Dugarry Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Oct 2012 to Sep 2017
- Last 24 months
- 0 permits filed
93 permits since 2000: 74 completed, 13 never finaled, 6 expired or cancelled.
Of the 13 never-finaled permits, 4 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 192 days from filing to permit and 752 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2016 | Completed final sign-off Mar 2019 | 843 Capp St | remove 2nd fl deck & stair to grade. remodel kitchen & 1st fl bathroom. (n) 1-story rear addition w/ roof deck @ 2nd fl w/ spiral stair to grade.Details
remove 2nd fl deck & stair to grade. remodel kitchen & 1st fl bathroom. (n) 1-story rear addition w/ roof deck @ 2nd fl w/ spiral stair to grade. | $145,000 |
| Dec 22, 2015 | Completed final sign-off Feb 2018 | 7 Bennington St | 1st flr. remodel storage area behind garage to add bedroom, bath & media room. 2nd flr- remove non bearing wall between living & dining rms, build (n) enclosed stairway to 1st flr, remove deck & stairs @ rear yard.Details
1st flr. remodel storage area behind garage to add bedroom, bath & media room. 2nd flr- remove non bearing wall between living & dining rms, build (n) enclosed stairway to 1st flr, remove deck & stairs @ rear yard. | $85,000 |
| Apr 10, 2015 | Completed final sign-off Sep 2016 | 771 Elizabeth St | 1st fl-relocate ext. stairs to 2nd fl, deck, construct storage room under (n) 2nd fl. deck. 2nd fl- replace deck @ rear yard. 3rd fl-construct (n) deck over 2nd fl roof. remodel master. bath.Details
1st fl-relocate ext. stairs to 2nd fl, deck, construct storage room under (n) 2nd fl. deck. 2nd fl- replace deck @ rear yard. 3rd fl-construct (n) deck over 2nd fl roof. remodel master. bath. | $65,000 |
| Nov 26, 2014 | Completed final sign-off Nov 2019 | 1883 Church St | 3-story horizontal addition at rear yard. (n) deck @ rear yard. 2 (n) baths, 1 (n) bedroom.Details
3-story horizontal addition at rear yard. (n) deck @ rear yard. 2 (n) baths, 1 (n) bedroom. | $140,000 |