Edri Construction Inc *See Notes*
- Based in
- San Francisco
- On San Francisco permits
- Sep 2020 to Sep 2026
- Last 24 months
- 68 permits filed
212 permits since 2000: 165 completed, 30 in progress, 8 never finaled, 9 expired or cancelled.
Of the 8 never-finaled permits, 6 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
3 roof deck permits: 2 completed, 1 in progress. Typically 29 days from filing to permit and 678 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2025 | In progress issued Sep 2025 | 1403 Willard St | roof deck repair above garage, like for like less than 50% repair.Details
roof deck repair above garage, like for like less than 50% repair. | $73,000 |
| Dec 10, 2024 | Completed final sign-off Dec 2025 | 2534 Chestnut St | revision to (e) permit#: 202102205052. revise structural sheet to remove stairs to roof from scope and revise roof deck size. remodel (e) kitchen and bathrooms on 2nd floor. add master bedroom closet and bathroom on 4th floor.Details
revision to (e) permit#: 202102205052. revise structural sheet to remove stairs to roof from scope and revise roof deck size. remodel (e) kitchen and bathrooms on 2nd floor. add master bedroom closet and bathroom on 4th floor. | $50,000 |
| Feb 20, 2021 | Completed final sign-off Dec 2025 | 2534 Chestnut St | remodel garage level, 3/f, & 4/f. at 4/f, front of building will be remodeled to remove an addition that was previously built. restore original exterior deck & railing. horizontal addition proposed to create family room, 1/2 bath, with new roof deck. interior remodel to create new master suiteDetails
remodel garage level, 3/f, & 4/f. at 4/f, front of building will be remodeled to remove an addition that was previously built. restore original exterior deck & railing. horizontal addition proposed to create family room, 1/2 bath, with new roof deck. interior remodel to create new master suite | $325,000 |