Back to bathroom remodel contractors
Dugarry Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Oct 2012 to Sep 2017
- Last 24 months
- 0 permits filed
93 permits since 2000: 74 completed, 13 never finaled, 6 expired or cancelled.
Of the 13 never-finaled permits, 4 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
54 bathroom remodel permits: 49 completed, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2017 | Completed final sign-off Dec 2017 | 2574 17th Av | remodel bathroom, new plumbing & electrical. removing everything and replacing as in kind.Details
remodel bathroom, new plumbing & electrical. removing everything and replacing as in kind. | $15,000 |
| Aug 28, 2017 | Completed final sign-off Jan 2018 | 1940 Broadway | #2e- remodel kitchen and bathroomDetails
#2e- remodel kitchen and bathroom | $30,000 |
| Jul 11, 2017 | Completed final sign-off Oct 2017 | 38 Nordhoff St | remodel split bathroom bring electrical and plumbing up to code.Details
remodel split bathroom bring electrical and plumbing up to code. | $15,000 |
| Jul 7, 2017 | Completed final sign-off Apr 2018 | 2 Miraloma Dr | kitchen and bathroom upgrades on all four and half bathrooms. refinish hardwood floors, upgrade lighting.Details
kitchen and bathroom upgrades on all four and half bathrooms. refinish hardwood floors, upgrade lighting. | $258,000 |
| Jun 30, 2017 | Completed final sign-off Jul 2018 | 1933 Jones St | kitchen remodeling, new bathroom, relocate laundry area, bedroom remodel, refinish existing bathroom, replace windows in kind (10) as indicated. structural, plumbing, mechanical as required/indicatedDetails
kitchen remodeling, new bathroom, relocate laundry area, bedroom remodel, refinish existing bathroom, replace windows in kind (10) as indicated. structural, plumbing, mechanical as required/indicated | $48,000 |
| Mar 16, 2017 | Completed final sign-off May 2018 | 720 Teresita Bl | enclose central stair, new skylight/remodel downstairs/bathroom/ new entry/ remodel upstairs bath room/ remodel extg kitchen on 2nd floor/ replace all single pane windows/ new furnace(replace)/new water heater(replace)/upgrade electrical panel, add lighting, & upgrade electrical.Details
enclose central stair, new skylight/remodel downstairs/bathroom/ new entry/ remodel upstairs bath room/ remodel extg kitchen on 2nd floor/ replace all single pane windows/ new furnace(replace)/new water heater(replace)/upgrade electrical panel, add lighting, & upgrade electrical. | $199,733 |
| Feb 17, 2017 | Completed final sign-off May 2019 | 1787 10th Av | interior - residential remodel kitchen & bath on 2nd floor level. condition 1st level for living; laundry, office, rec room & bath.Details
interior - residential remodel kitchen & bath on 2nd floor level. condition 1st level for living; laundry, office, rec room & bath. | $67,000 |
| Jan 4, 2017 | Completed final sign-off May 2017 | 24 Cerritos Av | remodel bathroom upstairs,new shower pan new electric & plumbingDetails
remodel bathroom upstairs,new shower pan new electric & plumbing | $15,000 |
| Jan 4, 2017 | Completed final sign-off May 2017 | 2461 Gough St | remodel bathroom with shoer pan bathtub vanity & toilet new electric & plumbingDetails
remodel bathroom with shoer pan bathtub vanity & toilet new electric & plumbing | $15,000 |
| Nov 7, 2016 | Completed final sign-off Apr 2018 | 1554 Masonic Av | replace (7) windows, 2 of them in bathroom, 2 of them in living room & 3 in kitchen. not visible from street.Details
replace (7) windows, 2 of them in bathroom, 2 of them in living room & 3 in kitchen. not visible from street. | $2,800 |
| Sep 12, 2016 | Never finaled issued Sep 2016, no final | 236 Ashbury St | remodel of extg residence: no addition and no work on front exterior. unconditioned garage/storage to be made into conditioned living space connected to main residence with kitchen and bath remodel. alteration of (e) windows and (n) windows on side and rear elevations.Details
remodel of extg residence: no addition and no work on front exterior. unconditioned garage/storage to be made into conditioned living space connected to main residence with kitchen and bath remodel. alteration of (e) windows and (n) windows on side and rear elevations. | $150,000 |
| Aug 18, 2016 | Completed final sign-off Feb 2018 | 2522 Octavia St | remodel kitchen, (2) bathroom, modify (e) laundry room.Details
remodel kitchen, (2) bathroom, modify (e) laundry room. | $35,000 |
| Aug 9, 2016 | Completed final sign-off Oct 2016 | 3894 22nd St | remodel bathroom, bring electric / plumbing up to code. replace window with tempered window not visible from the street , same size, same location. n/a maherDetails
remodel bathroom, bring electric / plumbing up to code. replace window with tempered window not visible from the street , same size, same location. n/a maher | $10,000 |
| Aug 4, 2016 | Completed final sign-off Mar 2018 | 574 Dellbrook Av | infill at rear under cantilevered portion of 2nd level, enlarge window at front facade, remodel of upper level bathroom, reconfiguration of lower level to convert poart of garage into habitable space.Details
infill at rear under cantilevered portion of 2nd level, enlarge window at front facade, remodel of upper level bathroom, reconfiguration of lower level to convert poart of garage into habitable space. | $30,000 |
| Jul 25, 2016 | Completed final sign-off Feb 2017 | 1554 Masonic Av | revision to pa# 201604114405: remodel kitchen & bathroomDetails
revision to pa# 201604114405: remodel kitchen & bathroom | $26,000 |
| Apr 26, 2016 | Completed final sign-off Sep 2016 | 1132 Pine St | remodel bathroom. bring electric and plumbing up to code. no structural work.Details
remodel bathroom. bring electric and plumbing up to code. no structural work. | $12,000 |
| Mar 9, 2016 | Expired or cancelled expired Dec 2018 | 22 Liberty St | remodel kitchen, bathroom and laundry room. replace (2) windows, (one in kitchen & one in bathroom). bring electrical / plumbing up to code. n/a maher ord 155-13Details
remodel kitchen, bathroom and laundry room. replace (2) windows, (one in kitchen & one in bathroom). bring electrical / plumbing up to code. n/a maher ord 155-13 | $45,000 |
| Mar 9, 2016 | Completed final sign-off Apr 2016 | 131 Collingwood St | install (2) windows in existing opening in bathroom. windows can not be seen from the streetDetails
install (2) windows in existing opening in bathroom. windows can not be seen from the street | $200 |
| Mar 3, 2016 | Completed final sign-off Mar 2019 | 843 Capp St | remove 2nd fl deck & stair to grade. remodel kitchen & 1st fl bathroom. (n) 1-story rear addition w/ roof deck @ 2nd fl w/ spiral stair to grade.Details
remove 2nd fl deck & stair to grade. remodel kitchen & 1st fl bathroom. (n) 1-story rear addition w/ roof deck @ 2nd fl w/ spiral stair to grade. | $145,000 |
| Dec 30, 2015 | Completed final sign-off Apr 2016 | 131 Collingwood St | bathroom remodel, bring electrical and plumbing up to code. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5.Details
bathroom remodel, bring electrical and plumbing up to code. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5. | $12,000 |
| Dec 22, 2015 | Completed final sign-off Feb 2018 | 7 Bennington St | 1st flr. remodel storage area behind garage to add bedroom, bath & media room. 2nd flr- remove non bearing wall between living & dining rms, build (n) enclosed stairway to 1st flr, remove deck & stairs @ rear yard.Details
1st flr. remodel storage area behind garage to add bedroom, bath & media room. 2nd flr- remove non bearing wall between living & dining rms, build (n) enclosed stairway to 1st flr, remove deck & stairs @ rear yard. | $85,000 |
| Oct 1, 2015 | Completed final sign-off Feb 2016 | 1527 35th Av | kitchen and bathroom remodel - remodel bathroom to create a bathroom and a seperate toilet/power roomDetails
kitchen and bathroom remodel - remodel bathroom to create a bathroom and a seperate toilet/power room | $55,000 |
| Sep 16, 2015 | Completed final sign-off Dec 2015 | 2231 29th Av | remodel bathroom upstairs. bring electric and plumbing up to code.Details
remodel bathroom upstairs. bring electric and plumbing up to code. | $10,000 |
| Sep 2, 2015 | Completed final sign-off Feb 2016 | 115 Collingwood St | level 1-3 remove brick chimney and fireplaces, level 3 add bathroom, add closet, relocate washer and dryer, convert living room to bedroom and convert laundry room to office.Details
level 1-3 remove brick chimney and fireplaces, level 3 add bathroom, add closet, relocate washer and dryer, convert living room to bedroom and convert laundry room to office. | $30,000 |
| Aug 6, 2015 | Completed final sign-off Sep 2015 | 469 Frederick St | remodel of two (e) bathrooms and update finishes.Details
remodel of two (e) bathrooms and update finishes. | $57,000 |
| Jul 2, 2015 | Completed final sign-off Feb 2016 | 535 Eureka St | remodel bathroom, remodel & relocate sitting room & kitchen. open wall between kitchen & sitting room. replace two windows & passage door with two new windows & sliding glass door to back porch (windows not visible from street). level out floor at sunroom.Details
remodel bathroom, remodel & relocate sitting room & kitchen. open wall between kitchen & sitting room. replace two windows & passage door with two new windows & sliding glass door to back porch (windows not visible from street). level out floor at sunroom. | $66,500 |
| Jun 26, 2015 | Never finaled issued Jul 2015, no final | 107 Caselli Av | convert basement storage into new master bedroom, bath, closet, laundry with new internal stairs to existing 1st fl above. 2 new double hung wood windows and 1 replacement wood window at front facade, new storage closet at basementDetails
convert basement storage into new master bedroom, bath, closet, laundry with new internal stairs to existing 1st fl above. 2 new double hung wood windows and 1 replacement wood window at front facade, new storage closet at basement | $90,000 |
| Jun 2, 2015 | Completed final sign-off Aug 2015 | 258 Maynard St | 2nd fl bath remodel. remove tub, shower, relocate toilet, vanity/sink, remove non load bearing wall, replace tileDetails
2nd fl bath remodel. remove tub, shower, relocate toilet, vanity/sink, remove non load bearing wall, replace tile | $10,000 |
| Jun 1, 2015 | Completed final sign-off Dec 2015 | 1976 15th St | remodel existing kitchen, remodel existing bathroom, provide new power room in existing closet, relocate laundry into existing pantryDetails
remodel existing kitchen, remodel existing bathroom, provide new power room in existing closet, relocate laundry into existing pantry | $38,000 |
| May 29, 2015 | Completed final sign-off Jul 2015 | 2674 21st Av | remodel bathroom upper level bring electric & plumbing up to code. high efficacy lighting or control by manual on sensor with main high efficacy lighting.Details
remodel bathroom upper level bring electric & plumbing up to code. high efficacy lighting or control by manual on sensor with main high efficacy lighting. | $10,000 |
| Apr 10, 2015 | Completed final sign-off Sep 2016 | 771 Elizabeth St | 1st fl-relocate ext. stairs to 2nd fl, deck, construct storage room under (n) 2nd fl. deck. 2nd fl- replace deck @ rear yard. 3rd fl-construct (n) deck over 2nd fl roof. remodel master. bath.Details
1st fl-relocate ext. stairs to 2nd fl, deck, construct storage room under (n) 2nd fl. deck. 2nd fl- replace deck @ rear yard. 3rd fl-construct (n) deck over 2nd fl roof. remodel master. bath. | $65,000 |
| Mar 12, 2015 | Completed final sign-off Jul 2015 | 255 Crestmont Dr | remodel 2 1/2 bathrooms. bring electric and plumbing up to code. upstairs bathrooms.Details
remodel 2 1/2 bathrooms. bring electric and plumbing up to code. upstairs bathrooms. | $35,000 |
| Mar 4, 2015 | Completed final sign-off May 2015 | 431 Bosworth St | bathroom remodel: replace bath tub, shower, cabinets and bring electrical and plumbing up to code. no new wall and ano existing wall relocation. lighting shall comply with cec 150.0(k)3.Details
bathroom remodel: replace bath tub, shower, cabinets and bring electrical and plumbing up to code. no new wall and ano existing wall relocation. lighting shall comply with cec 150.0(k)3. | $10,000 |
| Dec 31, 2014 | Completed final sign-off Mar 2015 | 241 07th Av | remodel bathroom, bring electrical & plumbing up to code.Details
remodel bathroom, bring electrical & plumbing up to code. | $10,000 |
| Dec 31, 2014 | Never finaled issued Dec 2014, no final | 1901 35th Av | remodel kitchen & bath, bring electrical & plumbing up to code.Details
remodel kitchen & bath, bring electrical & plumbing up to code. | $30,000 |
| Dec 2, 2014 | Completed final sign-off Feb 2015 | 151 Skyview Wy | remodel bathroom - bring electical and plumbing up to code in bathroom, nothing changes. to comply with cec150.0(k)5Details
remodel bathroom - bring electical and plumbing up to code in bathroom, nothing changes. to comply with cec150.0(k)5 | $10,000 |
| Nov 26, 2014 | Completed final sign-off Sep 2015 | 2667 17th Av | 1st fl remove toilet room, wet bar, and new bath and closets. 2nd fl remodel kitchen and fill in notch at center patio (add 3.5 sf) remodel bathroom, replace center patio flooring and waterproofingDetails
1st fl remove toilet room, wet bar, and new bath and closets. 2nd fl remodel kitchen and fill in notch at center patio (add 3.5 sf) remodel bathroom, replace center patio flooring and waterproofing | $75,350 |
| Nov 26, 2014 | Completed final sign-off Nov 2019 | 1883 Church St | 3-story horizontal addition at rear yard. (n) deck @ rear yard. 2 (n) baths, 1 (n) bedroom.Details
3-story horizontal addition at rear yard. (n) deck @ rear yard. 2 (n) baths, 1 (n) bedroom. | $140,000 |
| Oct 27, 2014 | Completed final sign-off Jan 2015 | 1823 26th Av | remodel bathroom. bring electric and plumbing in bathroom up to code.Details
remodel bathroom. bring electric and plumbing in bathroom up to code. | $10,000 |
| Oct 27, 2014 | Completed final sign-off Dec 2014 | 1518 24th Av | remodel bathroom. bring electric and plubing up to code in bathroomDetails
remodel bathroom. bring electric and plubing up to code in bathroom | $10,000 |
| Oct 2, 2014 | Completed final sign-off Feb 2015 | 3672 24th St | remodel kitchen & two bathrooms, new electric & plumbing to code, no change on walls.Details
remodel kitchen & two bathrooms, new electric & plumbing to code, no change on walls. | $40,000 |
| Sep 24, 2014 | Completed final sign-off Jan 2015 | 80 Jersey St | 2nd floor: remodel existing kitchen, bathroom, w.c. & relocate washer & dryer, relocate stove, change shower to toilet, add sink in w.c.Details
2nd floor: remodel existing kitchen, bathroom, w.c. & relocate washer & dryer, relocate stove, change shower to toilet, add sink in w.c. | $60,000 |
| Jul 30, 2014 | Never finaled issued Aug 2014, no final | 547 Hill St | correct location of bath on extg demolition 1st floor plan on sheet a1.0. revision to permit #201407171456. for documentation only.Details
correct location of bath on extg demolition 1st floor plan on sheet a1.0. revision to permit #201407171456. for documentation only. | |
| Jul 17, 2014 | Completed final sign-off Dec 2014 | 721 Castro St | add bath and closet at entry hall.Details
add bath and closet at entry hall. | $15,000 |
| Jul 17, 2014 | Completed final sign-off Dec 2014 | 547 Hill St | remodel kitchen and relocate bath at 547 hill stDetails
remodel kitchen and relocate bath at 547 hill st | $22,000 |
| Jun 23, 2014 | Completed final sign-off Jul 2014 | 21 Rutledge St | remodel bathroom, bring electrical & plumbing work up to code cec150(k) 10Details
remodel bathroom, bring electrical & plumbing work up to code cec150(k) 10 | $10,000 |
| Mar 10, 2014 | Completed final sign-off Jul 2014 | 659 Castro St | remodel kitchen and bathroom, new electric in kitchen & bathroom, new plumbing in kitchenDetails
remodel kitchen and bathroom, new electric in kitchen & bathroom, new plumbing in kitchen | $25,000 |
| Mar 3, 2014 | Completed final sign-off Jul 2014 | 384 Somerset St | remodel 1 kitchen and 1 bathroom. new cabinets, countertops in bathroom, new tub toilet vanity and tile. bring electric and plumbing up to code in bathroom and kitchen only. no change of walals, windows and doors.Details
remodel 1 kitchen and 1 bathroom. new cabinets, countertops in bathroom, new tub toilet vanity and tile. bring electric and plumbing up to code in bathroom and kitchen only. no change of walals, windows and doors. | $25,000 |
| Feb 20, 2014 | Completed final sign-off May 2014 | 719 Castro St | remodel bathroom, plumbing & electrical. new circuits & plugs. new vanity, new shower.Details
remodel bathroom, plumbing & electrical. new circuits & plugs. new vanity, new shower. | $10,000 |
| Jan 27, 2014 | Completed final sign-off Apr 2014 | 3993 24th St | kitchen & bathroom remodel in unit a, bring electrical and plumbing up to code, nothing other changes. no new wall & no existing wall relocation. lighting in kitchen & bathroom remodel shall comply with cec 150(k)8 & 150(k)10.Details
kitchen & bathroom remodel in unit a, bring electrical and plumbing up to code, nothing other changes. no new wall & no existing wall relocation. lighting in kitchen & bathroom remodel shall comply with cec 150(k)8 & 150(k)10. | $30,000 |
| Aug 2, 2013 | Completed final sign-off Jan 2014 | 76 Jersey St | remodel 2.5 bathroom, remodel kitchen, bring all up to code. nothing changes.Details
remodel 2.5 bathroom, remodel kitchen, bring all up to code. nothing changes. | $40,000 |
| Jun 28, 2013 | Completed final sign-off Sep 2013 | 2749 Steiner St | remodel bathroom, change electric & bring up to code, new plumbing, toilet, bathtub, sink, shower + tile, shower pan; lighting shall comply w/t-24.Details
remodel bathroom, change electric & bring up to code, new plumbing, toilet, bathtub, sink, shower + tile, shower pan; lighting shall comply w/t-24. | $10,000 |
| May 2, 2013 | Completed final sign-off Jul 2013 | 105 Palm Av | unit #3: remodel kitchen, update electric and plumbing to code, & remodel one bath in unit #3; no change in wall layout & openings, min. 50% kitchen lighting wattage shall be high efficacy; bathrm lighting shall be high efficacy or controlled by manual on sensorDetails
unit #3: remodel kitchen, update electric and plumbing to code, & remodel one bath in unit #3; no change in wall layout & openings, min. 50% kitchen lighting wattage shall be high efficacy; bathrm lighting shall be high efficacy or controlled by manual on sensor | $20,000 |
| Oct 4, 2012 | Completed final sign-off Jun 2015 | 769 Elizabeth St | add new 2 story structure at rear of dwelling for use as kitchen, family room, & roof deck. add new half bath & master bathroom.Details
add new 2 story structure at rear of dwelling for use as kitchen, family room, & roof deck. add new half bath & master bathroom. | $175,000 |