Block 2719B, lot 007
150 Graystone Ter
- City’s use
- Multi-Family Residential
- Built
- 1951
- Stories
- 3
- Units
- 9
- Rooms
- 10 bathrooms
- Building
- 7,419 sq ft
- Lot
- 11,081 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 3, 2019 | Completed final sign-off Aug 2019 | 150 Graystone Tr | D3 Construction | unit 3: kitchen and bath remodel. no change to windows, walls and doors.Details
unit 3: kitchen and bath remodel. no change to windows, walls and doors. | $20,000 |
| Jul 23, 2018 | Completed final sign-off May 2019 | 150 Graystone Tr | D3 Construction | #5: new bathroom, (e) closet remodelDetails
#5: new bathroom, (e) closet remodel | $15,000 |
| Sep 8, 2017 | Completed final sign-off Oct 2019 | 150 Graystone Tr | D3 Construction | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $20,000 |
| Feb 9, 2017 | Completed final sign-off Jun 2017 | 150 Graystone Tr | D3 Construction | #4 - remdoel kitchen & bath; lighting to comply with cec 150(k). no change to windows, walls & doors.Details
#4 - remdoel kitchen & bath; lighting to comply with cec 150(k). no change to windows, walls & doors. | $18,000 |
| Sep 25, 2015 | Completed final sign-off Mar 2016 | 150 Graystone Tr | San Francisco Fire Protection | to comply with nov 201551923,item #8,like for like voluntary fire system replacement,replace (e) fire panel w/new ifp-50 control unit on upper flr,repl 1 heat det & 2 pull stations w/new.tie-in 9e)3 bells to new control unit.Details
to comply with nov 201551923,item #8,like for like voluntary fire system replacement,replace (e) fire panel w/new ifp-50 control unit on upper flr,repl 1 heat det & 2 pull stations w/new.tie-in 9e)3 bells to new control unit. | $1,500 |
| Jul 21, 2015 | Completed final sign-off Aug 2016 | 150 Graystone Tr | D3 Construction | replace dryout guardrail at side deck serving unit #6-9 per complaint #201551923, item #2. replacement of guardrail only. no deck. repair (e) rain scupper item #4 on complaint #201551923.Details
replace dryout guardrail at side deck serving unit #6-9 per complaint #201551923, item #2. replacement of guardrail only. no deck. repair (e) rain scupper item #4 on complaint #201551923. | $400 |
| Mar 29, 2012 | Completed final sign-off May 2012 | 150 Graystone Tr | D3 Construction | kitchen & bathroom remodel at unit #6: no change to window, walls and doors. a min. of 50% of total rated wattage of permanently installed lighting in kitchen shall be high efficacy. permanently installed lights in bathroom shall be high efficacy unless controlled by manual on occupancy sensor.Details
kitchen & bathroom remodel at unit #6: no change to window, walls and doors. a min. of 50% of total rated wattage of permanently installed lighting in kitchen shall be high efficacy. permanently installed lights in bathroom shall be high efficacy unless controlled by manual on occupancy sensor. | $18,000 |
| Sep 23, 2008 | Completed final sign-off Nov 2008 | 150 Graystone Tr | work @ unit# 7 only. retile bathroom wall above & around bathtub. replace kitchen caibnets work in unit# 7. non structural.existing kitchen / bathroom lighting to remain. no new walls. no wall removal. same size & location.Details
work @ unit# 7 only. retile bathroom wall above & around bathtub. replace kitchen caibnets work in unit# 7. non structural.existing kitchen / bathroom lighting to remain. no new walls. no wall removal. same size & location. | $17,000 | |
| Oct 2, 2007 | Completed final sign-off Oct 2007 | 150 Graystone Tr | unit #8 - replace kitchen cabinets, retile kitchen and bathroom floor. work in unit 8. no structural changes. min 50% of kitchen light watts must be flurescent. provide flourescent lights or occupancy sensor in bathroom.complaint#19921190, #199710553 & #199816999.Details
unit #8 - replace kitchen cabinets, retile kitchen and bathroom floor. work in unit 8. no structural changes. min 50% of kitchen light watts must be flurescent. provide flourescent lights or occupancy sensor in bathroom.complaint#19921190, #199710553 & #199816999. | $14,000 | |
| May 23, 2006 | Completed final sign-off Jul 2006 | 150 Graystone Tr | replace kitchen cabinets and retile kitchen in unit#1 only.Details
replace kitchen cabinets and retile kitchen in unit#1 only. | $3,500 | |
| May 19, 2006 | Never finaled issued May 2006, no final | 150 Graystone Tr | retile bathroom floor and wall around bathtub in (e) bathroom (work to be performed in unit #1)Details
retile bathroom floor and wall around bathtub in (e) bathroom (work to be performed in unit #1) | $900 | |
| Nov 23, 2005 | Completed final sign-off Jan 2006 | 150 Graystone Tr | retile bathroom floor and bathroom wall around tub. no plumbing or electrical being removed.Details
retile bathroom floor and bathroom wall around tub. no plumbing or electrical being removed. | $600 | |
| Nov 24, 2003 | Never finaled issued Nov 2003, no final | 150 Graystone Tr | Excelsior Roofing Company | reroofingDetails
reroofing | $7,500 |
| Oct 21, 2002 | Completed final sign-off Jan 2003 | 150 Graystone Tr | to clear nov#200234068. obtain bldg permit for new sheet metal duct (flue) of dryer funning across tDetails
to clear nov#200234068. obtain bldg permit for new sheet metal duct (flue) of dryer funning across t | $150 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D3 Construction (6), Excelsior Roofing Company, San Francisco Fire Protection
- Engineers
- Bernard Huang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.