Back to kitchen remodel contractors
Dugarry Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Oct 2012 to Sep 2017
- Last 24 months
- 0 permits filed
93 permits since 2000: 74 completed, 13 never finaled, 6 expired or cancelled.
Of the 13 never-finaled permits, 4 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
34 kitchen remodel permits: 29 completed, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2017 | Completed final sign-off Jan 2018 | 1940 Broadway | #2e- remodel kitchen and bathroomDetails
#2e- remodel kitchen and bathroom | $30,000 |
| Jul 7, 2017 | Completed final sign-off Apr 2018 | 2 Miraloma Dr | kitchen and bathroom upgrades on all four and half bathrooms. refinish hardwood floors, upgrade lighting.Details
kitchen and bathroom upgrades on all four and half bathrooms. refinish hardwood floors, upgrade lighting. | $258,000 |
| Jun 30, 2017 | Completed final sign-off Jul 2018 | 1933 Jones St | kitchen remodeling, new bathroom, relocate laundry area, bedroom remodel, refinish existing bathroom, replace windows in kind (10) as indicated. structural, plumbing, mechanical as required/indicatedDetails
kitchen remodeling, new bathroom, relocate laundry area, bedroom remodel, refinish existing bathroom, replace windows in kind (10) as indicated. structural, plumbing, mechanical as required/indicated | $48,000 |
| Mar 29, 2017 | Completed final sign-off Jun 2017 | 38 Atalaya Tr | revision to permit #2017-01-04-6490. remove non bearing wall between kitchen and dining roomDetails
revision to permit #2017-01-04-6490. remove non bearing wall between kitchen and dining room | $4,000 |
| Mar 16, 2017 | Completed final sign-off May 2018 | 720 Teresita Bl | enclose central stair, new skylight/remodel downstairs/bathroom/ new entry/ remodel upstairs bath room/ remodel extg kitchen on 2nd floor/ replace all single pane windows/ new furnace(replace)/new water heater(replace)/upgrade electrical panel, add lighting, & upgrade electrical.Details
enclose central stair, new skylight/remodel downstairs/bathroom/ new entry/ remodel upstairs bath room/ remodel extg kitchen on 2nd floor/ replace all single pane windows/ new furnace(replace)/new water heater(replace)/upgrade electrical panel, add lighting, & upgrade electrical. | $199,733 |
| Feb 17, 2017 | Completed final sign-off May 2019 | 1787 10th Av | interior - residential remodel kitchen & bath on 2nd floor level. condition 1st level for living; laundry, office, rec room & bath.Details
interior - residential remodel kitchen & bath on 2nd floor level. condition 1st level for living; laundry, office, rec room & bath. | $67,000 |
| Jan 4, 2017 | Completed final sign-off Jun 2017 | 38 Atalaya Tr | remodel kitchens for 38 & 40 atlanya , install 2 windows in each kitchne not visible from the street and add laundry & washer in each kitchenDetails
remodel kitchens for 38 & 40 atlanya , install 2 windows in each kitchne not visible from the street and add laundry & washer in each kitchen | $40,000 |
| Nov 7, 2016 | Completed final sign-off Apr 2018 | 1554 Masonic Av | replace (7) windows, 2 of them in bathroom, 2 of them in living room & 3 in kitchen. not visible from street.Details
replace (7) windows, 2 of them in bathroom, 2 of them in living room & 3 in kitchen. not visible from street. | $2,800 |
| Sep 12, 2016 | Never finaled issued Sep 2016, no final | 236 Ashbury St | remodel of extg residence: no addition and no work on front exterior. unconditioned garage/storage to be made into conditioned living space connected to main residence with kitchen and bath remodel. alteration of (e) windows and (n) windows on side and rear elevations.Details
remodel of extg residence: no addition and no work on front exterior. unconditioned garage/storage to be made into conditioned living space connected to main residence with kitchen and bath remodel. alteration of (e) windows and (n) windows on side and rear elevations. | $150,000 |
| Aug 18, 2016 | Completed final sign-off Feb 2018 | 2522 Octavia St | remodel kitchen, (2) bathroom, modify (e) laundry room.Details
remodel kitchen, (2) bathroom, modify (e) laundry room. | $35,000 |
| Jul 25, 2016 | Completed final sign-off Feb 2017 | 1554 Masonic Av | revision to pa# 201604114405: remodel kitchen & bathroomDetails
revision to pa# 201604114405: remodel kitchen & bathroom | $26,000 |
| Jun 10, 2016 | Never finaled issued Jul 2016, no final | 1256 28th Av | 2nd flr: remove lightwell and remodel kitchen. remove illegal wet bar in 1st floor.Details
2nd flr: remove lightwell and remodel kitchen. remove illegal wet bar in 1st floor. | $22,000 |
| Mar 9, 2016 | Completed final sign-off Jul 2016 | 473 Gold Mine Dr | remodel kitchen, no change in wall layout and openings. bring electric and plumbing up to code. lighting shall be min. 50% wattage high efficacy.Details
remodel kitchen, no change in wall layout and openings. bring electric and plumbing up to code. lighting shall be min. 50% wattage high efficacy. | $28,000 |
| Mar 9, 2016 | Expired or cancelled expired Dec 2018 | 22 Liberty St | remodel kitchen, bathroom and laundry room. replace (2) windows, (one in kitchen & one in bathroom). bring electrical / plumbing up to code. n/a maher ord 155-13Details
remodel kitchen, bathroom and laundry room. replace (2) windows, (one in kitchen & one in bathroom). bring electrical / plumbing up to code. n/a maher ord 155-13 | $45,000 |
| Mar 9, 2016 | Never finaled issued Mar 2016, no final | 473 Gold Mine Dr | remove kitchen wall between kitchen and dining room as shown on plans, and install new beam support as shown on plans. kitchen remodeling under seperate permit.Details
remove kitchen wall between kitchen and dining room as shown on plans, and install new beam support as shown on plans. kitchen remodeling under seperate permit. | $7,000 |
| Mar 3, 2016 | Completed final sign-off Mar 2019 | 843 Capp St | remove 2nd fl deck & stair to grade. remodel kitchen & 1st fl bathroom. (n) 1-story rear addition w/ roof deck @ 2nd fl w/ spiral stair to grade.Details
remove 2nd fl deck & stair to grade. remodel kitchen & 1st fl bathroom. (n) 1-story rear addition w/ roof deck @ 2nd fl w/ spiral stair to grade. | $145,000 |
| Oct 1, 2015 | Completed final sign-off Feb 2016 | 1527 35th Av | kitchen and bathroom remodel - remodel bathroom to create a bathroom and a seperate toilet/power roomDetails
kitchen and bathroom remodel - remodel bathroom to create a bathroom and a seperate toilet/power room | $55,000 |
| Jul 2, 2015 | Completed final sign-off Feb 2016 | 535 Eureka St | remodel bathroom, remodel & relocate sitting room & kitchen. open wall between kitchen & sitting room. replace two windows & passage door with two new windows & sliding glass door to back porch (windows not visible from street). level out floor at sunroom.Details
remodel bathroom, remodel & relocate sitting room & kitchen. open wall between kitchen & sitting room. replace two windows & passage door with two new windows & sliding glass door to back porch (windows not visible from street). level out floor at sunroom. | $66,500 |
| Jun 1, 2015 | Completed final sign-off Dec 2015 | 1976 15th St | remodel existing kitchen, remodel existing bathroom, provide new power room in existing closet, relocate laundry into existing pantryDetails
remodel existing kitchen, remodel existing bathroom, provide new power room in existing closet, relocate laundry into existing pantry | $38,000 |
| Jan 26, 2015 | Completed final sign-off Jun 2015 | 458 Molimo Dr | remodel kitchen, bring electric & plumbing upto code. nothing changes, replace with new cabinet & counter tops.Details
remodel kitchen, bring electric & plumbing upto code. nothing changes, replace with new cabinet & counter tops. | $25,000 |
| Dec 31, 2014 | Never finaled issued Dec 2014, no final | 1901 35th Av | remodel kitchen & bath, bring electrical & plumbing up to code.Details
remodel kitchen & bath, bring electrical & plumbing up to code. | $30,000 |
| Nov 26, 2014 | Completed final sign-off Sep 2015 | 2667 17th Av | 1st fl remove toilet room, wet bar, and new bath and closets. 2nd fl remodel kitchen and fill in notch at center patio (add 3.5 sf) remodel bathroom, replace center patio flooring and waterproofingDetails
1st fl remove toilet room, wet bar, and new bath and closets. 2nd fl remodel kitchen and fill in notch at center patio (add 3.5 sf) remodel bathroom, replace center patio flooring and waterproofing | $75,350 |
| Oct 2, 2014 | Completed final sign-off Feb 2015 | 3672 24th St | remodel kitchen & two bathrooms, new electric & plumbing to code, no change on walls.Details
remodel kitchen & two bathrooms, new electric & plumbing to code, no change on walls. | $40,000 |
| Sep 24, 2014 | Completed final sign-off Jan 2015 | 80 Jersey St | 2nd floor: remodel existing kitchen, bathroom, w.c. & relocate washer & dryer, relocate stove, change shower to toilet, add sink in w.c.Details
2nd floor: remodel existing kitchen, bathroom, w.c. & relocate washer & dryer, relocate stove, change shower to toilet, add sink in w.c. | $60,000 |
| Jul 17, 2014 | Completed final sign-off Dec 2014 | 547 Hill St | remodel kitchen and relocate bath at 547 hill stDetails
remodel kitchen and relocate bath at 547 hill st | $22,000 |
| Mar 10, 2014 | Completed final sign-off Jul 2014 | 659 Castro St | remodel kitchen and bathroom, new electric in kitchen & bathroom, new plumbing in kitchenDetails
remodel kitchen and bathroom, new electric in kitchen & bathroom, new plumbing in kitchen | $25,000 |
| Mar 3, 2014 | Completed final sign-off Jul 2014 | 384 Somerset St | remodel 1 kitchen and 1 bathroom. new cabinets, countertops in bathroom, new tub toilet vanity and tile. bring electric and plumbing up to code in bathroom and kitchen only. no change of walals, windows and doors.Details
remodel 1 kitchen and 1 bathroom. new cabinets, countertops in bathroom, new tub toilet vanity and tile. bring electric and plumbing up to code in bathroom and kitchen only. no change of walals, windows and doors. | $25,000 |
| Jan 27, 2014 | Completed final sign-off Apr 2014 | 3993 24th St | kitchen & bathroom remodel in unit a, bring electrical and plumbing up to code, nothing other changes. no new wall & no existing wall relocation. lighting in kitchen & bathroom remodel shall comply with cec 150(k)8 & 150(k)10.Details
kitchen & bathroom remodel in unit a, bring electrical and plumbing up to code, nothing other changes. no new wall & no existing wall relocation. lighting in kitchen & bathroom remodel shall comply with cec 150(k)8 & 150(k)10. | $30,000 |
| Jan 9, 2014 | Completed final sign-off Dec 2014 | 732 Castro St | remodel kitchen new sheetrock. insulation and cabinets. bring plmg and elect. up to code lighting shall comply to t-24.Details
remodel kitchen new sheetrock. insulation and cabinets. bring plmg and elect. up to code lighting shall comply to t-24. | $15,000 |
| Oct 24, 2013 | Completed final sign-off Dec 2013 | 445 Molimo Dr | remodel kitchen, bring plumbing and electric upto code, no change of wall, door and window.Details
remodel kitchen, bring plumbing and electric upto code, no change of wall, door and window. | $10,000 |
| Aug 2, 2013 | Completed final sign-off Jan 2014 | 76 Jersey St | remodel 2.5 bathroom, remodel kitchen, bring all up to code. nothing changes.Details
remodel 2.5 bathroom, remodel kitchen, bring all up to code. nothing changes. | $40,000 |
| Jun 14, 2013 | Completed final sign-off Aug 2013 | 1412 Alabama St | remove & replace cabinet in kitchen, bring electric and plumbing upto code.Details
remove & replace cabinet in kitchen, bring electric and plumbing upto code. | $10,000 |
| May 2, 2013 | Completed final sign-off Jul 2013 | 105 Palm Av | unit #3: remodel kitchen, update electric and plumbing to code, & remodel one bath in unit #3; no change in wall layout & openings, min. 50% kitchen lighting wattage shall be high efficacy; bathrm lighting shall be high efficacy or controlled by manual on sensorDetails
unit #3: remodel kitchen, update electric and plumbing to code, & remodel one bath in unit #3; no change in wall layout & openings, min. 50% kitchen lighting wattage shall be high efficacy; bathrm lighting shall be high efficacy or controlled by manual on sensor | $20,000 |
| Oct 4, 2012 | Completed final sign-off Jun 2015 | 769 Elizabeth St | add new 2 story structure at rear of dwelling for use as kitchen, family room, & roof deck. add new half bath & master bathroom.Details
add new 2 story structure at rear of dwelling for use as kitchen, family room, & roof deck. add new half bath & master bathroom. | $175,000 |