Edri Construction Inc *See Notes*
- Based in
- San Francisco
- On San Francisco permits
- Sep 2020 to Sep 2026
- Last 24 months
- 68 permits filed
212 permits since 2000: 165 completed, 30 in progress, 8 never finaled, 9 expired or cancelled.
Of the 8 never-finaled permits, 6 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
21 stairs permits: 15 completed, 5 in progress, 1 never finaled. Typically 19 days from filing to permit and 345 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 18 Tiffany Av | alt of 2 units comprising of 4 bedrooms and 2 baths, kitchen and new stairs will be repaced. add foundation and retmain wall in back yard. reconfig 1/f unit, remodel 2/f.Details
alt of 2 units comprising of 4 bedrooms and 2 baths, kitchen and new stairs will be repaced. add foundation and retmain wall in back yard. reconfig 1/f unit, remodel 2/f. | $720,000 |
| Jun 15, 2026 | In progress issued Jun 2026 | 255 Anderson St | revision to pa #202602266565 to include foundation for the exterior staircase. current plan states to use existing but upon work beggining. no existing foundation existing.Details
revision to pa #202602266565 to include foundation for the exterior staircase. current plan states to use existing but upon work beggining. no existing foundation existing. | $10,000 |
| Jun 8, 2026 | In progress filed Jun 2026, not yet issued | 371 Banks St | 1/f: remodel - seismic retofit and addition of bonus room on 1/f. new windows and doors at street and back. new stairs up to entryDetails
1/f: remodel - seismic retofit and addition of bonus room on 1/f. new windows and doors at street and back. new stairs up to entry | $250,000 |
| Feb 27, 2026 | Completed final sign-off Aug 2026 | 32 Forest Knolls Dr | interior renovation - replacing (e) interior staircase. modifying upper level bathroom to accommodate stair. partial interior lower level renovation to living spaces. replace (e) lower level pedestrian door with window and wall infill.Details
interior renovation - replacing (e) interior staircase. modifying upper level bathroom to accommodate stair. partial interior lower level renovation to living spaces. replace (e) lower level pedestrian door with window and wall infill. | $250,000 |
| Aug 8, 2025 | Completed final sign-off Jun 2026 | 1527 Sanchez St | replacement in kind of (e) wood framed egress staircase with new conc footings & the addition of a 1-hour firewall at side property line location.Details
replacement in kind of (e) wood framed egress staircase with new conc footings & the addition of a 1-hour firewall at side property line location. | $60,000 |
| Jul 22, 2025 | Completed final sign-off Dec 2025 | 155 Hartford St | renovation of kitchen , 2nd floor bathroom, flooring and interior stair railing. localized bearing wall remodel, related framing strengthening. window infill at lightwell.Details
renovation of kitchen , 2nd floor bathroom, flooring and interior stair railing. localized bearing wall remodel, related framing strengthening. window infill at lightwell. | $65,000 |
| Jan 31, 2025 | In progress filed Jan 2025, not yet issued | 522 Ortega St | conversion of primary entrance from 2nd to 1st floor.relocate of entrance,conversion of 631sf of (e) grage and unconditioned area to living room.removal of (e) stairs.infill to add 34sf at 1/f, relocate kitchen to 1/f and installation of the new bathroom.reconfig of (e) exterior and rear back stairsDetails
conversion of primary entrance from 2nd to 1st floor.relocate of entrance,conversion of 631sf of (e) grage and unconditioned area to living room.removal of (e) stairs.infill to add 34sf at 1/f, relocate kitchen to 1/f and installation of the new bathroom.reconfig of (e) exterior and rear back stairs | $318,700 |
| Dec 10, 2024 | Completed final sign-off Dec 2025 | 2534 Chestnut St | revision to (e) permit#: 202102205052. revise structural sheet to remove stairs to roof from scope and revise roof deck size. remodel (e) kitchen and bathrooms on 2nd floor. add master bedroom closet and bathroom on 4th floor.Details
revision to (e) permit#: 202102205052. revise structural sheet to remove stairs to roof from scope and revise roof deck size. remodel (e) kitchen and bathrooms on 2nd floor. add master bedroom closet and bathroom on 4th floor. | $50,000 |
| Aug 27, 2024 | Completed final sign-off Nov 2024 | 2655 15th Av | change tiles of street facing front stairs. repair in kind, less than 50%.Details
change tiles of street facing front stairs. repair in kind, less than 50%. | $10,000 |
| Jun 7, 2024 | Completed final sign-off Aug 2024 | 2725 23rd St | remove and replace (in-kind) front stairs and landing in kind at (e) front entry due to dry rot. handrails and side walls below to remain tile floorDetails
remove and replace (in-kind) front stairs and landing in kind at (e) front entry due to dry rot. handrails and side walls below to remain tile floor | $15,000 |
| Mar 7, 2023 | Never finaled issued Mar 2023, no final | 139 19th Av | new stair down from existin deck to the backyard, interior kitchen remodel, removing portions of interior walls to create open kitchen-living room; no work on level 1; no change to room useDetails
new stair down from existin deck to the backyard, interior kitchen remodel, removing portions of interior walls to create open kitchen-living room; no work on level 1; no change to room use | $18,000 |
| Feb 3, 2023 | Completed final sign-off Mar 2024 | 145 Northwood Dr | 1) remodeling of a single family dwelling. 2) relocate interior stair. 3) remodeling (e) kitchen. 4) replace (e) rear window/door at 2/f deck. 5) provide (n) rear deck over (e) conc. slab and new rear folding door at 1/f. 6) remove (e) window at 2/f closet.Details
1) remodeling of a single family dwelling. 2) relocate interior stair. 3) remodeling (e) kitchen. 4) replace (e) rear window/door at 2/f deck. 5) provide (n) rear deck over (e) conc. slab and new rear folding door at 1/f. 6) remove (e) window at 2/f closet. | $60,000 |
| Sep 26, 2022 | Completed final sign-off Apr 2024 | 238 Rutledge St | revision 1 to (e) bpa#202206166528. convert basement to habitable space including new office & full bathroom, rebuild (e) stairs to basement, replace front windows in-kind on ground floor & (2) windows on 2/fDetails
revision 1 to (e) bpa#202206166528. convert basement to habitable space including new office & full bathroom, rebuild (e) stairs to basement, replace front windows in-kind on ground floor & (2) windows on 2/f | $30,000 |
| Aug 25, 2022 | In progress issued Sep 2024 | 158 15th Av | 3 story horizontal addition @ rear.all 3 levels increase the width of the(e)rear bump-out 5 feet,lower level,remodel (e)bath,convert garage & storage space to office,2 car tandem parking & family room/den.on main level,move kitchen to rear of house,add internal staircase.Details
3 story horizontal addition @ rear.all 3 levels increase the width of the(e)rear bump-out 5 feet,lower level,remodel (e)bath,convert garage & storage space to office,2 car tandem parking & family room/den.on main level,move kitchen to rear of house,add internal staircase. | $150,000 |
| Jun 17, 2022 | Completed final sign-off Dec 2023 | 201 Folsom St | unit #41c: revision to pa# 202112073853. stair layout alteration (interior).Details
unit #41c: revision to pa# 202112073853. stair layout alteration (interior). | |
| Apr 18, 2022 | Completed final sign-off Nov 2022 | 955 Clayton St | unit #3: repair wood deck boards and stair steps. less than 50%. ~60 sqft.Details
unit #3: repair wood deck boards and stair steps. less than 50%. ~60 sqft. | $6,000 |
| Mar 24, 2022 | Completed final sign-off Aug 2024 | 333 Precita Av | relocate kitchen and remove wall remodel bathrooms, relocate stairs, remodel central patio, replace window/doors not visible from street on 2nd floor. rearrange rooms including family bathroom, media and laundry. replace doors at rear 1st flr. replace side stucco at rear. repair dry rot at front. *Details
relocate kitchen and remove wall remodel bathrooms, relocate stairs, remodel central patio, replace window/doors not visible from street on 2nd floor. rearrange rooms including family bathroom, media and laundry. replace doors at rear 1st flr. replace side stucco at rear. repair dry rot at front. * | $250,000 |
| Dec 7, 2021 | Completed final sign-off Dec 2023 | 201 Folsom St | rev to pa202106283334: steel staircase redesign.Details
rev to pa202106283334: steel staircase redesign. | |
| Sep 29, 2021 | Completed final sign-off Dec 2022 | 8 San Gabriel Av | replace 1 windows with alum clad wood window at front. rearrange rooms and stairs, add a full bath, remodel bath and kitchen on 2/f. add bedrooms, media rooms,one and half bath, kitchentee, relocate/replace garage door, replace side door. enhance foundation on 1/f, replace water heater, furnace,Details
replace 1 windows with alum clad wood window at front. rearrange rooms and stairs, add a full bath, remodel bath and kitchen on 2/f. add bedrooms, media rooms,one and half bath, kitchentee, relocate/replace garage door, replace side door. enhance foundation on 1/f, replace water heater, furnace, | $180,000 |
| Aug 5, 2021 | Completed final sign-off Mar 2023 | 277 Andover St | interior remodel of ground fl. to include (n) bath room (n) laundry (n) bed room, (n) family & study, & excavation for code ceiling ht. 2nd story remodel to include stair upgrade, remodeled kitchen, remodeled bath, & (n) powder roomDetails
interior remodel of ground fl. to include (n) bath room (n) laundry (n) bed room, (n) family & study, & excavation for code ceiling ht. 2nd story remodel to include stair upgrade, remodeled kitchen, remodeled bath, & (n) powder room | $160,000 |
| Nov 3, 2020 | Completed final sign-off Oct 2023 | 30 Camellia Av | ground floor rooms down + minor lightwell infill: new bedroom, bathroom & family room. remodel stair. no exterior work visible from public right-of-way.Details
ground floor rooms down + minor lightwell infill: new bedroom, bathroom & family room. remodel stair. no exterior work visible from public right-of-way. | $75,000 |