D3 Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2005 to Sep 2026
- Last 24 months
- 64 permits filed
475 permits since 2000: 373 completed, 46 in progress, 20 never finaled, 36 expired or cancelled.
Of the 20 never-finaled permits, 6 are 3 to 5 years old, 10 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
205 bathroom remodel permits: 170 completed, 17 in progress, 6 never finaled, 12 expired or cancelled. Typically 0 days from filing to permit and 210 days from permit to final inspection.
Showing the 100 most recent of 205.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 1127 Hampshire St | excavate existing 1st fl add 2 new bedrooms and 2 new baths, new stair to existing upper fl. new sitting room, new bake storage and mech room. 2nd fl add new deck,new stair down to rear yard.Details
excavate existing 1st fl add 2 new bedrooms and 2 new baths, new stair to existing upper fl. new sitting room, new bake storage and mech room. 2nd fl add new deck,new stair down to rear yard. | $450,000 |
| Apr 15, 2026 | In progress issued May 2026 | 20 Blake St | 3rd floor (top floor) reconfiguration of kitchen & living room, reconfiguration of rear bedroom to master bedroom & adding new master bath (n) electrical and plumbing as required at rear of work only, adding new roof deck.Details
3rd floor (top floor) reconfiguration of kitchen & living room, reconfiguration of rear bedroom to master bedroom & adding new master bath (n) electrical and plumbing as required at rear of work only, adding new roof deck. | $80,000 |
| Apr 7, 2026 | In progress issued Apr 2026 | 230 Pierce St | remodel kitchen & 1 bathroom.Details
remodel kitchen & 1 bathroom. | $65,000 |
| Mar 17, 2026 | In progress issued Mar 2026 | 168 09th Av | replace vanity in bathroom in kind. new recess lighting in family room. no change to floor layout. no change to wall layout. no structural work.Details
replace vanity in bathroom in kind. new recess lighting in family room. no change to floor layout. no change to wall layout. no structural work. | $10,000 |
| Mar 12, 2026 | In progress issued Mar 2026 | 4370 Cesar Chavez St | remodel 2 bathrooms in kind. remove and replace stucco fron facade. street visible.Details
remodel 2 bathrooms in kind. remove and replace stucco fron facade. street visible. | $50,000 |
| Feb 24, 2026 | Completed final sign-off May 2026 | 36 Panorama Dr | 1st/f convert e) garage space into a new full bathroom, 2nd/f: e) bathroom to be remodeledDetails
1st/f convert e) garage space into a new full bathroom, 2nd/f: e) bathroom to be remodeled | $35,000 |
| Oct 16, 2025 | Completed final sign-off Jul 2026 | 3878 21st St | reconfigure 3rd fl. bathroom wall to relocate vanity reinstate permit # 2023-0872-4905Details
reconfigure 3rd fl. bathroom wall to relocate vanity reinstate permit # 2023-0872-4905 | $2,000 |
| Oct 16, 2025 | In progress issued Aug 2026 | 548 07th Av | 1/f: rear horizontal addition,convert (e) storage into full bath/bed; excavate 12in. 2/f: hztl addition:new family room, dining room, office; (e) kitchen remodel, new staircase.2/f: hztl add, new prime bed, 2 new baths, walk-in closet, new laundry & skylight.Details
1/f: rear horizontal addition,convert (e) storage into full bath/bed; excavate 12in. 2/f: hztl addition:new family room, dining room, office; (e) kitchen remodel, new staircase.2/f: hztl add, new prime bed, 2 new baths, walk-in closet, new laundry & skylight. | $250,000 |
| Sep 23, 2025 | Completed final sign-off Sep 2026 | 254 08th Av | kitchen & bathroom remodel in kind - replace kitchen cabinets, bathtub & vanity in 254 and 256. replace vanity faucet, kitchen faucet and bathtub finished trim. replace (e) outlets with gfci outlets in kitchen & bathroom. maintain (e) fire rating & separation. no change to floor layout. no change toDetails
kitchen & bathroom remodel in kind - replace kitchen cabinets, bathtub & vanity in 254 and 256. replace vanity faucet, kitchen faucet and bathtub finished trim. replace (e) outlets with gfci outlets in kitchen & bathroom. maintain (e) fire rating & separation. no change to floor layout. no change to | $60,000 |
| Aug 19, 2025 | In progress issued Feb 2026 | 267 28th Av | basement: rear horizontal addition of family room, bathroom and storage; 1/f: horizontal addition includes new family room, new kitchen; 2/f: horizontal addition includes new 2 bedrooms, new 2 walk-in-closets, remodel primary closet.Details
basement: rear horizontal addition of family room, bathroom and storage; 1/f: horizontal addition includes new family room, new kitchen; 2/f: horizontal addition includes new 2 bedrooms, new 2 walk-in-closets, remodel primary closet. | $350,000 |
| Jul 3, 2025 | Completed final sign-off Feb 2026 | 3977 19th St | remodel master bathroom, guest bathroom, and powder room. no change to windows, walls or openings.Details
remodel master bathroom, guest bathroom, and powder room. no change to windows, walls or openings. | $65,000 |
| Jun 3, 2025 | In progress issued Oct 2025 | 978 Noe St | comply with complaint #202537453. first floor: new office, new bathroom, and new family room, renovate (e) bathroom. 2/f: remove portion of (e) wall between kitchen and dining room. remove (e) wall at staircare and add (n) 42" guardrail replacement of non conforming fence under sep permit.Details
comply with complaint #202537453. first floor: new office, new bathroom, and new family room, renovate (e) bathroom. 2/f: remove portion of (e) wall between kitchen and dining room. remove (e) wall at staircare and add (n) 42" guardrail replacement of non conforming fence under sep permit. | $8,500 |
| Apr 30, 2025 | Completed final sign-off Nov 2025 | 978 Noe St | remodel kitchen, bathroom and powder room in kind. no change to windows, walls or door opening.Details
remodel kitchen, bathroom and powder room in kind. no change to windows, walls or door opening. | $75,000 |
| Apr 18, 2025 | In progress issued Aug 2025 | 20 Blake St | 2/f: reconfiguration of kitchen, bathroom and 2 bedrooms to include master bedroom and add new master bath. replace rear window, exterior door, and rear deck. replace windows in kind as neededDetails
2/f: reconfiguration of kitchen, bathroom and 2 bedrooms to include master bedroom and add new master bath. replace rear window, exterior door, and rear deck. replace windows in kind as needed | |
| Apr 3, 2025 | Completed final sign-off Jan 2026 | 976 Noe St | remodel 1 kitchen & 1 bathroom and 1 powder room in-kind. no change to windows, walls & door openings.Details
remodel 1 kitchen & 1 bathroom and 1 powder room in-kind. no change to windows, walls & door openings. | $75,000 |
| Mar 20, 2025 | Completed final sign-off May 2026 | 41 Clairview Ct | upper fl - add half bath; reconstruct (e) stairs; lower fl - add studio, primary bed and primary bath, laundryDetails
upper fl - add half bath; reconstruct (e) stairs; lower fl - add studio, primary bed and primary bath, laundry | $100,000 |
| Mar 10, 2025 | In progress issued Mar 2025 | 3878 21st St | relocation bathroom to laundry room. ref#: 201704043134Details
relocation bathroom to laundry room. ref#: 201704043134 | $1,000 |
| Feb 14, 2025 | Completed final sign-off Dec 2025 | 2988 Washington St | remodel ktichen and bathroom in kindDetails
remodel ktichen and bathroom in kind | $60,000 |
| Dec 26, 2024 | Completed final sign-off Nov 2025 | 115 Topaz Wy | kitchen remodel: relocate non structural wall relocate fridge, sink, range, installed recessed downlights no added fixtures bathroom: relocation on main fl. relocate (e) full bath to (e) storage room space on same fl. no added fixtures no structural work.Details
kitchen remodel: relocate non structural wall relocate fridge, sink, range, installed recessed downlights no added fixtures bathroom: relocation on main fl. relocate (e) full bath to (e) storage room space on same fl. no added fixtures no structural work. | $32,000 |
| Nov 12, 2024 | Completed final sign-off Mar 2025 | 20 Natick St | remodel bathroom. no change to windows, walls or door openings.Details
remodel bathroom. no change to windows, walls or door openings. | $25,000 |
| Oct 29, 2024 | In progress issued Oct 2024 | 20 Blake St | 2 kitchens & 2 bathrooms at 20 & 22 blake st, no change to windows, walls, & door openingsDetails
2 kitchens & 2 bathrooms at 20 & 22 blake st, no change to windows, walls, & door openings | $100,000 |
| Sep 12, 2024 | Completed final sign-off Sep 2025 | 169 Precita Av | bathroom remodel at ground floor. no change to windows, walls and doors. in kind remodel of bathroomDetails
bathroom remodel at ground floor. no change to windows, walls and doors. in kind remodel of bathroom | $25,000 |
| Aug 6, 2024 | Completed final sign-off Oct 2024 | 857 Page St | 1 kitchen & 1 bathroom remodel on 2nd floor. no change to walls, windows or doorsDetails
1 kitchen & 1 bathroom remodel on 2nd floor. no change to walls, windows or doors | $50,000 |
| Jun 28, 2024 | In progress issued Jun 2024 | 41 Clairview Ct | remodel kitchen and 2 baths in kindDetails
remodel kitchen and 2 baths in kind | $35,000 |
| Jun 7, 2024 | Completed final sign-off Jul 2025 | 260 Montana St | add ext door to backyard to garage. add 2 (n) skylights. replace 5 windows and door (street facing). replace existing bathroom fixtures & add tub to fl 1 bathroom, reconfiguration for the upstairs bedrooms. relocate interior staircase. relocate washer & dryer. renovate (e) kitchenDetails
add ext door to backyard to garage. add 2 (n) skylights. replace 5 windows and door (street facing). replace existing bathroom fixtures & add tub to fl 1 bathroom, reconfiguration for the upstairs bedrooms. relocate interior staircase. relocate washer & dryer. renovate (e) kitchen | $420,000 |
| May 31, 2024 | Expired or cancelled expired Oct 2025 | 1925 Fillmore St | unit #a: 2/f - new bathroom on second floor at existing closet.Details
unit #a: 2/f - new bathroom on second floor at existing closet. | $10,000 |
| May 29, 2024 | Completed final sign-off Aug 2024 | 855 Page St | remodel 1 bathroom. no change to windows, wall & doors.Details
remodel 1 bathroom. no change to windows, wall & doors. | $20,000 |
| Apr 24, 2024 | In progress issued Jun 2024 | 2486 22nd Av | renovate and reconfigure of kitchen and bedrm areas; remodel (e) bathroom & add additional bath and new door to rear yard at the 2nd fl; new interior stair case between levels. legalize two full baths at first flr. replace 13 windows in kindDetails
renovate and reconfigure of kitchen and bedrm areas; remodel (e) bathroom & add additional bath and new door to rear yard at the 2nd fl; new interior stair case between levels. legalize two full baths at first flr. replace 13 windows in kind | $250,000 |
| Feb 23, 2024 | Completed final sign-off Sep 2025 | 169 Precita Av | ground fl remodel. convert e library into family room w e full bath and utility sink, office to bedroom, add closet, convert partial laundry into sitting room/laundry.Details
ground fl remodel. convert e library into family room w e full bath and utility sink, office to bedroom, add closet, convert partial laundry into sitting room/laundry. | $45,000 |
| Feb 20, 2024 | Completed final sign-off Dec 2024 | 212 Douglass St | remove existing bathroom. new bathroom and walk in closet in bedroom. kitchen remodel and new rear sliding door. new pocket door on 1/f.Details
remove existing bathroom. new bathroom and walk in closet in bedroom. kitchen remodel and new rear sliding door. new pocket door on 1/f. | $110,000 |
| Jan 17, 2024 | Completed final sign-off Mar 2026 | 3941 23rd St | remodel e residence. relocate e bath at 2nd fl,remodel kitchen. gr fl conversion of non habitable space to add 2 bedrooms and bath. convert gfl window to door retain (e) adj. window.Details
remodel e residence. relocate e bath at 2nd fl,remodel kitchen. gr fl conversion of non habitable space to add 2 bedrooms and bath. convert gfl window to door retain (e) adj. window. | $100,000 |
| Jan 12, 2024 | Completed final sign-off Feb 2024 | 70 Blake St | remodel bathroom. no change to walls, windows, or door opening.Details
remodel bathroom. no change to walls, windows, or door opening. | $15,000 |
| Nov 16, 2023 | Completed final sign-off Mar 2025 | 447 38th Av | first floor: new bedroom, new closet, new bathroom, new storage area, new laundry, new garage area. new rear deck under separte permit pa 202401123867Details
first floor: new bedroom, new closet, new bathroom, new storage area, new laundry, new garage area. new rear deck under separte permit pa 202401123867 | $20,000 |
| Nov 15, 2023 | Completed final sign-off Feb 2025 | 658 Duncan St | 1st fl: new family room, new workshop, new full bathroom, new laundry room. no sleepining on 1st floor.Details
1st fl: new family room, new workshop, new full bathroom, new laundry room. no sleepining on 1st floor. | $20,000 |
| Oct 30, 2023 | In progress issued May 2024 | 1109 Leavenworth St | rear building: to comply with planning enf cas 2023-005273 enf. 1st fl - legalize existing 3 bedrooms, 2 full bathrooms and spiral staircase. infill garage openingDetails
rear building: to comply with planning enf cas 2023-005273 enf. 1st fl - legalize existing 3 bedrooms, 2 full bathrooms and spiral staircase. infill garage opening | $25,000 |
| Oct 12, 2023 | Completed final sign-off Apr 2024 | 1824 Jackson St | unit #e: primary bathroom remodel. bathroom 2 remodel add bidet. kitchen and bathroom remodel. add half bathroom.Details
unit #e: primary bathroom remodel. bathroom 2 remodel add bidet. kitchen and bathroom remodel. add half bathroom. | $20,000 |
| Oct 2, 2023 | Completed final sign-off Jan 2024 | 720 Balboa St | kitchen, bathroom, and half bath remodel. no change to walls, windows, and door openings. all in kind.Details
kitchen, bathroom, and half bath remodel. no change to walls, windows, and door openings. all in kind. | $50,000 |
| Sep 14, 2023 | Completed final sign-off Apr 2024 | 1824 Jackson St | unit # e: remodel two bathrooms. no change to windows, doors, and walls.Details
unit # e: remodel two bathrooms. no change to windows, doors, and walls. | $30,000 |
| Aug 22, 2023 | Completed final sign-off Jul 2026 | 3878 21st St | 2nd fl. kitchen remodel, 2 new bathrooms 3rd fl. kitchen remodel, 2 new bathroomsDetails
2nd fl. kitchen remodel, 2 new bathrooms 3rd fl. kitchen remodel, 2 new bathrooms | $150,000 |
| Aug 1, 2023 | Completed final sign-off Jan 2024 | 1200 Gough St | bathroom remodel. no change to windows, walls, and doors.Details
bathroom remodel. no change to windows, walls, and doors. | $15,000 |
| Jul 17, 2023 | Completed final sign-off Aug 2023 | 1715 Webster St | unit 302: to comply with nov# 202310013. work includes: paint unit, replace damaged bathroom tile, fix leaky g=faucet in bathroom sink and tub faucet.Details
unit 302: to comply with nov# 202310013. work includes: paint unit, replace damaged bathroom tile, fix leaky g=faucet in bathroom sink and tub faucet. | $5,000 |
| May 5, 2023 | Completed final sign-off Dec 2023 | 2127 43rd Av | remodel kitchen & bathroom. no change to iwndows, doors & walls.Details
remodel kitchen & bathroom. no change to iwndows, doors & walls. | $40,000 |
| Apr 7, 2023 | In progress issued Oct 2025 | 81 Bradford St | new vertical & horizontal addition on south side of existing structure with new kitchen on main floor and new bath on lower floor; new powder room & prime bath in existing structure; new deck at main floor new addition; new patio at lower floor addition; new exterior stairs connecting both levels ofDetails
new vertical & horizontal addition on south side of existing structure with new kitchen on main floor and new bath on lower floor; new powder room & prime bath in existing structure; new deck at main floor new addition; new patio at lower floor addition; new exterior stairs connecting both levels of | $350,000 |
| Oct 28, 2022 | Completed final sign-off Dec 2023 | 453 Guerrero St | reconfigure/remodel (e) bathroom, add new bathroom, kitchen remodel, remove wall between kitchen/dining rooms.Details
reconfigure/remodel (e) bathroom, add new bathroom, kitchen remodel, remove wall between kitchen/dining rooms. | $15,000 |
| Oct 21, 2022 | Completed final sign-off Jul 2023 | 150 Lombard St | unit 45 - enlarge dining on 1st fl; bathroom remodel @ 2nd floorDetails
unit 45 - enlarge dining on 1st fl; bathroom remodel @ 2nd floor | $5,000 |
| Sep 29, 2022 | Completed final sign-off Jul 2023 | 154 Lombard St | remodel kitchen and guest bathroom. replace vanity in powder room and master bathroo. new flooring.Details
remodel kitchen and guest bathroom. replace vanity in powder room and master bathroo. new flooring. | $38,000 |
| Sep 22, 2022 | Completed final sign-off Jun 2023 | 501 47th Av | 1/f: remodel (e) bathroom , relocate (e) water heater/furnace in garage closets, remove nonbearing walls btwn bedroom 4 & 5, infill door of bedroom 4; 2/f: remodel (e) kitchen/breakfast room, (e) bathrooms; 3/f: remodel (e) primary bathDetails
1/f: remodel (e) bathroom , relocate (e) water heater/furnace in garage closets, remove nonbearing walls btwn bedroom 4 & 5, infill door of bedroom 4; 2/f: remodel (e) kitchen/breakfast room, (e) bathrooms; 3/f: remodel (e) primary bath | $100,000 |
| Sep 21, 2022 | Completed final sign-off Oct 2023 | 236 Claremont Bl | 2nd fl: existing wall to be removed between kitchen and dining room. 1st fl: e partitoin wall between shower and vanity at bath to removedDetails
2nd fl: existing wall to be removed between kitchen and dining room. 1st fl: e partitoin wall between shower and vanity at bath to removed | $15,000 |
| Sep 16, 2022 | Completed final sign-off Nov 2022 | 686 23rd Av | remodel two bathrooms on 1st and 2nd floor. no change to windows, walls, and doors.Details
remodel two bathrooms on 1st and 2nd floor. no change to windows, walls, and doors. | $30,000 |
| Sep 15, 2022 | Completed final sign-off Jul 2023 | 150 Lombard St | kitchen, master and guest bathroom remodel: powder room remodel: no change to windows, walls, and door opening.Details
kitchen, master and guest bathroom remodel: powder room remodel: no change to windows, walls, and door opening. | $60,000 |
| Jul 26, 2022 | Never finaled issued Aug 2022, no final | 40 Encanto Av | revision to pa# 202109168552: interior remodel on 2 floors to (e) single family dwelling. remodel kitchen, bathrooms, and bedrooms. renovate front and rear facades.Details
revision to pa# 202109168552: interior remodel on 2 floors to (e) single family dwelling. remodel kitchen, bathrooms, and bedrooms. renovate front and rear facades. | $173,780 |
| Jun 24, 2022 | Completed final sign-off Feb 2023 | 140 Graystone Tr | unit #2: add new bedroom and bathroom at existing storage room.Details
unit #2: add new bedroom and bathroom at existing storage room. | $7,000 |
| Jun 14, 2022 | Completed final sign-off Aug 2022 | 686 23rd Av | remodel 1 bathroom. no change to walls, windows, or doors.Details
remodel 1 bathroom. no change to walls, windows, or doors. | $15,000 |
| May 24, 2022 | Never finaled issued Sep 2022, no final | 119 Banks St | excavate (less than 50 cubic yard) existing basement to creat conditioned living space. 3 bedroom and 2 bathrooms, new interior stairs connecting new conditioned space. new window, doors and opening at basement. new foundation and reconfigure main floor living and bedroom area.Details
excavate (less than 50 cubic yard) existing basement to creat conditioned living space. 3 bedroom and 2 bathrooms, new interior stairs connecting new conditioned space. new window, doors and opening at basement. new foundation and reconfigure main floor living and bedroom area. | $100,000 |
| Apr 27, 2022 | Completed final sign-off Mar 2023 | 2859 Sacramento St | kitchen remodel. 2 extg hallway bathrooms remodel. 2 new bathroom.Details
kitchen remodel. 2 extg hallway bathrooms remodel. 2 new bathroom. | $100,000 |
| Apr 14, 2022 | In progress issued Jan 2024 | 725 Darien Wy | project consists of new state accessory dwelling unit, including remodel of existing 1st floor kitchen, family room, bath and office, plus creation of two new bedrooms and new bathroom, in conjunction with remodeling of main house (under separate permit no.202204142257).see dwg. "permit note"Details
project consists of new state accessory dwelling unit, including remodel of existing 1st floor kitchen, family room, bath and office, plus creation of two new bedrooms and new bathroom, in conjunction with remodeling of main house (under separate permit no.202204142257).see dwg. "permit note" | $60,000 |
| Apr 14, 2022 | In progress issued Jan 2024 | 725 Darien Wy | project consists remodeling of main house including relocation of interior stair, remodeling of garage & laundry, new hydronic heating system for entire house, remodeling of (e) bathroom & closets on 2/f, repair 'in kind' of (e) exterior front stairs & (e) front window at 2/f & new paving & plantingDetails
project consists remodeling of main house including relocation of interior stair, remodeling of garage & laundry, new hydronic heating system for entire house, remodeling of (e) bathroom & closets on 2/f, repair 'in kind' of (e) exterior front stairs & (e) front window at 2/f & new paving & planting | $100,000 |
| Mar 10, 2022 | Completed final sign-off May 2022 | 6115 California St | remodel 2/f bathroom in-kind. no walls modified or layout changes.Details
remodel 2/f bathroom in-kind. no walls modified or layout changes. | $15,000 |
| Dec 22, 2021 | Completed final sign-off Jan 2025 | 1960 Baker St | basement floor: add (3)(n) bedrooms & (1) full bathroom. 1st fl: remove walls between kitchen, dining room & living room, kitchen & bathroom remodel. 2nd fl: (e) bathroom remodel & (n) full bathroom.Details
basement floor: add (3)(n) bedrooms & (1) full bathroom. 1st fl: remove walls between kitchen, dining room & living room, kitchen & bathroom remodel. 2nd fl: (e) bathroom remodel & (n) full bathroom. | $50,000 |
| Dec 1, 2021 | Completed final sign-off May 2022 | 684 Clarendon Av | remodel kitchen and bathroom: no change to windows, walls and doors. remodel in kind- comply w/ sec 150.0(k)3 and 150.0 (k)5Details
remodel kitchen and bathroom: no change to windows, walls and doors. remodel in kind- comply w/ sec 150.0(k)3 and 150.0 (k)5 | $50,000 |
| Nov 22, 2021 | Completed final sign-off Jun 2022 | 2634 Octavia St | kitchen and bath remodel. no change to windows, walls, and doors.Details
kitchen and bath remodel. no change to windows, walls, and doors. | $50,000 |
| Nov 2, 2021 | Completed final sign-off Aug 2023 | 50 Whitney St | remodel one kitchen and one bathroom on 2nd floor . no change to windows, walls and doors.Details
remodel one kitchen and one bathroom on 2nd floor . no change to windows, walls and doors. | $50,000 |
| Jun 14, 2021 | Completed final sign-off Aug 2023 | 50 Whitney St | add 1/2 bathroom and closet at 2nd fl. excavation of appromixatel 21 cu yds. voluntary foundation upgrade at rear crawl space.Details
add 1/2 bathroom and closet at 2nd fl. excavation of appromixatel 21 cu yds. voluntary foundation upgrade at rear crawl space. | $30,000 |
| May 28, 2021 | Completed final sign-off Aug 2024 | 1960 Baker St | remodel 1 kitchen & 2 bathrooms. no new wlall & no (e) wall relocation. all plumbing fixtures remain at same location. new lighting shall comply with cec 150.0k3 & k5.Details
remodel 1 kitchen & 2 bathrooms. no new wlall & no (e) wall relocation. all plumbing fixtures remain at same location. new lighting shall comply with cec 150.0k3 & k5. | $4,000 |
| May 6, 2021 | Completed final sign-off Dec 2021 | 430 Fillmore St | unit b: remodel guest bathroom, laundry room and master bathroomDetails
unit b: remodel guest bathroom, laundry room and master bathroom | $35,000 |
| Apr 20, 2021 | Never finaled issued Jun 2021, no final | 4846 17th St | new primary bath at extg 3rd floor primary suite, and remove extg bath at 2nd floor, add new door openings to rear roof deck at 2nd floor.Details
new primary bath at extg 3rd floor primary suite, and remove extg bath at 2nd floor, add new door openings to rear roof deck at 2nd floor. | $30,000 |
| Mar 31, 2021 | Completed final sign-off Aug 2021 | 61 Saturn St | remodel bathroom - no change to windows,walls,doors.Details
remodel bathroom - no change to windows,walls,doors. | $15,000 |
| Mar 22, 2021 | Completed final sign-off Jul 2022 | 451 Guerrero St | interior remodel of extg kitchen, bath, and half bath, new en-suite bath, remove wall between kitchen and dining room, new electrical, new beam at garage to remove extg posts.Details
interior remodel of extg kitchen, bath, and half bath, new en-suite bath, remove wall between kitchen and dining room, new electrical, new beam at garage to remove extg posts. | $75,000 |
| Mar 18, 2021 | Never finaled issued May 2021, no final | 61 Saturn St | convert extg family room to new hallway, bedroom and closet. convert extg half bathroom to full bath with shower, in kind remodel of extg 1st floor bath.Details
convert extg family room to new hallway, bedroom and closet. convert extg half bathroom to full bath with shower, in kind remodel of extg 1st floor bath. | $30,000 |
| Mar 3, 2021 | Completed final sign-off Jun 2023 | 8325 Geary Bl | interior remodel: (e) garage project includes new foundation rear of bldg, new laundry, 2 new bedrooms and bathrooms, new family room. 2/f work includes new master suite and remodel bedroom, new stair included in scope. no change to (e) bldg height or (e) bldg envelope.Details
interior remodel: (e) garage project includes new foundation rear of bldg, new laundry, 2 new bedrooms and bathrooms, new family room. 2/f work includes new master suite and remodel bedroom, new stair included in scope. no change to (e) bldg height or (e) bldg envelope. | $200,000 |
| Jan 15, 2021 | Completed final sign-off Apr 2021 | 22 Bernice St | bathroom remodel, replace exterior siding at rear, new lighting in kitchen,living room and bedroom, deck repair rear (less than 50% repair)Details
bathroom remodel, replace exterior siding at rear, new lighting in kitchen,living room and bedroom, deck repair rear (less than 50% repair) | $25,000 |
| Nov 3, 2020 | Completed final sign-off Apr 2022 | 145 Mountain Spring Av | 3rd flr-reconfig master bath & hall closet to incl a tub, shower & exterior window by tub. add sun-tube/small skylt over tub/shower, bring back roof deck. roof frame replacement in-kind over kitch & din rm. 2nd flr-replace rear windows & drs in bedrm 2,3 & office. nook in bath 2&3.Details
3rd flr-reconfig master bath & hall closet to incl a tub, shower & exterior window by tub. add sun-tube/small skylt over tub/shower, bring back roof deck. roof frame replacement in-kind over kitch & din rm. 2nd flr-replace rear windows & drs in bedrm 2,3 & office. nook in bath 2&3. | $50,000 |
| Oct 27, 2020 | Completed final sign-off Apr 2022 | 4431 20th St | unit #4431 2nd flr & unit #4433 3rd flr: kitchen remodel, exisitng fire place to be removed, remodel bathroom.Details
unit #4431 2nd flr & unit #4433 3rd flr: kitchen remodel, exisitng fire place to be removed, remodel bathroom. | $125,000 |
| Oct 23, 2020 | Completed final sign-off Nov 2021 | 375 Hermann St | 2nd flr - remodel (e) kitchen & bathroom, add full bathroom and stackable washer/dryer. remove bearing wall between kitchen and dining room. replace window in-kind at bath 1 & 2, new recessed lighting in hallway, kitchen and bathroom, replace windows in kind at (e) dining room.Details
2nd flr - remodel (e) kitchen & bathroom, add full bathroom and stackable washer/dryer. remove bearing wall between kitchen and dining room. replace window in-kind at bath 1 & 2, new recessed lighting in hallway, kitchen and bathroom, replace windows in kind at (e) dining room. | $85,000 |
| Sep 2, 2020 | Completed final sign-off Jan 2023 | 455 Guerrero St | remodel existing kitchen, hall bath, half bath, new ensuite bath. 4/fDetails
remodel existing kitchen, hall bath, half bath, new ensuite bath. 4/f | $50,000 |
| Jul 13, 2020 | Expired or cancelled expired Nov 2022 | 801 38th Av | remodel kitchen and two bathrooms in kind. no change to windows, walls and doors.Details
remodel kitchen and two bathrooms in kind. no change to windows, walls and doors. | $50,000 |
| Jul 13, 2020 | Completed final sign-off Jul 2022 | 170 Beverly St | remodel kitchen (~12'x10'), replace sink, dishwasher, range, hood. remodel bathroom (~5'x9'), replace toilet, tub and vanity., new recessed can lighting and new outlets, 9 lights in kitchen, and 2 in bathroom. no change to windows, walls and doors. all work in kind. (no change on existing floor planDetails
remodel kitchen (~12'x10'), replace sink, dishwasher, range, hood. remodel bathroom (~5'x9'), replace toilet, tub and vanity., new recessed can lighting and new outlets, 9 lights in kitchen, and 2 in bathroom. no change to windows, walls and doors. all work in kind. (no change on existing floor plan | $50,000 |
| Jul 13, 2020 | Completed final sign-off Jan 2021 | 1835 09th Av | remodel kitchen & two baths. install recessed can lighting. no change to walls, windows 7 doors. work on 2nd floor.Details
remodel kitchen & two baths. install recessed can lighting. no change to walls, windows 7 doors. work on 2nd floor. | $50,000 |
| Jun 8, 2020 | Completed final sign-off Sep 2020 | 244 15th Av | bathroom remodel: remove and replace toilet, bathtub and vanity. all work in kind, same size and same location.Details
bathroom remodel: remove and replace toilet, bathtub and vanity. all work in kind, same size and same location. | $15,000 |
| Jan 27, 2020 | Completed final sign-off May 2023 | 4431 20th St | legalization of udu per ord# 43-14. to comply w/ nov 201905747, interior remodel of space to include new living room. kitchen area, office area, bath, laudry closet, two bedrooms and closets.Details
legalization of udu per ord# 43-14. to comply w/ nov 201905747, interior remodel of space to include new living room. kitchen area, office area, bath, laudry closet, two bedrooms and closets. | $103,500 |
| Jan 21, 2020 | Completed final sign-off Jan 2021 | 2754 Baker St | new opening between kitchen and dining room, new bath and closets, new laundry closet, new recessed lightingDetails
new opening between kitchen and dining room, new bath and closets, new laundry closet, new recessed lighting | $150,000 |
| Dec 24, 2019 | Completed final sign-off Jul 2021 | 127 Beverly St | interior renovation w/fl 1 bathroom, kitchen sink & dishwasher location, replace (e) st windows, no change to opening. enlarge fl 1 rear windows, add hydronic. radiant fl heating w/combi. boiler & remove furnace & tank water heater. remove & replace (e) skylight. add gas line for future range.Details
interior renovation w/fl 1 bathroom, kitchen sink & dishwasher location, replace (e) st windows, no change to opening. enlarge fl 1 rear windows, add hydronic. radiant fl heating w/combi. boiler & remove furnace & tank water heater. remove & replace (e) skylight. add gas line for future range. | $290,000 |
| Nov 14, 2019 | Completed final sign-off Jan 2021 | 194 27th St | kitchen & bathroom remodel in both units. new bathroom addition in each unit. replace 2 existing windows at kitchens on 1st & 2nd fl, same widt, raise sill height. w/d addition on 2nd fl.Details
kitchen & bathroom remodel in both units. new bathroom addition in each unit. replace 2 existing windows at kitchens on 1st & 2nd fl, same widt, raise sill height. w/d addition on 2nd fl. | $60,000 |
| Oct 15, 2019 | Completed final sign-off Jul 2020 | 244 15th Av | 2/f: remodel of (e) kitchen, open non-structurual wall between (e) ktichen & (e) dining roo. new bathroom, new closet in (e) office.Details
2/f: remodel of (e) kitchen, open non-structurual wall between (e) ktichen & (e) dining roo. new bathroom, new closet in (e) office. | $45,000 |
| Sep 4, 2019 | Completed final sign-off Feb 2021 | 154 Lombard St | unit 49: amend to 201905130420: remodel ktichen, master bathroom, guest bathroom and powder room.Details
unit 49: amend to 201905130420: remodel ktichen, master bathroom, guest bathroom and powder room. | $60,000 |
| May 15, 2019 | Completed final sign-off Dec 2020 | 459 Crestmont Dr | add one new unit to portion of the 2nd flr. renovate basement, first and second flrs to include reconfiguration of 1st flr bath. comply with planning enforcement 2018089068enfDetails
add one new unit to portion of the 2nd flr. renovate basement, first and second flrs to include reconfiguration of 1st flr bath. comply with planning enforcement 2018089068enf | $65,000 |
| Apr 26, 2019 | Completed final sign-off Aug 2020 | 563 Lombard St | convert existing pantries to bagthroom on 2nd and 3rd floor. convert existing sunroom to bathroom on 4th floor.Details
convert existing pantries to bagthroom on 2nd and 3rd floor. convert existing sunroom to bathroom on 4th floor. | $45,000 |
| Apr 3, 2019 | Completed final sign-off Aug 2019 | 150 Graystone Tr | unit 3: kitchen and bath remodel. no change to windows, walls and doors.Details
unit 3: kitchen and bath remodel. no change to windows, walls and doors. | $20,000 |
| Mar 22, 2019 | Completed final sign-off Sep 2020 | 178 Holladay Av | new bedroom at ground floor, new laundry room at ground floor, new interior stair from 1st flr to ground fl, remove wall between living and dining rooms, new gas fire place, remodel 1st floor bath, remodel 2nd floor master bath.Details
new bedroom at ground floor, new laundry room at ground floor, new interior stair from 1st flr to ground fl, remove wall between living and dining rooms, new gas fire place, remodel 1st floor bath, remodel 2nd floor master bath. | $190,670 |
| Feb 25, 2019 | Completed final sign-off Aug 2019 | 1837 09th Av | remodel kithen & (2) bathrooms on 3/f. no change to windows, walls & doorsDetails
remodel kithen & (2) bathrooms on 3/f. no change to windows, walls & doors | $35,000 |
| Feb 25, 2019 | Completed final sign-off Apr 2019 | 149 Eastwood Dr | remodel bathroom & laundry room at upper level. no change to windows, walls & doors.Details
remodel bathroom & laundry room at upper level. no change to windows, walls & doors. | $15,000 |
| Jan 7, 2019 | Completed final sign-off Jul 2020 | 563 Lombard St | remodel kitchen & bathroom at 563 & 565. no change to windows, walls and doors.Details
remodel kitchen & bathroom at 563 & 565. no change to windows, walls and doors. | $50,000 |
| Aug 30, 2018 | Completed final sign-off Aug 2019 | 762 Fell St | 2nd floor - apt b: interior renovation to an existing 738sf apartment on 2nd fl of a 4-unit apt bldg. renovation includes demolition, a kitchen & baster bathroom renovation, creation of a new 1/2 bath & closet, new laundry hookup & hvac.Details
2nd floor - apt b: interior renovation to an existing 738sf apartment on 2nd fl of a 4-unit apt bldg. renovation includes demolition, a kitchen & baster bathroom renovation, creation of a new 1/2 bath & closet, new laundry hookup & hvac. | $45,000 |
| Jul 23, 2018 | Completed final sign-off May 2019 | 150 Graystone Tr | #5: new bathroom, (e) closet remodelDetails
#5: new bathroom, (e) closet remodel | $15,000 |
| Jul 12, 2018 | Completed final sign-off Oct 2018 | 599 Belvedere St | remodel (2) exist bath rms.reconfigure exist. closets to create new bedroom, replace exist double hung window w/casement to provide eero, new closet at rear bedroom, no load bearning structural changesDetails
remodel (2) exist bath rms.reconfigure exist. closets to create new bedroom, replace exist double hung window w/casement to provide eero, new closet at rear bedroom, no load bearning structural changes | $50,000 |
| Jun 29, 2018 | Completed final sign-off Jun 2023 | 1300 Mariposa St | vertical addition. construct new 3/fl.relocate kitchen to 3/fl.add new mstr bath on 2/fl&pwdr rm on 3/fl. r/r (e)windows. restucco exterior.upgrade elec as eq. upgrade/reinforce structure as req.Details
vertical addition. construct new 3/fl.relocate kitchen to 3/fl.add new mstr bath on 2/fl&pwdr rm on 3/fl. r/r (e)windows. restucco exterior.upgrade elec as eq. upgrade/reinforce structure as req. | $350,000 |
| Mar 27, 2018 | Expired or cancelled expired Dec 2024 | 2845 San Bruno Av | add 1 accessory dwelling units per ord #162-16 at existing garage & storage areas. convert exist full bath to half bath. structural deferred under separate permit: no cfc for adu.Details
add 1 accessory dwelling units per ord #162-16 at existing garage & storage areas. convert exist full bath to half bath. structural deferred under separate permit: no cfc for adu. | $175,000 |
| Mar 16, 2018 | Completed final sign-off Oct 2018 | 635 33rd Av | remodel (e) kitchen, bathrooms and add closet in bedroom to (e) unit on the 3rd flr and replacing (e) furnances for the 2nd & third floor unitsDetails
remodel (e) kitchen, bathrooms and add closet in bedroom to (e) unit on the 3rd flr and replacing (e) furnances for the 2nd & third floor units | $82,000 |
| Feb 21, 2018 | Completed final sign-off Sep 2018 | 1554 Shafter Av | remove extg load bearing wall between kitchen and living room. kitchen remodel. bathroom cosmetic remodel. (fixts remain) closet remodel.Details
remove extg load bearing wall between kitchen and living room. kitchen remodel. bathroom cosmetic remodel. (fixts remain) closet remodel. | $10,000 |
| Feb 7, 2018 | Completed final sign-off Apr 2019 | 26 Genebern Wy | convert (e) storage and garage space to habitable area - 2 new bedrooms, 1 full bathroom, new utility room, new media room, seismic upgrade lower level only, excavate to lower portion of floor slab.Details
convert (e) storage and garage space to habitable area - 2 new bedrooms, 1 full bathroom, new utility room, new media room, seismic upgrade lower level only, excavate to lower portion of floor slab. | $50,000 |