Back to bathroom remodel contractors
Eg Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Mar 2023 to Sep 2026
- Last 24 months
- 11 permits filed
22 permits since 2000: 14 completed, 8 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 25, 2024 | Completed final sign-off Sep 2024 | 1604 Castro St | bath remodel, install new bath-tub at (e) shower location.Details
bath remodel, install new bath-tub at (e) shower location. | $17,000 |
| Apr 15, 2024 | Completed final sign-off Aug 2024 | 45 San Benito Wy | bath remodel at second floor. half bath remodel at first floor. no change of layout/walls.Details
bath remodel at second floor. half bath remodel at first floor. no change of layout/walls. | $38,000 |
| Dec 4, 2023 | Completed final sign-off May 2024 | 3386 Market St | 2 bathroom remodel. no change in location. plumbing and electrical. no walls removed.Details
2 bathroom remodel. no change in location. plumbing and electrical. no walls removed. | $25,000 |
| Mar 21, 2023 | Completed final sign-off Nov 2024 | 1558 Clay St | create new habitable spaces in the existing utility spaces at the g/f, including a kitchenette, a wine room, a gym, a media room and a bathroom. work to include new windows and doors in existing rough openings.Details
create new habitable spaces in the existing utility spaces at the g/f, including a kitchenette, a wine room, a gym, a media room and a bathroom. work to include new windows and doors in existing rough openings. | $180,000 |