | $20,000 |
| Nov 9, 2021 | Never finaled filed Nov 2021, never issued | 17 Hoff St | Luminous Fire Alarm | install fire alarm system per nfpa 72. ref to pa# 201406027201Details
install fire alarm system per nfpa 72. ref to pa# 201406027201 | $36,968 |
| Nov 9, 2021 | Completed final sign-off Mar 2023 | 17 Hoff St | Luminous Fire Alarm | install fire sprinklers per nfpa 13 (2016) and 2" underground per nfpa 24 (2016). partial building. 21 total heads. ref to pa# 201406027201.Details
install fire sprinklers per nfpa 13 (2016) and 2" underground per nfpa 24 (2016). partial building. 21 total heads. ref to pa# 201406027201. | $19,850 |
| Jul 13, 2021 | Completed final sign-off Mar 2023 | 17 Hoff St | Luminous Fire Alarm | system install low frequency sounder to be located in entry bedrm and living room. install manual pull stations and ceiling smoke detectors above facu & near exits common areas. install cellular alarm communication for off site monitering.Details
system install low frequency sounder to be located in entry bedrm and living room. install manual pull stations and ceiling smoke detectors above facu & near exits common areas. install cellular alarm communication for off site monitering. | $36,968 |
| Jun 22, 2021 | Completed final sign-off Nov 2021 | 23 Hoff St | Eps Remodel Inc | bathroom and kitchen renovation. adding dishwasher & garbage disposal. changing location of sink,toilet, and shower within the bathroom.re-wire the whole unit flooring drywall & painting & plumbing- upper unit-no fixture added.Details
bathroom and kitchen renovation. adding dishwasher & garbage disposal. changing location of sink,toilet, and shower within the bathroom.re-wire the whole unit flooring drywall & painting & plumbing- upper unit-no fixture added. | $78,780 |
| May 12, 2021 | Completed final sign-off Apr 2023 | 17 Hoff St | Quality Sf Roofing | reroofingDetails
reroofing | $18,000 |
| Mar 29, 2021 | Completed final sign-off Apr 2023 | 17 Hoff St | Perez Construction Llc., S & I Construction, Inc | per ordinance 162-16 -convert (e) garage and storage to two adus and two regular dwelling units. new units within existing building footprint. new units include bedroom, bathroom, and kitchen -soft-story retrofit under permit #201406027201Details
per ordinance 162-16 -convert (e) garage and storage to two adus and two regular dwelling units. new units within existing building footprint. new units include bedroom, bathroom, and kitchen -soft-story retrofit under permit #201406027201 | $150,000 |
| Jun 2, 2014 | Completed final sign-off Mar 2015 | 17 Hoff St | Kalix Inc Dbalara Construction | soft story retrofit per sf ordinance no. 66-13, bldg code ch 34b, & admin. bulletin 106. seismic analysis per frma b807.Details
soft story retrofit per sf ordinance no. 66-13, bldg code ch 34b, & admin. bulletin 106. seismic analysis per frma b807. | $30,000 |
| Dec 2, 2004 | Never finaled issued Dec 2004, no final | 19 Hoff St | streetspaceDetails
streetspace | ||
| Nov 12, 2003 | Completed final sign-off Dec 2003 | 17 Hoff St | Lara Construction Co. | to comply with complaint no. 200343722- remove dry rot damaged wood from rear stairs (3), replace 7Details
to comply with complaint no. 200343722- remove dry rot damaged wood from rear stairs (3), replace 7 | $14,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.