Back to kitchen remodel contractors
Eg Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Mar 2023 to Sep 2026
- Last 24 months
- 11 permits filed
22 permits since 2000: 14 completed, 8 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 34 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2024 | Completed final sign-off Dec 2024 | 339 Chattanooga St | revision to 202411265778: add a pantry at kitchenDetails
revision to 202411265778: add a pantry at kitchen | $1,000 |
| Nov 26, 2024 | Completed final sign-off Dec 2024 | 339 Chattanooga St | install pre-fabricated pantry in kitchen. replace one window in kind - not street visible. in kitchen, replace plumbing and electrical in kind for new washer/dryer. remove existing washer/dryer.Details
install pre-fabricated pantry in kitchen. replace one window in kind - not street visible. in kitchen, replace plumbing and electrical in kind for new washer/dryer. remove existing washer/dryer. | $9,500 |
| Mar 21, 2023 | Completed final sign-off Nov 2024 | 1558 Clay St | create new habitable spaces in the existing utility spaces at the g/f, including a kitchenette, a wine room, a gym, a media room and a bathroom. work to include new windows and doors in existing rough openings.Details
create new habitable spaces in the existing utility spaces at the g/f, including a kitchenette, a wine room, a gym, a media room and a bathroom. work to include new windows and doors in existing rough openings. | $180,000 |