Don Strauss Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Jun 2017
- Last 24 months
- 0 permits filed
19 permits since 2000: 18 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 29 days from filing to permit and 294 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2011 | Completed final sign-off Feb 2012 | 276 Fowler Av | remodel existing room in garage: add new bath, new hallway to connect upstairs stair to bedroom & bath. new deck 24" above grade. new wall plugs/lighting, new insulation, new sheetrock, new floor & flooring, new exit to yard with landing.Details
remodel existing room in garage: add new bath, new hallway to connect upstairs stair to bedroom & bath. new deck 24" above grade. new wall plugs/lighting, new insulation, new sheetrock, new floor & flooring, new exit to yard with landing. | $50,000 |