Back to bathroom remodel contractors
Edri Construction Inc *See Notes*
- Based in
- San Francisco
- On San Francisco permits
- Sep 2020 to Sep 2026
- Last 24 months
- 68 permits filed
212 permits since 2000: 165 completed, 30 in progress, 8 never finaled, 9 expired or cancelled.
Of the 8 never-finaled permits, 6 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
114 bathroom remodel permits: 98 completed, 9 in progress, 3 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 163 days from permit to final inspection.
Showing the 100 most recent of 114.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2026 | In progress issued Sep 2026 | 149 Anderson St | add a bathroom to the basement.Details
add a bathroom to the basement. | $150,000 |
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 18 Tiffany Av | alt of 2 units comprising of 4 bedrooms and 2 baths, kitchen and new stairs will be repaced. add foundation and retmain wall in back yard. reconfig 1/f unit, remodel 2/f.Details
alt of 2 units comprising of 4 bedrooms and 2 baths, kitchen and new stairs will be repaced. add foundation and retmain wall in back yard. reconfig 1/f unit, remodel 2/f. | $720,000 |
| Apr 29, 2026 | Completed final sign-off Aug 2026 | 211 Moscow St | bathroom remodel like for likeDetails
bathroom remodel like for like | $40,000 |
| Feb 27, 2026 | Completed final sign-off Aug 2026 | 32 Forest Knolls Dr | interior renovation - replacing (e) interior staircase. modifying upper level bathroom to accommodate stair. partial interior lower level renovation to living spaces. replace (e) lower level pedestrian door with window and wall infill.Details
interior renovation - replacing (e) interior staircase. modifying upper level bathroom to accommodate stair. partial interior lower level renovation to living spaces. replace (e) lower level pedestrian door with window and wall infill. | $250,000 |
| Dec 24, 2025 | Completed final sign-off Jul 2026 | 601 Van Ness Av | apt 23: master bathroom remodel like for like, replace shower, toilet, sink, vanity, mep to code 50 sq ft. kitchen remodel, like for like 80 sq ft. add six lights.keep (e) accssesbility.Details
apt 23: master bathroom remodel like for like, replace shower, toilet, sink, vanity, mep to code 50 sq ft. kitchen remodel, like for like 80 sq ft. add six lights.keep (e) accssesbility. | $80,000 |
| Dec 4, 2025 | In progress issued Dec 2025 | 2715 Bush St | 2715 and 2717: kitchen and bathroom remodel like for like for both top and bottom units. 2717 will be half bathroom remodel.Details
2715 and 2717: kitchen and bathroom remodel like for like for both top and bottom units. 2717 will be half bathroom remodel. | $75,000 |
| Sep 15, 2025 | Completed final sign-off Nov 2025 | 66 Cleary Ct | unit 603: revision to pa 202509084783, changing tub to walk in shower, bathroom remodel.Details
unit 603: revision to pa 202509084783, changing tub to walk in shower, bathroom remodel. | $5,000 |
| Aug 7, 2025 | Completed final sign-off Sep 2026 | 254 Laussat St | bathroom remodel. like for like. 40 sq. ft.Details
bathroom remodel. like for like. 40 sq. ft. | $28,192 |
| Jul 25, 2025 | Completed final sign-off Jun 2026 | 1612 Anza St | bathroom and kitchen remodel. like for like. no structural workDetails
bathroom and kitchen remodel. like for like. no structural work | $101,000 |
| Jul 25, 2025 | Completed final sign-off Jul 2026 | 160 Vicksburg St | 1 bathroom remodel like for like.Details
1 bathroom remodel like for like. | $71,580 |
| Jul 22, 2025 | Completed final sign-off Dec 2025 | 155 Hartford St | renovation of kitchen , 2nd floor bathroom, flooring and interior stair railing. localized bearing wall remodel, related framing strengthening. window infill at lightwell.Details
renovation of kitchen , 2nd floor bathroom, flooring and interior stair railing. localized bearing wall remodel, related framing strengthening. window infill at lightwell. | $65,000 |
| Jun 20, 2025 | Completed final sign-off Nov 2025 | 1093 Dolores St | unit 4: bathroom(40 sq ft) and kitchen( 60 sq ft) remodel, no structural changes, like for like. rewire whole house & subpanel 100ampDetails
unit 4: bathroom(40 sq ft) and kitchen( 60 sq ft) remodel, no structural changes, like for like. rewire whole house & subpanel 100amp | $40,000 |
| Jun 10, 2025 | Completed final sign-off Dec 2025 | 1130 Moraga St | kitchen and bathroom remodel like for like rewire entire house. subpanel upgrade 100 amps bathroom. 40 sq ft shower.Details
kitchen and bathroom remodel like for like rewire entire house. subpanel upgrade 100 amps bathroom. 40 sq ft shower. | $40,000 |
| Jun 10, 2025 | Completed final sign-off Dec 2025 | 155 Hartford St | kitchen and bathroom remodel like for like. bathroom 50 sq ft. (tub)Details
kitchen and bathroom remodel like for like. bathroom 50 sq ft. (tub) | $25,000 |
| May 30, 2025 | Completed final sign-off Dec 2025 | 139 19th Av | 2 bathroom remodels like for like. no structural changes.Details
2 bathroom remodels like for like. no structural changes. | $50,000 |
| Apr 22, 2025 | In progress issued May 2025 | 212 Elsie St | remodel (e) kitchen and bathroom on the 2nd floor. convert ground floor into living space and add new master bedroom and bathroom. replace (e) furnace and water heater.Details
remodel (e) kitchen and bathroom on the 2nd floor. convert ground floor into living space and add new master bedroom and bathroom. replace (e) furnace and water heater. | $180,000 |
| Apr 18, 2025 | Completed final sign-off Jun 2025 | 3298 Washington St | bathroom remodel no structural changes like for like replace toilet, vanity, sink, fan, shower upgrade mep to code.Details
bathroom remodel no structural changes like for like replace toilet, vanity, sink, fan, shower upgrade mep to code. | $25,000 |
| Apr 14, 2025 | Completed final sign-off Dec 2025 | 219 Corbett Av | to relocate plumbing fixtures at bathroom hall. create a new bathroom at back of bedroom. plumbing and electrical work involvedDetails
to relocate plumbing fixtures at bathroom hall. create a new bathroom at back of bedroom. plumbing and electrical work involved | $60,000 |
| Mar 28, 2025 | Completed final sign-off Jul 2025 | 300 Montecito Av | 1) violation correction or the following complaint: #202427190,202426487 and 202307472. 2) remove car port roof structure 3) remove shower in garage bathroom. 4) legalize half bathroom arage (basement)Details
1) violation correction or the following complaint: #202427190,202426487 and 202307472. 2) remove car port roof structure 3) remove shower in garage bathroom. 4) legalize half bathroom arage (basement) | $15,000 |
| Mar 27, 2025 | Completed final sign-off Aug 2026 | 631 Ofarrell St | unit 2101: remodel full kitchen & 2 master batthroom & 1/2 bathroom. all work like for like. no alteration of wall, windows or doorDetails
unit 2101: remodel full kitchen & 2 master batthroom & 1/2 bathroom. all work like for like. no alteration of wall, windows or door | $250,000 |
| Mar 13, 2025 | Completed final sign-off Jun 2025 | 146 Peralta Av | middle building - unit b: one bathroom and one kitchen remodel like for like. no wall demolition or construction, no change in plumbing fixture count.Details
middle building - unit b: one bathroom and one kitchen remodel like for like. no wall demolition or construction, no change in plumbing fixture count. | $50,000 |
| Feb 4, 2025 | Completed final sign-off Sep 2025 | 71 Knollview Wy | kitchen and bath room remodel like for like no structural changes, no layout changes, no plumbing and electric relocationDetails
kitchen and bath room remodel like for like no structural changes, no layout changes, no plumbing and electric relocation | $45,000 |
| Jan 31, 2025 | In progress filed Jan 2025, not yet issued | 522 Ortega St | conversion of primary entrance from 2nd to 1st floor.relocate of entrance,conversion of 631sf of (e) grage and unconditioned area to living room.removal of (e) stairs.infill to add 34sf at 1/f, relocate kitchen to 1/f and installation of the new bathroom.reconfig of (e) exterior and rear back stairsDetails
conversion of primary entrance from 2nd to 1st floor.relocate of entrance,conversion of 631sf of (e) grage and unconditioned area to living room.removal of (e) stairs.infill to add 34sf at 1/f, relocate kitchen to 1/f and installation of the new bathroom.reconfig of (e) exterior and rear back stairs | $318,700 |
| Jan 29, 2025 | Completed final sign-off Apr 2025 | 1619 Vallejo St | remodel e) bathroom & add a new bathroom, remodel e) kitchen, replace appliances only on 3rd fl, no exterior work moving non bearing wallsDetails
remodel e) bathroom & add a new bathroom, remodel e) kitchen, replace appliances only on 3rd fl, no exterior work moving non bearing walls | $60,000 |
| Jan 28, 2025 | Completed final sign-off Oct 2025 | 2298 03rd St | first time t.i. of 1048 sq ft ground floor space including plumbing fixtures for an accessible bathroom, remove and replace front door, new and paint. no structural work. mep deferred.Details
first time t.i. of 1048 sq ft ground floor space including plumbing fixtures for an accessible bathroom, remove and replace front door, new and paint. no structural work. mep deferred. | $30,000 |
| Jan 23, 2025 | Completed final sign-off May 2025 | 434 Page St | bathroom remodel like for like no wall removal or layout changeDetails
bathroom remodel like for like no wall removal or layout change | $20,000 |
| Dec 13, 2024 | Completed final sign-off Oct 2025 | 212 Day St | full bathroom remodel like for like.Details
full bathroom remodel like for like. | $30,000 |
| Dec 10, 2024 | Completed final sign-off Dec 2025 | 2534 Chestnut St | revision to (e) permit#: 202102205052. revise structural sheet to remove stairs to roof from scope and revise roof deck size. remodel (e) kitchen and bathrooms on 2nd floor. add master bedroom closet and bathroom on 4th floor.Details
revision to (e) permit#: 202102205052. revise structural sheet to remove stairs to roof from scope and revise roof deck size. remodel (e) kitchen and bathrooms on 2nd floor. add master bedroom closet and bathroom on 4th floor. | $50,000 |
| Sep 20, 2024 | Completed final sign-off Aug 2025 | 572 Anderson St | remodel (e) hallway bathroom. reconfigure (e) laundry & add 1/2 bath. replace part of exterior siding and window trims like for like. remove all gas lines from dwellingDetails
remodel (e) hallway bathroom. reconfigure (e) laundry & add 1/2 bath. replace part of exterior siding and window trims like for like. remove all gas lines from dwelling | $70,000 |
| Jul 17, 2024 | Completed final sign-off May 2025 | 2774 Union St | kitchen remodel like for like. bathroom remodel like for like. (2) window replacement like for like - not street visible.Details
kitchen remodel like for like. bathroom remodel like for like. (2) window replacement like for like - not street visible. | $90,000 |
| Jul 11, 2024 | Completed final sign-off Apr 2026 | 144 Beaumont Av | 1 kitchen remodel & 1 bathroom remodel,like for like, adding subpanel.Details
1 kitchen remodel & 1 bathroom remodel,like for like, adding subpanel. | $120,000 |
| Jun 27, 2024 | In progress issued Jun 2024 | 78 Mercedes Wy | bathroom remodel like for like. no removal of wallsDetails
bathroom remodel like for like. no removal of walls | $20,000 |
| Jun 26, 2024 | Completed final sign-off Aug 2024 | 580 Ramsell St | bathroom remodel. toilet will switch places with standing shower. no other changes.Details
bathroom remodel. toilet will switch places with standing shower. no other changes. | $30,000 |
| Jun 7, 2024 | Completed final sign-off Sep 2024 | 1736 Hayes St | remodel existing hall half bathroom into full bathroom. remodel existing 1/4 bathroom into new 1/2 bathroom.Details
remodel existing hall half bathroom into full bathroom. remodel existing 1/4 bathroom into new 1/2 bathroom. | $61,350 |
| Apr 16, 2024 | In progress issued May 2024 | 820 Lawton St | siding replacement, roof replacement with 3 skylights. replace all doors like for like, windows like for like. rewire new sub panel on each level of home. install smoke alarms and carbon. new havac system.new mini split, kitchen remodel, new bath 1st fl. replace balconnies like for like. all bathDetails
siding replacement, roof replacement with 3 skylights. replace all doors like for like, windows like for like. rewire new sub panel on each level of home. install smoke alarms and carbon. new havac system.new mini split, kitchen remodel, new bath 1st fl. replace balconnies like for like. all bath | $200,000 |
| Apr 9, 2024 | Completed final sign-off Nov 2024 | 2534 Chestnut St | exploratory demo on 1st, 2nd & 3rd fl. demolition of kitchen, bathroom, powder room, laundry room and sheetrock. soft demolition only. no structural demolition under this permit. demolition of finishes in listed areas only.Details
exploratory demo on 1st, 2nd & 3rd fl. demolition of kitchen, bathroom, powder room, laundry room and sheetrock. soft demolition only. no structural demolition under this permit. demolition of finishes in listed areas only. | $100,000 |
| Apr 2, 2024 | Completed final sign-off Jun 2024 | 116 Park St | bathroom remodel like for like (1)Details
bathroom remodel like for like (1) | $30,000 |
| Feb 27, 2024 | Completed final sign-off Aug 2024 | 2725 23rd St | create new full bathroom and closet in (e) family room. create new storage room in garage.Details
create new full bathroom and closet in (e) family room. create new storage room in garage. | $50,000 |
| Feb 9, 2024 | Completed final sign-off Aug 2024 | 419 Mangels Av | extg bathroom remodel like for like on 1st floor. extg kitchen remodel on 2nd floor with structural changes with plans.Details
extg bathroom remodel like for like on 1st floor. extg kitchen remodel on 2nd floor with structural changes with plans. | $50,000 |
| Jan 23, 2024 | Completed final sign-off Jul 2024 | 15 Hollywood Ct | g/f: add a full bathroom. replace the gas furnace with an electric heat pump and indoor air handler.Details
g/f: add a full bathroom. replace the gas furnace with an electric heat pump and indoor air handler. | $15,000 |
| Jan 16, 2024 | Completed final sign-off May 2024 | 801 27th St | remodel 1 bathroom - like for like.Details
remodel 1 bathroom - like for like. | $30,000 |
| Dec 21, 2023 | Completed final sign-off Apr 2024 | 1778 10th Av | full bathroom add powder room, remove furnace add 4 min splits. all work on 2nd fl and 1st flr. condensor on roof. revision to 202312122342Details
full bathroom add powder room, remove furnace add 4 min splits. all work on 2nd fl and 1st flr. condensor on roof. revision to 202312122342 | |
| Dec 19, 2023 | Completed final sign-off Mar 2025 | 121 Ortega St | interior non structural residential renovation: kitchen, 1/2 bath, and laundry room remodel on the 2nd floor and bathroom remodel on the 3rd floor. fdn repair & replace fdn & slab at rear pop outDetails
interior non structural residential renovation: kitchen, 1/2 bath, and laundry room remodel on the 2nd floor and bathroom remodel on the 3rd floor. fdn repair & replace fdn & slab at rear pop out | $35,000 |
| Dec 12, 2023 | Completed final sign-off Apr 2024 | 1778 10th Av | full bathroom remodel, adding a new pwder room, rewire entire house.Details
full bathroom remodel, adding a new pwder room, rewire entire house. | $150,000 |
| Oct 10, 2023 | Completed final sign-off Mar 2024 | 145 Northwood Dr | 3 windows replacement like for like. replace master bedroom window, bathroom window, kitchen. all windows are at the sides. same size, same locations, max u-factor 0.3; not visible from the street.Details
3 windows replacement like for like. replace master bedroom window, bathroom window, kitchen. all windows are at the sides. same size, same locations, max u-factor 0.3; not visible from the street. | $3,000 |
| Aug 8, 2023 | Completed final sign-off Jan 2024 | 3824 Cesar Chavez St | kitchen like for like: bathroom like for likeDetails
kitchen like for like: bathroom like for like | $40,000 |
| Aug 8, 2023 | Completed final sign-off Jan 2024 | 3822 Cesar Chavez St | bathroom remodel like for like with shower panDetails
bathroom remodel like for like with shower pan | $20,000 |
| Jul 25, 2023 | Never finaled issued Jul 2023, no final | 15 Aladdin Tr | bathroom remodel like for like, tub to tub. replace vanity, toilet, tub, tiles, and lights.Details
bathroom remodel like for like, tub to tub. replace vanity, toilet, tub, tiles, and lights. | $20,000 |
| Jun 29, 2023 | Completed final sign-off Nov 2024 | 2655 15th Av | remodel (e) kitchen and add a new bathroom on 2nd fl; convert ground fl into habitable space and add a new media room, a bathroom, master bedroom and laundry room; replace (e) furnacce and water heater; add a new skylightDetails
remodel (e) kitchen and add a new bathroom on 2nd fl; convert ground fl into habitable space and add a new media room, a bathroom, master bedroom and laundry room; replace (e) furnacce and water heater; add a new skylight | $295,000 |
| May 10, 2023 | Completed final sign-off Sep 2023 | 205 Coleridge St | remodel existing bathroom, add a small bath. all work on 3rd floor.Details
remodel existing bathroom, add a small bath. all work on 3rd floor. | $20,000 |
| Mar 17, 2023 | Completed final sign-off May 2023 | 1501 Moraga St | bathroom remodel- like for like: electrical and plumbing up to codeDetails
bathroom remodel- like for like: electrical and plumbing up to code | $40,000 |
| Mar 13, 2023 | Completed final sign-off Aug 2023 | 319 Parker Av | two bathroom remodels, like for like plumbing and electricial up to code new fan, bathtub in guest bathroom, walk-in shower in main bathroom no structural work. no changes in wall layout. no structural work.Details
two bathroom remodels, like for like plumbing and electricial up to code new fan, bathtub in guest bathroom, walk-in shower in main bathroom no structural work. no changes in wall layout. no structural work. | $80,000 |
| Feb 22, 2023 | Completed final sign-off Mar 2023 | 1915 Eddy St | bathroom remodel - like for like. update plumbing and electrical to code.Details
bathroom remodel - like for like. update plumbing and electrical to code. | $40,000 |
| Jan 5, 2023 | Completed final sign-off Nov 2023 | 434 Page St | bathroom remodel: install toilet and vanity. no moving walls.Details
bathroom remodel: install toilet and vanity. no moving walls. | $45,000 |
| Dec 28, 2022 | Expired or cancelled suspend Jan 2026 | 45 Prospect Av | remodel e kitchen & bath, add n bath & master bath, add 3 new dormers & convert attic to habitable space. new foundation.Details
remodel e kitchen & bath, add n bath & master bath, add 3 new dormers & convert attic to habitable space. new foundation. | $50,000 |
| Dec 16, 2022 | Completed final sign-off Oct 2023 | 54 Sussex St | remodel kitchen & bath on 2nd floor.Details
remodel kitchen & bath on 2nd floor. | $50,000 |
| Dec 16, 2022 | Completed final sign-off Sep 2023 | 235 Rutledge St | add a bedroom, a full bathroom & kitcheneete, relocate entry doors, add windows & doors at reat on 1st floor, replace water heater, hvac, upgrade electrical & plumbing systems.Details
add a bedroom, a full bathroom & kitcheneete, relocate entry doors, add windows & doors at reat on 1st floor, replace water heater, hvac, upgrade electrical & plumbing systems. | $100,000 |
| Dec 14, 2022 | Completed final sign-off Feb 2024 | 1715 Lyon St | bathroom remodel like for like.Details
bathroom remodel like for like. | $10,000 |
| Nov 14, 2022 | Completed final sign-off Jan 2023 | 446 20th Av | 1/f-unit 2: full bathroom remodel, full demo floor/drywall, electrical, plumbing, new tile, shower, vanity, & toilet.Details
1/f-unit 2: full bathroom remodel, full demo floor/drywall, electrical, plumbing, new tile, shower, vanity, & toilet. | $20,000 |
| Nov 14, 2022 | Completed final sign-off Jan 2023 | 446 20th Av | apt #5: bathroom remodel requiring electrical , building, and plumbing modifications, adding neew vanity after full demo along with drywall , tile, shower etc. 2/fDetails
apt #5: bathroom remodel requiring electrical , building, and plumbing modifications, adding neew vanity after full demo along with drywall , tile, shower etc. 2/f | $20,000 |
| Nov 10, 2022 | In progress issued Feb 2024 | 2159 15th Av | remodel of (e) 1st & 2nd floors including kitchen/living/dining area/bathroomDetails
remodel of (e) 1st & 2nd floors including kitchen/living/dining area/bathroom | $60,000 |
| Nov 9, 2022 | Completed final sign-off Jan 2023 | 845 Dolores St | 2/f: revision to no-plan permit 202207067784, building 2 walls in bathroom.Details
2/f: revision to no-plan permit 202207067784, building 2 walls in bathroom. | $3,500 |
| Oct 31, 2022 | Completed final sign-off Sep 2023 | 443 Crestmont Dr | interior remodel. no structural work. remodel extg kitchen and bathroom. add a new half bathroom on 2nd floor. replace water heater. add new gas and electric fireplaces. replace the front window with a new garden window, visible from street. remove two skylights and remove non-load bearing wallsDetails
interior remodel. no structural work. remodel extg kitchen and bathroom. add a new half bathroom on 2nd floor. replace water heater. add new gas and electric fireplaces. replace the front window with a new garden window, visible from street. remove two skylights and remove non-load bearing walls | $90,000 |
| Oct 24, 2022 | Completed final sign-off Dec 2022 | 678 28th Av | converting guest bathroom to 1/2 bathroom. canceling shower.Details
converting guest bathroom to 1/2 bathroom. canceling shower. | $8,000 |
| Oct 19, 2022 | Completed final sign-off Dec 2022 | 2053 Vallejo St | building plumbing and electrical work will be done for a master bathroom. add an additional vanity will be added requiring additional electical and plumbing work to the existing master bathroom. this is on the 2nd floor.Details
building plumbing and electrical work will be done for a master bathroom. add an additional vanity will be added requiring additional electical and plumbing work to the existing master bathroom. this is on the 2nd floor. | $40,000 |
| Oct 12, 2022 | Completed final sign-off Nov 2024 | 132 Cortland Av | 2 story interior remodel. kitchen and bath remodel (kitchen & 1 bathroom under pa202207188732). relocate (e) 1/f bathroom. add powder room on 1st fl. relocate 1st fl bedroom.add 1 bathroom to 2/f. amend to pa 202207188732Details
2 story interior remodel. kitchen and bath remodel (kitchen & 1 bathroom under pa202207188732). relocate (e) 1/f bathroom. add powder room on 1st fl. relocate 1st fl bedroom.add 1 bathroom to 2/f. amend to pa 202207188732 | $100,000 |
| Sep 26, 2022 | Completed final sign-off Apr 2024 | 238 Rutledge St | revision 1 to (e) bpa#202206166528. convert basement to habitable space including new office & full bathroom, rebuild (e) stairs to basement, replace front windows in-kind on ground floor & (2) windows on 2/fDetails
revision 1 to (e) bpa#202206166528. convert basement to habitable space including new office & full bathroom, rebuild (e) stairs to basement, replace front windows in-kind on ground floor & (2) windows on 2/f | $30,000 |
| Sep 22, 2022 | Completed final sign-off Jun 2023 | 1510 24th Av | (1) bathroom, (1) kitchen, (1) powder room, (1) laundry room remodel like for like. upgrading main panel to 200 amp. tankless water heater, upgrading hvac.Details
(1) bathroom, (1) kitchen, (1) powder room, (1) laundry room remodel like for like. upgrading main panel to 200 amp. tankless water heater, upgrading hvac. | $150,000 |
| Sep 15, 2022 | Expired or cancelled cancelled Feb 2026 | 192 Emmett Ct | one bathroom and one kitchen remodel like for like. non structural.Details
one bathroom and one kitchen remodel like for like. non structural. | $24,000 |
| Sep 6, 2022 | Completed final sign-off Sep 2022 | 715 Newhall St | revision to existing permit #202204202633. only one bath remodelDetails
revision to existing permit #202204202633. only one bath remodel | |
| Aug 25, 2022 | In progress issued Sep 2024 | 158 15th Av | 3 story horizontal addition @ rear.all 3 levels increase the width of the(e)rear bump-out 5 feet,lower level,remodel (e)bath,convert garage & storage space to office,2 car tandem parking & family room/den.on main level,move kitchen to rear of house,add internal staircase.Details
3 story horizontal addition @ rear.all 3 levels increase the width of the(e)rear bump-out 5 feet,lower level,remodel (e)bath,convert garage & storage space to office,2 car tandem parking & family room/den.on main level,move kitchen to rear of house,add internal staircase. | $150,000 |
| Aug 19, 2022 | Completed final sign-off Mar 2024 | 169 Precita Av | bathroom remodel. replace floor, vanity, walls damage during water leak. bring plubimng and electrical up to code: update exposed sink and tub plumbing and drainage according to city code. no wall or structural changes.Details
bathroom remodel. replace floor, vanity, walls damage during water leak. bring plubimng and electrical up to code: update exposed sink and tub plumbing and drainage according to city code. no wall or structural changes. | $20,000 |
| Aug 2, 2022 | Completed final sign-off Nov 2022 | 453 Teresita Bl | kitchen & bathroom remodel like-for-likeDetails
kitchen & bathroom remodel like-for-like | $30,500 |
| Jul 18, 2022 | Completed final sign-off Nov 2024 | 132 Cortland Av | remodel a kitchen- like for like: remodel a bathroom- like for like. no structural work. same layout.Details
remodel a kitchen- like for like: remodel a bathroom- like for like. no structural work. same layout. | $65,000 |
| Jul 13, 2022 | Completed final sign-off Oct 2022 | 447 Hazelwood Av | add a new bathroom on 2/f.Details
add a new bathroom on 2/f. | $46,500 |
| Jul 6, 2022 | Never finaled issued Jul 2022, no final | 845 Dolores St | bathroom remodel like for likeDetails
bathroom remodel like for like | $9,700 |
| May 31, 2022 | Completed final sign-off Dec 2022 | 627 South Van Ness Av | remodel a bathroom like for like- tub shower: remodel a kitchen like for like upgrade everything up to codeDetails
remodel a bathroom like for like- tub shower: remodel a kitchen like for like upgrade everything up to code | $100,000 |
| May 31, 2022 | Completed final sign-off Jul 2022 | 1981 Funston Av | guest bathroom remodel: like for like walk in shower: upgrade everything up to code: master bathroom remodel: like for like: walk in shower tub upgrade everything up to codeDetails
guest bathroom remodel: like for like walk in shower: upgrade everything up to code: master bathroom remodel: like for like: walk in shower tub upgrade everything up to code | $80,000 |
| May 19, 2022 | Completed final sign-off Sep 2022 | 727 05th Av | remodel (1) kitchen and (1) bathroom on 4th floor. like to like. no structural work.Details
remodel (1) kitchen and (1) bathroom on 4th floor. like to like. no structural work. | $60,000 |
| May 17, 2022 | Completed final sign-off Apr 2023 | 1651 Burrows St | remodel kitchen & bath. remove walls. replace with aluminum clad wood windows in kitchen on 2nd fl. remodel bath on 1st fl.Details
remodel kitchen & bath. remove walls. replace with aluminum clad wood windows in kitchen on 2nd fl. remodel bath on 1st fl. | $60,000 |
| Apr 25, 2022 | Completed final sign-off Jun 2023 | 1242 23rd Av | remodel opening 2 livable floors, 3 bed 1.5 bath to 3 bed 2.5 bath. rewire panel upgrade 200 amp.Details
remodel opening 2 livable floors, 3 bed 1.5 bath to 3 bed 2.5 bath. rewire panel upgrade 200 amp. | $180,000 |
| Apr 20, 2022 | Completed final sign-off Sep 2022 | 715 Newhall St | 1 kitchen and 2 bathrooms remodel, relocate fridge and install new dishwasher, in kitchen relocate sink, canal tub and install walk in shower in bathroom, intall new subpanel. no new walls.Details
1 kitchen and 2 bathrooms remodel, relocate fridge and install new dishwasher, in kitchen relocate sink, canal tub and install walk in shower in bathroom, intall new subpanel. no new walls. | $60,000 |
| Mar 24, 2022 | Completed final sign-off Sep 2022 | 218 Thrift St | remodel kitchen and bath, remove wall on 2nd flr. add a bedroom, media and full bath on 1st floor. replace water heater, furnance. upgrade electrical and plumbing. replace roo due to skylights.Details
remodel kitchen and bath, remove wall on 2nd flr. add a bedroom, media and full bath on 1st floor. replace water heater, furnance. upgrade electrical and plumbing. replace roo due to skylights. | $90,000 |
| Mar 24, 2022 | Completed final sign-off Aug 2024 | 333 Precita Av | relocate kitchen and remove wall remodel bathrooms, relocate stairs, remodel central patio, replace window/doors not visible from street on 2nd floor. rearrange rooms including family bathroom, media and laundry. replace doors at rear 1st flr. replace side stucco at rear. repair dry rot at front. *Details
relocate kitchen and remove wall remodel bathrooms, relocate stairs, remodel central patio, replace window/doors not visible from street on 2nd floor. rearrange rooms including family bathroom, media and laundry. replace doors at rear 1st flr. replace side stucco at rear. repair dry rot at front. * | $250,000 |
| Mar 3, 2022 | Completed final sign-off May 2023 | 1382 10th Av | second floor kitchen and bath remodel, remove fire place replace windows on second and third floor.Details
second floor kitchen and bath remodel, remove fire place replace windows on second and third floor. | $100,000 |
| Feb 25, 2022 | Completed final sign-off Apr 2022 | 1569 45th Av | one bathroom remodel like to like. non structuralDetails
one bathroom remodel like to like. non structural | $20,000 |
| Feb 22, 2022 | Completed final sign-off Jan 2023 | 222 Anderson St | 1st floor: convert laundry room to bedroom by relocating non bearing wall, remodel (e) bathroom, kitchen remodel. 2nd floor add new bathroom by extending (e) dormer.Details
1st floor: convert laundry room to bedroom by relocating non bearing wall, remodel (e) bathroom, kitchen remodel. 2nd floor add new bathroom by extending (e) dormer. | $90,000 |
| Jan 31, 2022 | Completed final sign-off Mar 2022 | 311 Ashton Av | one bathroom remodel: remove tub, relocate toilet, add shower. bathrrom located on 2nd floor.Details
one bathroom remodel: remove tub, relocate toilet, add shower. bathrrom located on 2nd floor. | $25,000 |
| Jan 27, 2022 | Completed final sign-off Jun 2022 | 85 Buena Vista Tr | remodel one master bathroom, like to like. update plumbing, electric, new vanity, toilet, shower.Details
remodel one master bathroom, like to like. update plumbing, electric, new vanity, toilet, shower. | $30,000 |
| Jan 27, 2022 | Completed final sign-off Mar 2023 | 953 Clayton St | apt 3: remodel 2 full bathrooms. relocate toilet in 1 bath (bathroom in kind). install new subpanel.Details
apt 3: remodel 2 full bathrooms. relocate toilet in 1 bath (bathroom in kind). install new subpanel. | $50,000 |
| Jan 18, 2022 | Completed final sign-off Mar 2022 | 1399 Vallejo St | revision to bpa# 202112295170. replace window in kitchen (street facing). street visible window at 2nd floor proposed window double hung aluminum clad wood within existing opening. replace window in bathroom (non street facing).Details
revision to bpa# 202112295170. replace window in kitchen (street facing). street visible window at 2nd floor proposed window double hung aluminum clad wood within existing opening. replace window in bathroom (non street facing). | $7,000 |
| Jan 14, 2022 | Completed final sign-off Mar 2022 | 85 Idora Av | bathroom remodel: relocate toilet, change shower to tub.Details
bathroom remodel: relocate toilet, change shower to tub. | $20,000 |
| Dec 29, 2021 | Completed final sign-off Mar 2022 | 1399 Vallejo St | kitchen remodel: update plumbing and electrical to code, install 4 recesse lights, install kitchen cabinets, appliances, backsplash, countrertop, fixtures. bathroom remodel: update and locate plumbiing up to code, install new tub, tile, exhauset fan, vanity, toilet, udadate electric up to code.Details
kitchen remodel: update plumbing and electrical to code, install 4 recesse lights, install kitchen cabinets, appliances, backsplash, countrertop, fixtures. bathroom remodel: update and locate plumbiing up to code, install new tub, tile, exhauset fan, vanity, toilet, udadate electric up to code. | $138,555 |
| Nov 9, 2021 | Completed final sign-off Mar 2022 | 124 Marston Av | bathroom remodel, like for like: install plumbing up to code, update electric up to code, install new exhaust fan, install 2 recessed lights, install new sub floor, build new shower pan, install drywall,paint, and primer. install vanity, toilet, glass door. install tile up to ceiling.Details
bathroom remodel, like for like: install plumbing up to code, update electric up to code, install new exhaust fan, install 2 recessed lights, install new sub floor, build new shower pan, install drywall,paint, and primer. install vanity, toilet, glass door. install tile up to ceiling. | $34,550 |
| Oct 12, 2021 | Completed final sign-off Dec 2021 | 1590 09th Av | bathroom like to like. update plumbing and electric up to code. install new subpanel. no moving walls.Details
bathroom like to like. update plumbing and electric up to code. install new subpanel. no moving walls. | $12,000 |
| Oct 12, 2021 | Completed final sign-off May 2022 | 3882 Noriega St | replace 12 windows to new retrofit and 3 bathroom retrofit window total of 15 windows. u=.30maxDetails
replace 12 windows to new retrofit and 3 bathroom retrofit window total of 15 windows. u=.30max | $8,000 |
| Sep 29, 2021 | Completed final sign-off Dec 2022 | 8 San Gabriel Av | replace 1 windows with alum clad wood window at front. rearrange rooms and stairs, add a full bath, remodel bath and kitchen on 2/f. add bedrooms, media rooms,one and half bath, kitchentee, relocate/replace garage door, replace side door. enhance foundation on 1/f, replace water heater, furnace,Details
replace 1 windows with alum clad wood window at front. rearrange rooms and stairs, add a full bath, remodel bath and kitchen on 2/f. add bedrooms, media rooms,one and half bath, kitchentee, relocate/replace garage door, replace side door. enhance foundation on 1/f, replace water heater, furnace, | $180,000 |
| Aug 5, 2021 | Expired or cancelled expired Sep 2026 | 721 Bay St | upgrade main panel for 200amp. install new subpanel. remodel kitchen up to code. remodel bathroom and install tub up to code. remodel bathroom up to code and install shower pan. remodel bathroom downstair on g/f home theater up to code with shower pan. no alteration of wall, window and door.Details
upgrade main panel for 200amp. install new subpanel. remodel kitchen up to code. remodel bathroom and install tub up to code. remodel bathroom up to code and install shower pan. remodel bathroom downstair on g/f home theater up to code with shower pan. no alteration of wall, window and door. | $150,000 |
| Aug 5, 2021 | Completed final sign-off Mar 2023 | 277 Andover St | interior remodel of ground fl. to include (n) bath room (n) laundry (n) bed room, (n) family & study, & excavation for code ceiling ht. 2nd story remodel to include stair upgrade, remodeled kitchen, remodeled bath, & (n) powder roomDetails
interior remodel of ground fl. to include (n) bath room (n) laundry (n) bed room, (n) family & study, & excavation for code ceiling ht. 2nd story remodel to include stair upgrade, remodeled kitchen, remodeled bath, & (n) powder room | $160,000 |
| Jul 1, 2021 | Completed final sign-off Sep 2021 | 2217 Pacific Av | unit 3: remodel bathroom, like-for-likeDetails
unit 3: remodel bathroom, like-for-like | $38,000 |