Don Strauss Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Jun 2017
- Last 24 months
- 0 permits filed
19 permits since 2000: 18 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 3 days from filing to permit and 294 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2013 | Completed final sign-off Sep 2014 | 1479 34th Av | legalize existing master bedroom, bath, study at 1st fl level. expand and replace shower, install expaned study perimeter, build fire wall between garage and living space and other code compliance items, rated doors, electric upadte, plumbing, insulation; modification to rear deckDetails
legalize existing master bedroom, bath, study at 1st fl level. expand and replace shower, install expaned study perimeter, build fire wall between garage and living space and other code compliance items, rated doors, electric upadte, plumbing, insulation; modification to rear deck | $30,000 |
| Apr 12, 2011 | Completed final sign-off Feb 2012 | 276 Fowler Av | remodel existing room in garage: add new bath, new hallway to connect upstairs stair to bedroom & bath. new deck 24" above grade. new wall plugs/lighting, new insulation, new sheetrock, new floor & flooring, new exit to yard with landing.Details
remodel existing room in garage: add new bath, new hallway to connect upstairs stair to bedroom & bath. new deck 24" above grade. new wall plugs/lighting, new insulation, new sheetrock, new floor & flooring, new exit to yard with landing. | $50,000 |
| Aug 10, 2004 | Completed final sign-off Sep 2004 | 125 Romain St | remove (e)deck & tar+gravel roof (leaking).install new tar-gravel roof & replace deck in kind withDetails
remove (e)deck & tar+gravel roof (leaking).install new tar-gravel roof & replace deck in kind with | $11,000 |