Back to kitchen remodel contractors
Don Strauss Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Jun 2017
- Last 24 months
- 0 permits filed
19 permits since 2000: 18 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 123 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2017 | Completed final sign-off May 2018 | 1479 34th Av | demo bathroom to studs:isntall new insulation, elecvtrical,tub, shower, tile, fan, toilet, sink and finish floor and wall board, shower pan, etc, plumbing fixtures. demo kitchen to studs: install new insualtion, electrical,plumbing fixtures,hook-up sink, cabinets, wallboard, counters, floor finishesDetails
demo bathroom to studs:isntall new insulation, elecvtrical,tub, shower, tile, fan, toilet, sink and finish floor and wall board, shower pan, etc, plumbing fixtures. demo kitchen to studs: install new insualtion, electrical,plumbing fixtures,hook-up sink, cabinets, wallboard, counters, floor finishes | $40,000 |
| Feb 9, 2012 | Completed final sign-off Apr 2012 | 387 Melrose Av | kitchen remol - remove old cabinets, counter, appliance, and floor. install new cabinets, counter, floor, plumbing and electrical in kitchen. paint kitchen. new lighting to comply with cec 150 (k). no structural work.Details
kitchen remol - remove old cabinets, counter, appliance, and floor. install new cabinets, counter, floor, plumbing and electrical in kitchen. paint kitchen. new lighting to comply with cec 150 (k). no structural work. | $18,000 |
| Jul 9, 2009 | Completed final sign-off Nov 2009 | 17 Allston Wy | kitchen remodel. remove (e) kitchen. install new lighting & wiring in kitchen. alter plumbing for new appliances, install new wall cover, approx 200 sq. ft. of gyp bd. walls & ceiling, insulate, install new wood floor, new cabinets, new counter & paint walls. no structural work.Details
kitchen remodel. remove (e) kitchen. install new lighting & wiring in kitchen. alter plumbing for new appliances, install new wall cover, approx 200 sq. ft. of gyp bd. walls & ceiling, insulate, install new wood floor, new cabinets, new counter & paint walls. no structural work. | $37,365 |
| Feb 28, 2006 | Completed final sign-off Jan 2007 | 777 04th Av | add new toilet/sink room at foyer in former closet (closet enlarged) demo existing keichen & laundry room install new kitchen in former laundry room and ofifce/pantry area in old kitchen area. new cabinetry, new sheetrock appliances, new plumbing and electical new conter tops, new paint,Details
add new toilet/sink room at foyer in former closet (closet enlarged) demo existing keichen & laundry room install new kitchen in former laundry room and ofifce/pantry area in old kitchen area. new cabinetry, new sheetrock appliances, new plumbing and electical new conter tops, new paint, | $45,000 |
| Aug 13, 2002 | Completed final sign-off Nov 2002 | 281 Hazelwood Av | remodel extng kitchen. no change to floor plan.Details
remodel extng kitchen. no change to floor plan. | $22,000 |