Back to bathroom remodel contractors
Don Strauss Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Jun 2017
- Last 24 months
- 0 permits filed
19 permits since 2000: 18 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 294 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2017 | Completed final sign-off May 2018 | 1479 34th Av | demo bathroom to studs:isntall new insulation, elecvtrical,tub, shower, tile, fan, toilet, sink and finish floor and wall board, shower pan, etc, plumbing fixtures. demo kitchen to studs: install new insualtion, electrical,plumbing fixtures,hook-up sink, cabinets, wallboard, counters, floor finishesDetails
demo bathroom to studs:isntall new insulation, elecvtrical,tub, shower, tile, fan, toilet, sink and finish floor and wall board, shower pan, etc, plumbing fixtures. demo kitchen to studs: install new insualtion, electrical,plumbing fixtures,hook-up sink, cabinets, wallboard, counters, floor finishes | $40,000 |
| Apr 22, 2015 | Completed final sign-off Aug 2015 | 794 28th Av | bathroom remodel: demo existing bath tub,toilet,sink,wall coverings. install new insulation,wiring,plumbing,bath tub,toilet,sink,sheetrock. lighting shall comply with cec 150.0(k)5.Details
bathroom remodel: demo existing bath tub,toilet,sink,wall coverings. install new insulation,wiring,plumbing,bath tub,toilet,sink,sheetrock. lighting shall comply with cec 150.0(k)5. | $20,000 |
| Oct 29, 2013 | Completed final sign-off Sep 2014 | 1479 34th Av | legalize existing master bedroom, bath, study at 1st fl level. expand and replace shower, install expaned study perimeter, build fire wall between garage and living space and other code compliance items, rated doors, electric upadte, plumbing, insulation; modification to rear deckDetails
legalize existing master bedroom, bath, study at 1st fl level. expand and replace shower, install expaned study perimeter, build fire wall between garage and living space and other code compliance items, rated doors, electric upadte, plumbing, insulation; modification to rear deck | $30,000 |
| Apr 12, 2011 | Completed final sign-off Feb 2012 | 276 Fowler Av | remodel existing room in garage: add new bath, new hallway to connect upstairs stair to bedroom & bath. new deck 24" above grade. new wall plugs/lighting, new insulation, new sheetrock, new floor & flooring, new exit to yard with landing.Details
remodel existing room in garage: add new bath, new hallway to connect upstairs stair to bedroom & bath. new deck 24" above grade. new wall plugs/lighting, new insulation, new sheetrock, new floor & flooring, new exit to yard with landing. | $50,000 |
| Dec 23, 2003 | Completed final sign-off May 2004 | 281 Hazelwood Av | remove all bathroom fixtures and tile, flooring and plasterDetails
remove all bathroom fixtures and tile, flooring and plaster | $20,000 |