Eg Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Mar 2023 to Sep 2026
- Last 24 months
- 11 permits filed
22 permits since 2000: 14 completed, 8 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 1 completed, 3 in progress. Typically 4 days from filing to permit and 469 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2026 | In progress issued Sep 2026 | 2407 21st Av | repair leak: remove and replace affected shingles on deck in kind. repair water damaged drywall at affected areas. interior and exterior work, not visible from street. no stud or joist replacement, affected area approx. 256 sqft.Details
repair leak: remove and replace affected shingles on deck in kind. repair water damaged drywall at affected areas. interior and exterior work, not visible from street. no stud or joist replacement, affected area approx. 256 sqft. | $2,000 |
| Sep 15, 2026 | In progress issued Sep 2026 | 1371 45th Av | replace access steps for stairs that lead to yard from deck. replace a couple of rotted deck boards.cDetails
replace access steps for stairs that lead to yard from deck. replace a couple of rotted deck boards.c | $1,500 |
| Apr 15, 2026 | In progress issued Apr 2026 | 1664 Post St | work in front area for replace deck board, replace trim, replace siding front are everything will be replace with same material and design work will be performed on 2nd and 3rd flr. all work in kind.Details
work in front area for replace deck board, replace trim, replace siding front are everything will be replace with same material and design work will be performed on 2nd and 3rd flr. all work in kind. | $6,500 |
| Mar 11, 2024 | Completed final sign-off Nov 2025 | 425 Staples Av | horizontal addition, 2nd floor wood deck with stairs to grade and interior remodel.Details
horizontal addition, 2nd floor wood deck with stairs to grade and interior remodel. | $352,777 |