Back to kitchen remodel contractors
D3 Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2005 to Sep 2026
- Last 24 months
- 64 permits filed
475 permits since 2000: 373 completed, 46 in progress, 20 never finaled, 36 expired or cancelled.
Of the 20 never-finaled permits, 6 are 3 to 5 years old, 10 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
166 kitchen remodel permits: 139 completed, 15 in progress, 3 never finaled, 9 expired or cancelled. Typically 0 days from filing to permit and 193 days from permit to final inspection.
Showing the 100 most recent of 166.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 115 Pierce St | remodel kitchen and laundry room, all work in kindDetails
remodel kitchen and laundry room, all work in kind | $30,000 |
| Aug 27, 2026 | In progress issued Sep 2026 | 37 Saturn St | interior renovation to include: (n) closet in bedroom 3. (n) laundry room, (n) kitchen appliances, (n) shower finish. replace rear door and window due to dryrot.Details
interior renovation to include: (n) closet in bedroom 3. (n) laundry room, (n) kitchen appliances, (n) shower finish. replace rear door and window due to dryrot. | $25,000 |
| May 6, 2026 | In progress issued May 2026 | 607 06th Av | remodel kitchen in kind 84 sf, no change to windows, doors or walls.Details
remodel kitchen in kind 84 sf, no change to windows, doors or walls. | $40,000 |
| Apr 15, 2026 | In progress issued May 2026 | 20 Blake St | 3rd floor (top floor) reconfiguration of kitchen & living room, reconfiguration of rear bedroom to master bedroom & adding new master bath (n) electrical and plumbing as required at rear of work only, adding new roof deck.Details
3rd floor (top floor) reconfiguration of kitchen & living room, reconfiguration of rear bedroom to master bedroom & adding new master bath (n) electrical and plumbing as required at rear of work only, adding new roof deck. | $80,000 |
| Apr 7, 2026 | In progress issued Apr 2026 | 230 Pierce St | remodel kitchen & 1 bathroom.Details
remodel kitchen & 1 bathroom. | $65,000 |
| Dec 1, 2025 | Completed final sign-off Apr 2026 | 976 Noe St | 1st fl: existing posts at garage to be removed. 3rd fl: existing portion of wall between kitchen and dining room to be removed.Details
1st fl: existing posts at garage to be removed. 3rd fl: existing portion of wall between kitchen and dining room to be removed. | $3,780 |
| Oct 16, 2025 | In progress issued Aug 2026 | 548 07th Av | 1/f: rear horizontal addition,convert (e) storage into full bath/bed; excavate 12in. 2/f: hztl addition:new family room, dining room, office; (e) kitchen remodel, new staircase.2/f: hztl add, new prime bed, 2 new baths, walk-in closet, new laundry & skylight.Details
1/f: rear horizontal addition,convert (e) storage into full bath/bed; excavate 12in. 2/f: hztl addition:new family room, dining room, office; (e) kitchen remodel, new staircase.2/f: hztl add, new prime bed, 2 new baths, walk-in closet, new laundry & skylight. | $250,000 |
| Sep 23, 2025 | Completed final sign-off Sep 2026 | 254 08th Av | kitchen & bathroom remodel in kind - replace kitchen cabinets, bathtub & vanity in 254 and 256. replace vanity faucet, kitchen faucet and bathtub finished trim. replace (e) outlets with gfci outlets in kitchen & bathroom. maintain (e) fire rating & separation. no change to floor layout. no change toDetails
kitchen & bathroom remodel in kind - replace kitchen cabinets, bathtub & vanity in 254 and 256. replace vanity faucet, kitchen faucet and bathtub finished trim. replace (e) outlets with gfci outlets in kitchen & bathroom. maintain (e) fire rating & separation. no change to floor layout. no change to | $60,000 |
| Sep 22, 2025 | Completed final sign-off Sep 2026 | 150 Lombard St | unit #503: kitchen remodel, no change to windows, walls, and door opening.Details
unit #503: kitchen remodel, no change to windows, walls, and door opening. | $30,000 |
| Aug 19, 2025 | In progress issued Feb 2026 | 267 28th Av | basement: rear horizontal addition of family room, bathroom and storage; 1/f: horizontal addition includes new family room, new kitchen; 2/f: horizontal addition includes new 2 bedrooms, new 2 walk-in-closets, remodel primary closet.Details
basement: rear horizontal addition of family room, bathroom and storage; 1/f: horizontal addition includes new family room, new kitchen; 2/f: horizontal addition includes new 2 bedrooms, new 2 walk-in-closets, remodel primary closet. | $350,000 |
| Aug 18, 2025 | Completed final sign-off Sep 2026 | 152 Fairmount St | kitchen remodel reivsed layout no change to plumbing fixture countDetails
kitchen remodel reivsed layout no change to plumbing fixture count | $65,000 |
| Jun 3, 2025 | In progress issued Oct 2025 | 978 Noe St | comply with complaint #202537453. first floor: new office, new bathroom, and new family room, renovate (e) bathroom. 2/f: remove portion of (e) wall between kitchen and dining room. remove (e) wall at staircare and add (n) 42" guardrail replacement of non conforming fence under sep permit.Details
comply with complaint #202537453. first floor: new office, new bathroom, and new family room, renovate (e) bathroom. 2/f: remove portion of (e) wall between kitchen and dining room. remove (e) wall at staircare and add (n) 42" guardrail replacement of non conforming fence under sep permit. | $8,500 |
| May 1, 2025 | Completed final sign-off Feb 2026 | 58 Valley St | remodel kitchen.in-kindDetails
remodel kitchen.in-kind | $37,000 |
| Apr 30, 2025 | Completed final sign-off Nov 2025 | 978 Noe St | remodel kitchen, bathroom and powder room in kind. no change to windows, walls or door opening.Details
remodel kitchen, bathroom and powder room in kind. no change to windows, walls or door opening. | $75,000 |
| Apr 18, 2025 | In progress issued Aug 2025 | 20 Blake St | 2/f: reconfiguration of kitchen, bathroom and 2 bedrooms to include master bedroom and add new master bath. replace rear window, exterior door, and rear deck. replace windows in kind as neededDetails
2/f: reconfiguration of kitchen, bathroom and 2 bedrooms to include master bedroom and add new master bath. replace rear window, exterior door, and rear deck. replace windows in kind as needed | |
| Apr 3, 2025 | Completed final sign-off Jan 2026 | 976 Noe St | remodel 1 kitchen & 1 bathroom and 1 powder room in-kind. no change to windows, walls & door openings.Details
remodel 1 kitchen & 1 bathroom and 1 powder room in-kind. no change to windows, walls & door openings. | $75,000 |
| Jan 21, 2025 | In progress issued Jan 2025 | 764 24th Av | remove wall bewtween kitchen and dining room on 2nd fl. remodel powder room on 2nd fl.Details
remove wall bewtween kitchen and dining room on 2nd fl. remodel powder room on 2nd fl. | $50,000 |
| Dec 26, 2024 | Completed final sign-off Nov 2025 | 115 Topaz Wy | kitchen remodel: relocate non structural wall relocate fridge, sink, range, installed recessed downlights no added fixtures bathroom: relocation on main fl. relocate (e) full bath to (e) storage room space on same fl. no added fixtures no structural work.Details
kitchen remodel: relocate non structural wall relocate fridge, sink, range, installed recessed downlights no added fixtures bathroom: relocation on main fl. relocate (e) full bath to (e) storage room space on same fl. no added fixtures no structural work. | $32,000 |
| Oct 29, 2024 | In progress issued Oct 2024 | 20 Blake St | 2 kitchens & 2 bathrooms at 20 & 22 blake st, no change to windows, walls, & door openingsDetails
2 kitchens & 2 bathrooms at 20 & 22 blake st, no change to windows, walls, & door openings | $100,000 |
| Aug 6, 2024 | Completed final sign-off Oct 2024 | 857 Page St | 1 kitchen & 1 bathroom remodel on 2nd floor. no change to walls, windows or doorsDetails
1 kitchen & 1 bathroom remodel on 2nd floor. no change to walls, windows or doors | $50,000 |
| Jul 30, 2024 | Completed final sign-off Aug 2024 | 855 Page St | repaint kitchen cabinet doors/drawers. replace countertop. no change to plumbing and electrical. replace kitchen faucet and electrical outlet.Details
repaint kitchen cabinet doors/drawers. replace countertop. no change to plumbing and electrical. replace kitchen faucet and electrical outlet. | $5,000 |
| Jul 2, 2024 | Completed final sign-off Jun 2025 | 4846 17th St | renovation and reconfiguration of the existing kitchen at the 2nd floor, the removal of wall between kitchen and dining area and the replacement and reconfiguration of existing doors at the existing 2nd floor rear roof deck.Details
renovation and reconfiguration of the existing kitchen at the 2nd floor, the removal of wall between kitchen and dining area and the replacement and reconfiguration of existing doors at the existing 2nd floor rear roof deck. | $75,000 |
| Jun 28, 2024 | In progress issued Jun 2024 | 41 Clairview Ct | remodel kitchen and 2 baths in kindDetails
remodel kitchen and 2 baths in kind | $35,000 |
| Jun 7, 2024 | Completed final sign-off Jul 2025 | 260 Montana St | add ext door to backyard to garage. add 2 (n) skylights. replace 5 windows and door (street facing). replace existing bathroom fixtures & add tub to fl 1 bathroom, reconfiguration for the upstairs bedrooms. relocate interior staircase. relocate washer & dryer. renovate (e) kitchenDetails
add ext door to backyard to garage. add 2 (n) skylights. replace 5 windows and door (street facing). replace existing bathroom fixtures & add tub to fl 1 bathroom, reconfiguration for the upstairs bedrooms. relocate interior staircase. relocate washer & dryer. renovate (e) kitchen | $420,000 |
| Apr 24, 2024 | In progress issued Jun 2024 | 2486 22nd Av | renovate and reconfigure of kitchen and bedrm areas; remodel (e) bathroom & add additional bath and new door to rear yard at the 2nd fl; new interior stair case between levels. legalize two full baths at first flr. replace 13 windows in kindDetails
renovate and reconfigure of kitchen and bedrm areas; remodel (e) bathroom & add additional bath and new door to rear yard at the 2nd fl; new interior stair case between levels. legalize two full baths at first flr. replace 13 windows in kind | $250,000 |
| Feb 20, 2024 | Completed final sign-off Dec 2024 | 212 Douglass St | remove existing bathroom. new bathroom and walk in closet in bedroom. kitchen remodel and new rear sliding door. new pocket door on 1/f.Details
remove existing bathroom. new bathroom and walk in closet in bedroom. kitchen remodel and new rear sliding door. new pocket door on 1/f. | $110,000 |
| Feb 12, 2024 | Completed final sign-off May 2024 | 4629 18th St | kitchen remodel: no change to windows, walls, and door opening.Details
kitchen remodel: no change to windows, walls, and door opening. | $25,000 |
| Jan 17, 2024 | Completed final sign-off Mar 2026 | 3941 23rd St | remodel e residence. relocate e bath at 2nd fl,remodel kitchen. gr fl conversion of non habitable space to add 2 bedrooms and bath. convert gfl window to door retain (e) adj. window.Details
remodel e residence. relocate e bath at 2nd fl,remodel kitchen. gr fl conversion of non habitable space to add 2 bedrooms and bath. convert gfl window to door retain (e) adj. window. | $100,000 |
| Nov 6, 2023 | Completed final sign-off Jul 2024 | 1422 33rd Av | kitchen remodel, remove existing abandoned flue at kitchen, add 2 new skylights, not visible from the street. add parapet wall where shown on plans.Details
kitchen remodel, remove existing abandoned flue at kitchen, add 2 new skylights, not visible from the street. add parapet wall where shown on plans. | $15,000 |
| Oct 12, 2023 | Completed final sign-off Apr 2024 | 1824 Jackson St | unit #e: primary bathroom remodel. bathroom 2 remodel add bidet. kitchen and bathroom remodel. add half bathroom.Details
unit #e: primary bathroom remodel. bathroom 2 remodel add bidet. kitchen and bathroom remodel. add half bathroom. | $20,000 |
| Oct 6, 2023 | Completed final sign-off Feb 2024 | 745 27th Av | second floor: (2) new skylights at kitchen area.Details
second floor: (2) new skylights at kitchen area. | $8,000 |
| Oct 2, 2023 | Completed final sign-off Jan 2024 | 720 Balboa St | kitchen, bathroom, and half bath remodel. no change to walls, windows, and door openings. all in kind.Details
kitchen, bathroom, and half bath remodel. no change to walls, windows, and door openings. all in kind. | $50,000 |
| Aug 22, 2023 | Completed final sign-off Jul 2026 | 3878 21st St | 2nd fl. kitchen remodel, 2 new bathrooms 3rd fl. kitchen remodel, 2 new bathroomsDetails
2nd fl. kitchen remodel, 2 new bathrooms 3rd fl. kitchen remodel, 2 new bathrooms | $150,000 |
| May 5, 2023 | Completed final sign-off Dec 2023 | 2127 43rd Av | remodel kitchen & bathroom. no change to iwndows, doors & walls.Details
remodel kitchen & bathroom. no change to iwndows, doors & walls. | $40,000 |
| Apr 7, 2023 | In progress issued Oct 2025 | 81 Bradford St | new vertical & horizontal addition on south side of existing structure with new kitchen on main floor and new bath on lower floor; new powder room & prime bath in existing structure; new deck at main floor new addition; new patio at lower floor addition; new exterior stairs connecting both levels ofDetails
new vertical & horizontal addition on south side of existing structure with new kitchen on main floor and new bath on lower floor; new powder room & prime bath in existing structure; new deck at main floor new addition; new patio at lower floor addition; new exterior stairs connecting both levels of | $350,000 |
| Oct 28, 2022 | Completed final sign-off Dec 2023 | 453 Guerrero St | reconfigure/remodel (e) bathroom, add new bathroom, kitchen remodel, remove wall between kitchen/dining rooms.Details
reconfigure/remodel (e) bathroom, add new bathroom, kitchen remodel, remove wall between kitchen/dining rooms. | $15,000 |
| Sep 29, 2022 | Completed final sign-off Jul 2023 | 154 Lombard St | remodel kitchen and guest bathroom. replace vanity in powder room and master bathroo. new flooring.Details
remodel kitchen and guest bathroom. replace vanity in powder room and master bathroo. new flooring. | $38,000 |
| Sep 22, 2022 | Completed final sign-off Jun 2023 | 501 47th Av | 1/f: remodel (e) bathroom , relocate (e) water heater/furnace in garage closets, remove nonbearing walls btwn bedroom 4 & 5, infill door of bedroom 4; 2/f: remodel (e) kitchen/breakfast room, (e) bathrooms; 3/f: remodel (e) primary bathDetails
1/f: remodel (e) bathroom , relocate (e) water heater/furnace in garage closets, remove nonbearing walls btwn bedroom 4 & 5, infill door of bedroom 4; 2/f: remodel (e) kitchen/breakfast room, (e) bathrooms; 3/f: remodel (e) primary bath | $100,000 |
| Sep 21, 2022 | Completed final sign-off Oct 2023 | 236 Claremont Bl | 2nd fl: existing wall to be removed between kitchen and dining room. 1st fl: e partitoin wall between shower and vanity at bath to removedDetails
2nd fl: existing wall to be removed between kitchen and dining room. 1st fl: e partitoin wall between shower and vanity at bath to removed | $15,000 |
| Sep 15, 2022 | Completed final sign-off Jul 2023 | 150 Lombard St | kitchen, master and guest bathroom remodel: powder room remodel: no change to windows, walls, and door opening.Details
kitchen, master and guest bathroom remodel: powder room remodel: no change to windows, walls, and door opening. | $60,000 |
| Jul 26, 2022 | Never finaled issued Aug 2022, no final | 40 Encanto Av | revision to pa# 202109168552: interior remodel on 2 floors to (e) single family dwelling. remodel kitchen, bathrooms, and bedrooms. renovate front and rear facades.Details
revision to pa# 202109168552: interior remodel on 2 floors to (e) single family dwelling. remodel kitchen, bathrooms, and bedrooms. renovate front and rear facades. | $173,780 |
| Apr 27, 2022 | Completed final sign-off Mar 2023 | 2859 Sacramento St | kitchen remodel. 2 extg hallway bathrooms remodel. 2 new bathroom.Details
kitchen remodel. 2 extg hallway bathrooms remodel. 2 new bathroom. | $100,000 |
| Apr 14, 2022 | In progress issued Jan 2024 | 725 Darien Wy | project consists of new state accessory dwelling unit, including remodel of existing 1st floor kitchen, family room, bath and office, plus creation of two new bedrooms and new bathroom, in conjunction with remodeling of main house (under separate permit no.202204142257).see dwg. "permit note"Details
project consists of new state accessory dwelling unit, including remodel of existing 1st floor kitchen, family room, bath and office, plus creation of two new bedrooms and new bathroom, in conjunction with remodeling of main house (under separate permit no.202204142257).see dwg. "permit note" | $60,000 |
| Dec 22, 2021 | Completed final sign-off Jan 2025 | 1960 Baker St | basement floor: add (3)(n) bedrooms & (1) full bathroom. 1st fl: remove walls between kitchen, dining room & living room, kitchen & bathroom remodel. 2nd fl: (e) bathroom remodel & (n) full bathroom.Details
basement floor: add (3)(n) bedrooms & (1) full bathroom. 1st fl: remove walls between kitchen, dining room & living room, kitchen & bathroom remodel. 2nd fl: (e) bathroom remodel & (n) full bathroom. | $50,000 |
| Dec 1, 2021 | Completed final sign-off May 2022 | 684 Clarendon Av | remodel kitchen and bathroom: no change to windows, walls and doors. remodel in kind- comply w/ sec 150.0(k)3 and 150.0 (k)5Details
remodel kitchen and bathroom: no change to windows, walls and doors. remodel in kind- comply w/ sec 150.0(k)3 and 150.0 (k)5 | $50,000 |
| Nov 22, 2021 | Completed final sign-off Jun 2022 | 2634 Octavia St | kitchen and bath remodel. no change to windows, walls, and doors.Details
kitchen and bath remodel. no change to windows, walls, and doors. | $50,000 |
| Nov 2, 2021 | Completed final sign-off Aug 2023 | 50 Whitney St | remodel one kitchen and one bathroom on 2nd floor . no change to windows, walls and doors.Details
remodel one kitchen and one bathroom on 2nd floor . no change to windows, walls and doors. | $50,000 |
| Sep 7, 2021 | Completed final sign-off Dec 2021 | 262 Frederick St | #1: remodel kitchen. no change to windows, walls, doors. lights per cec 150.0(k).Details
#1: remodel kitchen. no change to windows, walls, doors. lights per cec 150.0(k). | $25,000 |
| May 28, 2021 | Completed final sign-off Aug 2024 | 1960 Baker St | remodel 1 kitchen & 2 bathrooms. no new wlall & no (e) wall relocation. all plumbing fixtures remain at same location. new lighting shall comply with cec 150.0k3 & k5.Details
remodel 1 kitchen & 2 bathrooms. no new wlall & no (e) wall relocation. all plumbing fixtures remain at same location. new lighting shall comply with cec 150.0k3 & k5. | $4,000 |
| Mar 22, 2021 | Completed final sign-off Jul 2022 | 451 Guerrero St | interior remodel of extg kitchen, bath, and half bath, new en-suite bath, remove wall between kitchen and dining room, new electrical, new beam at garage to remove extg posts.Details
interior remodel of extg kitchen, bath, and half bath, new en-suite bath, remove wall between kitchen and dining room, new electrical, new beam at garage to remove extg posts. | $75,000 |
| Mar 16, 2021 | Completed final sign-off Apr 2022 | 145 Mountain Spring Av | kitchen remodel: no structural work, no wall modificationDetails
kitchen remodel: no structural work, no wall modification | $25,000 |
| Mar 16, 2021 | Completed final sign-off Jun 2021 | 2583 47th Av | kitchen remodel: no structural work/wall modificationDetails
kitchen remodel: no structural work/wall modification | $25,000 |
| Mar 2, 2021 | Completed final sign-off Aug 2021 | 150 Lombard St | unit 47 kitchen remodelDetails
unit 47 kitchen remodel | $25,000 |
| Jan 15, 2021 | Completed final sign-off Apr 2021 | 22 Bernice St | bathroom remodel, replace exterior siding at rear, new lighting in kitchen,living room and bedroom, deck repair rear (less than 50% repair)Details
bathroom remodel, replace exterior siding at rear, new lighting in kitchen,living room and bedroom, deck repair rear (less than 50% repair) | $25,000 |
| Oct 27, 2020 | Completed final sign-off Apr 2022 | 4431 20th St | unit #4431 2nd flr & unit #4433 3rd flr: kitchen remodel, exisitng fire place to be removed, remodel bathroom.Details
unit #4431 2nd flr & unit #4433 3rd flr: kitchen remodel, exisitng fire place to be removed, remodel bathroom. | $125,000 |
| Oct 23, 2020 | Completed final sign-off Nov 2021 | 375 Hermann St | 2nd flr - remodel (e) kitchen & bathroom, add full bathroom and stackable washer/dryer. remove bearing wall between kitchen and dining room. replace window in-kind at bath 1 & 2, new recessed lighting in hallway, kitchen and bathroom, replace windows in kind at (e) dining room.Details
2nd flr - remodel (e) kitchen & bathroom, add full bathroom and stackable washer/dryer. remove bearing wall between kitchen and dining room. replace window in-kind at bath 1 & 2, new recessed lighting in hallway, kitchen and bathroom, replace windows in kind at (e) dining room. | $85,000 |
| Sep 2, 2020 | Completed final sign-off Jan 2023 | 455 Guerrero St | remodel existing kitchen, hall bath, half bath, new ensuite bath. 4/fDetails
remodel existing kitchen, hall bath, half bath, new ensuite bath. 4/f | $50,000 |
| Jul 13, 2020 | Completed final sign-off Jan 2021 | 1835 09th Av | remodel kitchen & two baths. install recessed can lighting. no change to walls, windows 7 doors. work on 2nd floor.Details
remodel kitchen & two baths. install recessed can lighting. no change to walls, windows 7 doors. work on 2nd floor. | $50,000 |
| Jul 13, 2020 | Completed final sign-off Jul 2022 | 170 Beverly St | remodel kitchen (~12'x10'), replace sink, dishwasher, range, hood. remodel bathroom (~5'x9'), replace toilet, tub and vanity., new recessed can lighting and new outlets, 9 lights in kitchen, and 2 in bathroom. no change to windows, walls and doors. all work in kind. (no change on existing floor planDetails
remodel kitchen (~12'x10'), replace sink, dishwasher, range, hood. remodel bathroom (~5'x9'), replace toilet, tub and vanity., new recessed can lighting and new outlets, 9 lights in kitchen, and 2 in bathroom. no change to windows, walls and doors. all work in kind. (no change on existing floor plan | $50,000 |
| Jul 13, 2020 | Expired or cancelled expired Nov 2022 | 801 38th Av | remodel kitchen and two bathrooms in kind. no change to windows, walls and doors.Details
remodel kitchen and two bathrooms in kind. no change to windows, walls and doors. | $50,000 |
| Jan 27, 2020 | Completed final sign-off May 2023 | 4431 20th St | legalization of udu per ord# 43-14. to comply w/ nov 201905747, interior remodel of space to include new living room. kitchen area, office area, bath, laudry closet, two bedrooms and closets.Details
legalization of udu per ord# 43-14. to comply w/ nov 201905747, interior remodel of space to include new living room. kitchen area, office area, bath, laudry closet, two bedrooms and closets. | $103,500 |
| Jan 21, 2020 | Completed final sign-off Jan 2021 | 2754 Baker St | new opening between kitchen and dining room, new bath and closets, new laundry closet, new recessed lightingDetails
new opening between kitchen and dining room, new bath and closets, new laundry closet, new recessed lighting | $150,000 |
| Dec 24, 2019 | Completed final sign-off Jul 2021 | 127 Beverly St | interior renovation w/fl 1 bathroom, kitchen sink & dishwasher location, replace (e) st windows, no change to opening. enlarge fl 1 rear windows, add hydronic. radiant fl heating w/combi. boiler & remove furnace & tank water heater. remove & replace (e) skylight. add gas line for future range.Details
interior renovation w/fl 1 bathroom, kitchen sink & dishwasher location, replace (e) st windows, no change to opening. enlarge fl 1 rear windows, add hydronic. radiant fl heating w/combi. boiler & remove furnace & tank water heater. remove & replace (e) skylight. add gas line for future range. | $290,000 |
| Nov 14, 2019 | Completed final sign-off Jan 2021 | 194 27th St | kitchen & bathroom remodel in both units. new bathroom addition in each unit. replace 2 existing windows at kitchens on 1st & 2nd fl, same widt, raise sill height. w/d addition on 2nd fl.Details
kitchen & bathroom remodel in both units. new bathroom addition in each unit. replace 2 existing windows at kitchens on 1st & 2nd fl, same widt, raise sill height. w/d addition on 2nd fl. | $60,000 |
| Oct 15, 2019 | Completed final sign-off Jul 2020 | 244 15th Av | 2/f: remodel of (e) kitchen, open non-structurual wall between (e) ktichen & (e) dining roo. new bathroom, new closet in (e) office.Details
2/f: remodel of (e) kitchen, open non-structurual wall between (e) ktichen & (e) dining roo. new bathroom, new closet in (e) office. | $45,000 |
| Apr 3, 2019 | Completed final sign-off Aug 2019 | 150 Graystone Tr | unit 3: kitchen and bath remodel. no change to windows, walls and doors.Details
unit 3: kitchen and bath remodel. no change to windows, walls and doors. | $20,000 |
| Jan 7, 2019 | Completed final sign-off Jul 2020 | 563 Lombard St | remodel kitchen & bathroom at 563 & 565. no change to windows, walls and doors.Details
remodel kitchen & bathroom at 563 & 565. no change to windows, walls and doors. | $50,000 |
| Aug 30, 2018 | Completed final sign-off Aug 2019 | 762 Fell St | 2nd floor - apt b: interior renovation to an existing 738sf apartment on 2nd fl of a 4-unit apt bldg. renovation includes demolition, a kitchen & baster bathroom renovation, creation of a new 1/2 bath & closet, new laundry hookup & hvac.Details
2nd floor - apt b: interior renovation to an existing 738sf apartment on 2nd fl of a 4-unit apt bldg. renovation includes demolition, a kitchen & baster bathroom renovation, creation of a new 1/2 bath & closet, new laundry hookup & hvac. | $45,000 |
| Jun 29, 2018 | Completed final sign-off Jun 2023 | 1300 Mariposa St | vertical addition. construct new 3/fl.relocate kitchen to 3/fl.add new mstr bath on 2/fl&pwdr rm on 3/fl. r/r (e)windows. restucco exterior.upgrade elec as eq. upgrade/reinforce structure as req.Details
vertical addition. construct new 3/fl.relocate kitchen to 3/fl.add new mstr bath on 2/fl&pwdr rm on 3/fl. r/r (e)windows. restucco exterior.upgrade elec as eq. upgrade/reinforce structure as req. | $350,000 |
| Jun 21, 2018 | Completed final sign-off Dec 2018 | 750 Van Ness Av | remove/replace (e) kitchen cabinets, counter top & sink. remove/replace (e) flooring. no change to walls, windows, doors or plumbing & electrical location. n/a for maher.Details
remove/replace (e) kitchen cabinets, counter top & sink. remove/replace (e) flooring. no change to walls, windows, doors or plumbing & electrical location. n/a for maher. | $8,000 |
| Mar 16, 2018 | Completed final sign-off Oct 2018 | 635 33rd Av | remodel (e) kitchen, bathrooms and add closet in bedroom to (e) unit on the 3rd flr and replacing (e) furnances for the 2nd & third floor unitsDetails
remodel (e) kitchen, bathrooms and add closet in bedroom to (e) unit on the 3rd flr and replacing (e) furnances for the 2nd & third floor units | $82,000 |
| Feb 21, 2018 | Completed final sign-off Sep 2018 | 1554 Shafter Av | remove extg load bearing wall between kitchen and living room. kitchen remodel. bathroom cosmetic remodel. (fixts remain) closet remodel.Details
remove extg load bearing wall between kitchen and living room. kitchen remodel. bathroom cosmetic remodel. (fixts remain) closet remodel. | $10,000 |
| Aug 18, 2017 | Completed final sign-off Nov 2019 | 2105 Ellis St | update floor plan & renovations: kitchen & bath remodel, add full bath, add laundry room. convert closet to den/office. rpelace plaster and lath with drywall. remodel hardwood flooring.Details
update floor plan & renovations: kitchen & bath remodel, add full bath, add laundry room. convert closet to den/office. rpelace plaster and lath with drywall. remodel hardwood flooring. | $75,000 |
| Jul 21, 2017 | Completed final sign-off Feb 2018 | 215 Corbett Av | remodel kitchen & bath in unit #3. no change to walls & doors. replace window in kitchen at rear. work in unit #3 only.Details
remodel kitchen & bath in unit #3. no change to walls & doors. replace window in kitchen at rear. work in unit #3 only. | $25,000 |
| Jun 13, 2017 | Completed final sign-off Sep 2017 | 1255 California St | apt 502: remodel kitchen. no change to windows, walls and doors.Details
apt 502: remodel kitchen. no change to windows, walls and doors. | $15,000 |
| Jun 7, 2017 | Completed final sign-off Feb 2018 | 134 Staples Av | remodel kitchen, relocate bedroom door, add wall at interior entry, add full bathroom, widen extg staircase, relocate washer and dryer, laundry sink and water heater.Details
remodel kitchen, relocate bedroom door, add wall at interior entry, add full bathroom, widen extg staircase, relocate washer and dryer, laundry sink and water heater. | $50,000 |
| Mar 31, 2017 | Completed final sign-off Jun 2019 | 750 Funston Av | 2nd floor - remove walls between exisitng dining, breakfast room & kitchen to create open living/dining/kitchen. remodel existing hall guest bath. 3rd floor - remodel existing master bedroom closet area & master bath.Details
2nd floor - remove walls between exisitng dining, breakfast room & kitchen to create open living/dining/kitchen. remodel existing hall guest bath. 3rd floor - remodel existing master bedroom closet area & master bath. | $50,000 |
| Feb 9, 2017 | Completed final sign-off Jun 2017 | 150 Graystone Tr | #4 - remdoel kitchen & bath; lighting to comply with cec 150(k). no change to windows, walls & doors.Details
#4 - remdoel kitchen & bath; lighting to comply with cec 150(k). no change to windows, walls & doors. | $18,000 |
| Jan 24, 2017 | Completed final sign-off Jul 2017 | 716 05th Av | remodel kitchen, no change to windows, walls & doors. lighting to comply with cec 150(k).Details
remodel kitchen, no change to windows, walls & doors. lighting to comply with cec 150(k). | $25,000 |
| Nov 9, 2016 | Completed final sign-off Dec 2017 | 3101 Castro St | #c- remove walls between (e) living, dining & bedroom to create open living/dining/kitchen & study room, remodel kitchen to become bedroom & closet, remodel (e) bath & hallway to become compartmentalized bath.Details
#c- remove walls between (e) living, dining & bedroom to create open living/dining/kitchen & study room, remodel kitchen to become bedroom & closet, remodel (e) bath & hallway to become compartmentalized bath. | $8,000 |
| Jul 15, 2016 | Expired or cancelled expired Oct 2018 | 517 Bartlett St | infill the area under the laundry room create new ceiling height 8'-0" tall, remodel with family room, remove walls between living room, dining room & remodle kitchen & bathroom @2nd & 3rd floor, new structural beam above ceiling to support 3rd floor. add new stair from ist & 2nd floor.Details
infill the area under the laundry room create new ceiling height 8'-0" tall, remodel with family room, remove walls between living room, dining room & remodle kitchen & bathroom @2nd & 3rd floor, new structural beam above ceiling to support 3rd floor. add new stair from ist & 2nd floor. | $10,000 |
| Apr 28, 2016 | Completed final sign-off Nov 2016 | 26 Massasoit St | remove walls between existing kitchen living & dining room. install new posts, beams & remodel kitchen.Details
remove walls between existing kitchen living & dining room. install new posts, beams & remodel kitchen. | $10,000 |
| Mar 30, 2016 | Completed final sign-off Sep 2017 | 1126 Harrison St | relocate kitchens to front of unit with open living area. remodel (e) bathrooms, add 2nd bathrm, convert laundry rm to study rm in unit 1128; add 2nd bathrm & living space on ground level for unit 1126; replace front facade with stucco, repair front steps, replace windows. drywallDetails
relocate kitchens to front of unit with open living area. remodel (e) bathrooms, add 2nd bathrm, convert laundry rm to study rm in unit 1128; add 2nd bathrm & living space on ground level for unit 1126; replace front facade with stucco, repair front steps, replace windows. drywall | $150,000 |
| Mar 11, 2016 | Completed final sign-off Dec 2016 | 227 Precita Av | at garage level, 1st floor: construct new walls for half toilet & laundry. infill space under (e) bedroom above for new home office,alter(e)stair location w/1-hr wall. at 3rd flr, reconfigure floor space, remodel/replace (e) kitchen and roofdeck over (e)2nd floor.Details
at garage level, 1st floor: construct new walls for half toilet & laundry. infill space under (e) bedroom above for new home office,alter(e)stair location w/1-hr wall. at 3rd flr, reconfigure floor space, remodel/replace (e) kitchen and roofdeck over (e)2nd floor. | $49,000 |
| Jan 20, 2016 | Completed final sign-off Aug 2016 | 5553 Diamond Heights Bl | remodel kitchen, master bath and powder room, lighting to comply with cec 150(k). no change to windows, walls and doors.Details
remodel kitchen, master bath and powder room, lighting to comply with cec 150(k). no change to windows, walls and doors. | $25,000 |
| May 6, 2015 | Completed final sign-off Jul 2015 | 716 05th Av | remodel kitchen & bathroom. no change to windows, walls & doors. lighting to comply w/ cec 150 (k). bath approx 5x8. kitchen approx 8'x8'. unit is located on ground fl.Details
remodel kitchen & bathroom. no change to windows, walls & doors. lighting to comply w/ cec 150 (k). bath approx 5x8. kitchen approx 8'x8'. unit is located on ground fl. | $27,740 |
| Apr 2, 2015 | Expired or cancelled expired Mar 2021 | 246 Chenery St | remodel (e) single family dwelling include excavation of crawlspace @ basement. remodel of kitchen, new bath. new 2nd floor addition with roof deck.Details
remodel (e) single family dwelling include excavation of crawlspace @ basement. remodel of kitchen, new bath. new 2nd floor addition with roof deck. | $375,000 |
| Mar 26, 2015 | Expired or cancelled cancelled May 2015 | 716 05th Av | remodel (2) bathrooms, kitchen, replace concrete at rear yard and paint facade and rear exterior of building. kitchen on ground floor. one bath on ground floor and one bath on 3rd floorDetails
remodel (2) bathrooms, kitchen, replace concrete at rear yard and paint facade and rear exterior of building. kitchen on ground floor. one bath on ground floor and one bath on 3rd floor | $27,000 |
| Jan 21, 2015 | Completed final sign-off Jun 2015 | 567 26th Av | unit 567: remodel kitchen & bathroom on 3rd floor. n/a maher ordinance. to comply with his nov 201310131 dated 7/12/2013, item #4.Details
unit 567: remodel kitchen & bathroom on 3rd floor. n/a maher ordinance. to comply with his nov 201310131 dated 7/12/2013, item #4. | $10,000 |
| Jan 15, 2015 | Completed final sign-off Jul 2015 | 11 Dolores St | unit #12 - remodel (e) kitchen & fixtures, add new closet & new laundry outlet. plumbing & electrical under separate permit. n/a maher ordinanceDetails
unit #12 - remodel (e) kitchen & fixtures, add new closet & new laundry outlet. plumbing & electrical under separate permit. n/a maher ordinance | $10,000 |
| Jan 15, 2015 | Completed final sign-off Jul 2015 | 11 Dolores St | unit #6 - remodel kitchen & fixtures, add new closet & new laundry outlet. plumbing & electrical under separate permit. n/a maher ordinanceDetails
unit #6 - remodel kitchen & fixtures, add new closet & new laundry outlet. plumbing & electrical under separate permit. n/a maher ordinance | $10,000 |
| Dec 19, 2014 | Completed final sign-off Apr 2015 | 14 Southwood Dr | remode kitchen in-kind.Details
remode kitchen in-kind. | $18,000 |
| Dec 4, 2014 | Completed final sign-off Nov 2019 | 964 Noe St | remodel g/fl: garage level; excavate partial crawl space to level w/(e) slab flr, separate utility area from garage parking w/fire partition & door. add full bath grnd flr, drywall repair, 1/f remove bearing wall bet kitchen & fam.rm, remodel kitchen & half bath,add interior stair.2f/l convertDetails
remodel g/fl: garage level; excavate partial crawl space to level w/(e) slab flr, separate utility area from garage parking w/fire partition & door. add full bath grnd flr, drywall repair, 1/f remove bearing wall bet kitchen & fam.rm, remodel kitchen & half bath,add interior stair.2f/l convert | $25,000 |
| Nov 20, 2014 | Completed final sign-off Nov 2015 | 232 Corbett Av | remodel existing residence. no expansion of the e bldg envelope. new windows, heating, water heater. new kitchen, powder rm and home office. new bath, laundry added on upper level and e bath remodeled. new deck over e roof a rear single store e portion of the house. garden to be leveled. skylightsDetails
remodel existing residence. no expansion of the e bldg envelope. new windows, heating, water heater. new kitchen, powder rm and home office. new bath, laundry added on upper level and e bath remodeled. new deck over e roof a rear single store e portion of the house. garden to be leveled. skylights | $200,000 |
| Sep 9, 2014 | Completed final sign-off Mar 2015 | 11 Dolores St | unit #11 (3rd flr): remodel kitchen & bathroom, remove wall between kitchen and hallway; maher n/aDetails
unit #11 (3rd flr): remodel kitchen & bathroom, remove wall between kitchen and hallway; maher n/a | $16,000 |
| Sep 5, 2014 | Completed final sign-off Feb 2015 | 920 Leavenworth St | remodel kitchen & bathroom. no change to window, walls & doors. lighting to comply w/cec 150(k). work in unit #405 only. replace exhaust fan in bathroom.Details
remodel kitchen & bathroom. no change to window, walls & doors. lighting to comply w/cec 150(k). work in unit #405 only. replace exhaust fan in bathroom. | $18,000 |
| Jul 31, 2014 | Completed final sign-off Jan 2016 | 439 Broderick St | remodel kitchen and bath. no change to windows, walls and doors. lighting to comply with cec 150(k).Details
remodel kitchen and bath. no change to windows, walls and doors. lighting to comply with cec 150(k). | $18,000 |
| Jul 14, 2014 | Completed final sign-off Dec 2014 | 11 Dolores St | #10- remodel kitchen and bathroom. remove wall between kitchen and living room. maher n/a. no windows, doors, wall under this scope, field verify sprinkler system coverage if applicable.Details
#10- remodel kitchen and bathroom. remove wall between kitchen and living room. maher n/a. no windows, doors, wall under this scope, field verify sprinkler system coverage if applicable. | $20,000 |
| Jul 2, 2014 | Completed final sign-off Oct 2014 | 920 Leavenworth St | unit 304: remodel kitchen & bathroom, no change to window walls & doors, lighting to comply w/cec 150(k).Details
unit 304: remodel kitchen & bathroom, no change to window walls & doors, lighting to comply w/cec 150(k). | $18,000 |
| May 30, 2014 | Completed final sign-off Sep 2014 | 1020 Post St | #502 - remodel kitchen & bathroom, no change to windows, walls & doors, lighting to comply w/cec 150 (k).Details
#502 - remodel kitchen & bathroom, no change to windows, walls & doors, lighting to comply w/cec 150 (k). | $18,000 |