Block 6778, lot 003
8 San Gabriel Ave
- City’s use
- Single Family Residential
- Built
- 1923
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 1,865 sq ft
- Lot
- 3,131 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 4, 2022 | Completed final sign-off Apr 2022 | 8 San Gabriel Av | All Type Remodeling Inc | reroofingDetails
reroofing | $6,900 |
| Apr 4, 2022 | Completed final sign-off Dec 2022 | 8 San Gabriel Av | All Type Remodeling Inc | replacing of 5 piece of plywood- 4x8 1/2 at in the roofDetails
replacing of 5 piece of plywood- 4x8 1/2 at in the roof | $6,300 |
| Sep 29, 2021 | Completed final sign-off Dec 2022 | 8 San Gabriel Av | Edri Construction Inc *See Notes* | replace 1 windows with alum clad wood window at front. rearrange rooms and stairs, add a full bath, remodel bath and kitchen on 2/f. add bedrooms, media rooms,one and half bath, kitchentee, relocate/replace garage door, replace side door. enhance foundation on 1/f, replace water heater, furnace,Details
replace 1 windows with alum clad wood window at front. rearrange rooms and stairs, add a full bath, remodel bath and kitchen on 2/f. add bedrooms, media rooms,one and half bath, kitchentee, relocate/replace garage door, replace side door. enhance foundation on 1/f, replace water heater, furnace, | $180,000 |
| Apr 29, 2008 | Completed final sign-off Jun 2008 | 8 San Gabriel Av | Lobo Construction | revision to pa# 2008/04/04/8819. install 13 vinyl double pane windows. install tile around (e) bathtub & bathroom floor. patch holes in bathroom with 1/2 sheetrock.Details
revision to pa# 2008/04/04/8819. install 13 vinyl double pane windows. install tile around (e) bathtub & bathroom floor. patch holes in bathroom with 1/2 sheetrock. | $6,000 |
| Apr 4, 2008 | Completed final sign-off Jun 2008 | 8 San Gabriel Av | Lobo Construction | kitchen remodel: insulate walls & ceiling, rewire kitchen (electrical work) sheetrock kitchen, tile floor. & install new cabinets & countertops. service upgrade. no structural work. 50% wattage must be high efficiency.Details
kitchen remodel: insulate walls & ceiling, rewire kitchen (electrical work) sheetrock kitchen, tile floor. & install new cabinets & countertops. service upgrade. no structural work. 50% wattage must be high efficiency. | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- All Type Remodeling Inc (2), Lobo Construction (2), Edri Construction Inc *See Notes*
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.