D S Management Inc Dba Metrocon Builders
- Based in
- San Francisco
- On San Francisco permits
- Mar 2009 to Sep 2026
- Last 24 months
- 4 permits filed
105 permits since 2000: 81 completed, 4 in progress, 18 never finaled, 2 expired or cancelled.
Of the 18 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
62 bathroom remodel permits: 48 completed, 2 in progress, 11 never finaled, 1 expired or cancelled. Typically 25 days from filing to permit and 201 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2025 | In progress issued Nov 2025 | 355 Mullen Av | interior remodel of 1st and 2nd floor. reconfigure interior walls and layout . add full bathroom relocate laundry add (n) gas fau, electrical main panel upgrade, lighting, repalce windows visible from street.Details
interior remodel of 1st and 2nd floor. reconfigure interior walls and layout . add full bathroom relocate laundry add (n) gas fau, electrical main panel upgrade, lighting, repalce windows visible from street. | $425,000 |
| May 20, 2025 | In progress issued May 2025 | 371 16th Av | interior remodel of all 3 floors of a sfd, including remodel of 2nd floor kit., bath and laundry, new 3rd flr. bath and master bath. replace furnace w/ electric heat pump mini splits, tankless gas water heater, replace 2 3/f casement windows at rear, new skylight.Details
interior remodel of all 3 floors of a sfd, including remodel of 2nd floor kit., bath and laundry, new 3rd flr. bath and master bath. replace furnace w/ electric heat pump mini splits, tankless gas water heater, replace 2 3/f casement windows at rear, new skylight. | $50,000 |
| Jun 28, 2023 | Never finaled issued Sep 2023, no final | 1415 Lake St | basement: adding a bedroom and a full bathroom including a wet bar and a new window opening restore from its original location.Details
basement: adding a bedroom and a full bathroom including a wet bar and a new window opening restore from its original location. | $120,000 |
| Apr 25, 2022 | Completed final sign-off Apr 2022 | 1602 24th Av | remove/replace (e) two bathrooms tiles. painting two bathrooms.Details
remove/replace (e) two bathrooms tiles. painting two bathrooms. | $2,000 |
| Jul 16, 2019 | Completed final sign-off Oct 2021 | 206 Justin Dr | 2nd fl. create open fl. plan for living rm. dining rm. & kithcen, reconfigure & remodel kitchen & full bath, add master bath, ground fl. add family rm., (2) bedrooms, & 2) full baths, replace all windows to double paneDetails
2nd fl. create open fl. plan for living rm. dining rm. & kithcen, reconfigure & remodel kitchen & full bath, add master bath, ground fl. add family rm., (2) bedrooms, & 2) full baths, replace all windows to double pane | $160,000 |
| Jun 18, 2019 | Completed final sign-off Jul 2020 | 821 Edinburgh St | construct 2 bedroom, 2 full bath, media rm gr fl. relocate e kitchen, bath, add 1 full bath, one 1/2 bath remodel, 2 bedrom,liv rm 2nd fl. rebuilt e interior staircase from 2nd fl down to gr fl. new deck at rear of build approx 14x6Details
construct 2 bedroom, 2 full bath, media rm gr fl. relocate e kitchen, bath, add 1 full bath, one 1/2 bath remodel, 2 bedrom,liv rm 2nd fl. rebuilt e interior staircase from 2nd fl down to gr fl. new deck at rear of build approx 14x6 | $120,000 |
| Jun 18, 2019 | Completed final sign-off Jun 2023 | 211 Miramar Av | 1)remodel extg kitchen, relocate extg bathrm, & construct 1 bed room, 1 full bathroom at ground flr. 2) relocate extg kitchen, bathroom, add 1 nw bath room, & convert extg kitchen space to bedroom at 2nd flr. 3)const. 2 bedroom, 2 full bath room at 3rd floor. 4)rebuilt interior staircase.Details
1)remodel extg kitchen, relocate extg bathrm, & construct 1 bed room, 1 full bathroom at ground flr. 2) relocate extg kitchen, bathroom, add 1 nw bath room, & convert extg kitchen space to bedroom at 2nd flr. 3)const. 2 bedroom, 2 full bath room at 3rd floor. 4)rebuilt interior staircase. | $180,000 |
| May 14, 2019 | Completed final sign-off Mar 2020 | 94 Ney St | 1)construct one bedroom, one full bath room, & family room at ground floor. 2)relocate extg kitchen bathrm, add one new bathrm, & convert extg kitchen space to bedrm at 2nd fl. 3)construct 1 bedrrm, 1 full bath at attic space. 4)re-built extg interior staircase. 5)construct 2 dormer(size 8'x8')Details
1)construct one bedroom, one full bath room, & family room at ground floor. 2)relocate extg kitchen bathrm, add one new bathrm, & convert extg kitchen space to bedrm at 2nd fl. 3)construct 1 bedrrm, 1 full bath at attic space. 4)re-built extg interior staircase. 5)construct 2 dormer(size 8'x8') | $150,000 |
| Dec 19, 2018 | Completed final sign-off May 2019 | 19 Robinson Dr | revision to pa 2018-1121-6547, add (n) bathroom at laundry room at garage levelDetails
revision to pa 2018-1121-6547, add (n) bathroom at laundry room at garage level | $7,500 |
| Dec 12, 2018 | Completed final sign-off Feb 2021 | 344 Chicago Wy | construct 2 bedroom, 2 full bathrooms, family room & play room @ ground floor; remodel (e) kitchen, bath room & add 1 new bathroom @ 2nd floor; re-built interior staircase from 2nd floor down to ground floorDetails
construct 2 bedroom, 2 full bathrooms, family room & play room @ ground floor; remodel (e) kitchen, bath room & add 1 new bathroom @ 2nd floor; re-built interior staircase from 2nd floor down to ground floor | $115,000 |
| Jun 26, 2018 | Completed final sign-off Feb 2020 | 72 San Benito Wy | basement: new game room and half bath. 1st flr - relocate kitchen, remodel bath, new laundry and wet bar. 2nd flr - remodel 2 baths and reconfigure stairs to attic. attic - remodel family room. all windows are to be of wood construction & w/ true divided lites.Details
basement: new game room and half bath. 1st flr - relocate kitchen, remodel bath, new laundry and wet bar. 2nd flr - remodel 2 baths and reconfigure stairs to attic. attic - remodel family room. all windows are to be of wood construction & w/ true divided lites. | $50,000 |
| Mar 28, 2018 | Completed final sign-off Mar 2019 | 3550 Market St | unit#203 remodel 2 extg bathrooms. no change to fixture layout. cosmeticDetails
unit#203 remodel 2 extg bathrooms. no change to fixture layout. cosmetic | $20,000 |
| Feb 22, 2018 | Completed final sign-off Aug 2018 | 146 Stratford Dr | 1) remodel extg kitchen, one bathroom, remove extg wall in dining room, convert extg living room into bed room, & construct one half bathroom at 2nd floor. 2) remodel one extg bath room at ground floor.Details
1) remodel extg kitchen, one bathroom, remove extg wall in dining room, convert extg living room into bed room, & construct one half bathroom at 2nd floor. 2) remodel one extg bath room at ground floor. | $55,000 |
| Oct 30, 2017 | Completed final sign-off May 2019 | 789 12th Av | to comply with nov #201701734. 2nd fl: reconfigure & remodel kitchen, remodel (2) bathrooms. ground fl: relocate & replace water heater & furnace. install lights, switches & outlets.Details
to comply with nov #201701734. 2nd fl: reconfigure & remodel kitchen, remodel (2) bathrooms. ground fl: relocate & replace water heater & furnace. install lights, switches & outlets. | $80,000 |
| Aug 18, 2017 | Completed final sign-off Mar 2018 | 206 San Juan Av | g/f: cvonstruct 2 bedrooms, (2) 1/2 bathrooms & family room. 2/f: relocate (e) kitchen, convert (e) kitchen space to new bedroom.Details
g/f: cvonstruct 2 bedrooms, (2) 1/2 bathrooms & family room. 2/f: relocate (e) kitchen, convert (e) kitchen space to new bedroom. | $56,000 |
| Aug 4, 2017 | Completed final sign-off Dec 2017 | 125 San Rafael Wy | relocate kitchen in dining room, enlarge (e) bedroom, construct one new bathroom & replace (e) sliding door to 2 windows. all work at 1/fDetails
relocate kitchen in dining room, enlarge (e) bedroom, construct one new bathroom & replace (e) sliding door to 2 windows. all work at 1/f | $35,000 |
| Jun 23, 2017 | Completed final sign-off Jan 2018 | 203 Wayland St | legalize (e) bedroom, 1 full bath, family room & laundry area at ground floorDetails
legalize (e) bedroom, 1 full bath, family room & laundry area at ground floor | $48,000 |
| Jun 9, 2017 | Completed final sign-off Jul 2018 | 1942 18th Av | relocate kitchen, convert (e) kitchen space to new bed room. add 1 full bathroom @ 2nd floor. construct 2 bedrooms, 1 full bath room & 1 storage room at ground floor & laundryDetails
relocate kitchen, convert (e) kitchen space to new bed room. add 1 full bathroom @ 2nd floor. construct 2 bedrooms, 1 full bath room & 1 storage room at ground floor & laundry | $68,000 |
| Jun 9, 2017 | Completed final sign-off Dec 2017 | 15 Navajo Av | construct 2 bedrooms, 2 full bathrooms, study room and laundry area at ground floor. relocate (e) kitchen, convert (e) kitchen space to new bedroom @ 2nd floorDetails
construct 2 bedrooms, 2 full bathrooms, study room and laundry area at ground floor. relocate (e) kitchen, convert (e) kitchen space to new bedroom @ 2nd floor | $68,000 |
| May 23, 2017 | Completed final sign-off May 2018 | 797 Victoria St | comply w/ complaint #201776386, unit legalization ord# 43-14, legalization of dwelling unit install without permit,. legalize (e) kitchen, bedrooms & two bathroom. all work at ground floor.Details
comply w/ complaint #201776386, unit legalization ord# 43-14, legalization of dwelling unit install without permit,. legalize (e) kitchen, bedrooms & two bathroom. all work at ground floor. | $92,000 |
| May 15, 2017 | Completed final sign-off Jul 2017 | 249 Edinburgh St | legalize 1 existing bedroom, 1 full bathroom, storage room and laundry room on the ground floor. all work at ground floor.Details
legalize 1 existing bedroom, 1 full bathroom, storage room and laundry room on the ground floor. all work at ground floor. | $42,000 |
| Jan 13, 2017 | Completed final sign-off Apr 2018 | 797 Athens St | remodel (e) kitchen , bathroom, add one new bathroom & convert one bedroom to two bedroom at 2nd floor. construct two bedroom, two half bathroom, study room & laundry area at ground floor. construct new deck w/staircase at rear of bldg (size approx 17'x 8').Details
remodel (e) kitchen , bathroom, add one new bathroom & convert one bedroom to two bedroom at 2nd floor. construct two bedroom, two half bathroom, study room & laundry area at ground floor. construct new deck w/staircase at rear of bldg (size approx 17'x 8'). | $72,000 |
| Nov 21, 2016 | Completed final sign-off Jun 2017 | 2518 Ortega St | remodel (e) bathroom at 3/f, remodel (e) kitchen, convert (e) bathroom to 2 bathroom at 2/f, construct 2 bedrooms, 1 full bathroom at g/f.Details
remodel (e) bathroom at 3/f, remodel (e) kitchen, convert (e) bathroom to 2 bathroom at 2/f, construct 2 bedrooms, 1 full bathroom at g/f. | $68,000 |
| Nov 21, 2016 | Completed final sign-off Jun 2017 | 1666 41st Av | remodel (e) kitchen, convert (e) bathroom to 2 bathroom at 2/f, construct 2 bedroom, 1 full bathroom at g/f. install new water heater & furnace.Details
remodel (e) kitchen, convert (e) bathroom to 2 bathroom at 2/f, construct 2 bedroom, 1 full bathroom at g/f. install new water heater & furnace. | $52,000 |
| Oct 28, 2016 | Completed final sign-off Feb 2018 | 1239 21st Av | revision to pa 2016-0330-3486 - relocate partition wall between garage & interior stair at ground floor. construct 6x4 island counter in kitchen at 2nd floor. add one new bathroom at 3rd floor; correct (e) condition for rear deck.Details
revision to pa 2016-0330-3486 - relocate partition wall between garage & interior stair at ground floor. construct 6x4 island counter in kitchen at 2nd floor. add one new bathroom at 3rd floor; correct (e) condition for rear deck. | $12,000 |
| Sep 13, 2016 | Completed final sign-off Dec 2016 | 6143 California St | construct one new full bath room at 3rd floor.Details
construct one new full bath room at 3rd floor. | $10,000 |
| Apr 11, 2016 | Completed final sign-off Nov 2016 | 3100 Rivera St | construct two bedrooms, two full bathrooms, family room and install new glass front door, all work at ground floor.Details
construct two bedrooms, two full bathrooms, family room and install new glass front door, all work at ground floor. | $48,000 |
| Mar 4, 2016 | Completed final sign-off Jun 2022 | 1831 31st Av | 2-stories rear horizontal addition. add (6) bedroom, (4) bath, (1) laundry rm, (2) living/common area. adu use of ordinance #95-17. 3rd floor addition for 1 bedroom and 1 bath, & roof deck.Details
2-stories rear horizontal addition. add (6) bedroom, (4) bath, (1) laundry rm, (2) living/common area. adu use of ordinance #95-17. 3rd floor addition for 1 bedroom and 1 bath, & roof deck. | $300,000 |
| Mar 4, 2016 | Completed final sign-off May 2016 | 255 Howth St | construct 1 study rom and 1 full bath at basement level. constructu new deck at rear of building 14x10Details
construct 1 study rom and 1 full bath at basement level. constructu new deck at rear of building 14x10 | $32,000 |
| Jan 19, 2016 | Completed final sign-off Jan 2017 | 1831 32nd Av | construct two bedroom, two full bathroom, laundry area & storage room. all work at ground floor.Details
construct two bedroom, two full bathroom, laundry area & storage room. all work at ground floor. | $56,000 |
| Jan 15, 2016 | Completed final sign-off May 2016 | 2330 Sloat Bl | remodel (e) kitchen, bathroom, add one new full bath room, all work at second floor.Details
remodel (e) kitchen, bathroom, add one new full bath room, all work at second floor. | $30,000 |
| Jan 8, 2016 | Completed final sign-off Jul 2016 | 239 Magellan Av | remodel (e) bathroom at 2/f, remodel (e) bathroom & construct one storage room at basement.Details
remodel (e) bathroom at 2/f, remodel (e) bathroom & construct one storage room at basement. | $26,000 |
| Dec 4, 2015 | Completed final sign-off May 2016 | 2330 Sloat Bl | construct two bedrooms, one full bath room & laundry room. all work at ground floor.Details
construct two bedrooms, one full bath room & laundry room. all work at ground floor. | $38,000 |
| Sep 30, 2015 | Completed final sign-off Jun 2017 | 37 Maynard St | revision to pa#201505196642: relocate 1/2 bath & delete bedroom at g/f, remove 3'6" wall at 2nd level between dining & kitchen and add a new beam at the location and post to ground level, relocate bathroom fixture at 3/f bathroom.Details
revision to pa#201505196642: relocate 1/2 bath & delete bedroom at g/f, remove 3'6" wall at 2nd level between dining & kitchen and add a new beam at the location and post to ground level, relocate bathroom fixture at 3/f bathroom. | $2,500 |
| Jun 25, 2015 | Never finaled issued Aug 2016, no final | 866 27th Av | remodel (e) kitchen and bedroom in 2/f; add a family room, 2 baths, a guest room and a study room in 1/f.Details
remodel (e) kitchen and bedroom in 2/f; add a family room, 2 baths, a guest room and a study room in 1/f. | $60,000 |
| May 28, 2015 | Completed final sign-off Nov 2016 | 1839 22nd Av | remodel kitchen, two bathroom at 2nd floor. construct two bedroom, storage room & two full bathroom at ground floor. construct new deck w/staircase at rear of bldg (size approx 16' x 9').Details
remodel kitchen, two bathroom at 2nd floor. construct two bedroom, storage room & two full bathroom at ground floor. construct new deck w/staircase at rear of bldg (size approx 16' x 9'). | $58,000 |
| May 26, 2015 | Expired or cancelled expired Nov 2018 | 358 Mullen Av | general remodeling and light well infill and window replacement in kind with aluminum windows. 2 bathrooms & 1 kitchen.Details
general remodeling and light well infill and window replacement in kind with aluminum windows. 2 bathrooms & 1 kitchen. | $40,000 |
| May 19, 2015 | Completed final sign-off Jun 2017 | 37 Maynard St | remodel (e) bathroom & add one new bathroom at 3rd floor. remodle (e) kitchen, bathroom at 2nd floor. remodel (e) multipurpose room, add half bathroom & bedroom at ground floor.Details
remodel (e) bathroom & add one new bathroom at 3rd floor. remodle (e) kitchen, bathroom at 2nd floor. remodel (e) multipurpose room, add half bathroom & bedroom at ground floor. | $48,000 |
| Apr 30, 2015 | Completed final sign-off Nov 2015 | 456 Los Palmos Dr | revision to appl #2015.0309.0255 - construct wall & install 3'-0" door between (e) bedroom & hallway at 3rd floor. convert (e) half bathroom into full bathroom at 2nd floor.Details
revision to appl #2015.0309.0255 - construct wall & install 3'-0" door between (e) bedroom & hallway at 3rd floor. convert (e) half bathroom into full bathroom at 2nd floor. | $2,000 |
| Mar 31, 2015 | Completed final sign-off Oct 2015 | 274 Naples St | legalize 2 bedrooms, laundry room, storage area and 1 full bathroom and one 1/2 bathroom on ground floor. remove unpermitted kitchen on grnd flrDetails
legalize 2 bedrooms, laundry room, storage area and 1 full bathroom and one 1/2 bathroom on ground floor. remove unpermitted kitchen on grnd flr | $56,000 |
| Mar 9, 2015 | Completed final sign-off Nov 2015 | 456 Los Palmos Dr | abatement of nov#201461201. provide new bathroom on 2nd floor. remodel 2 extg baths on 2nd fl. remodel extg half bath on 1st fl. new silder wood clad windows at front and sliding door at rear. legalize stucco finish at front. legalize tile work at extg stairs at rear yard legalize gas fireplace.Details
abatement of nov#201461201. provide new bathroom on 2nd floor. remodel 2 extg baths on 2nd fl. remodel extg half bath on 1st fl. new silder wood clad windows at front and sliding door at rear. legalize stucco finish at front. legalize tile work at extg stairs at rear yard legalize gas fireplace. | $50,000 |
| Jan 26, 2015 | Never finaled issued Feb 2015, no final | 2600 39th Av | legalize (e) bedrm, family rm, laundry/study rm, one full bathroom and one half bath rm, all work at ground floor. (remove dwelling unit at ground floor).Details
legalize (e) bedrm, family rm, laundry/study rm, one full bathroom and one half bath rm, all work at ground floor. (remove dwelling unit at ground floor). | $36,000 |
| Sep 5, 2014 | Completed final sign-off Feb 2015 | 240 Bowdoin St | legalize one bedroom, one bathroom, construct 2 bedroom, one full bathroom and laundry room, all work at grnd floor.Details
legalize one bedroom, one bathroom, construct 2 bedroom, one full bathroom and laundry room, all work at grnd floor. | $45,000 |
| Jul 25, 2014 | Completed final sign-off Feb 2015 | 721 03rd Av | remodel (e) kitchen, bathroom, replace (e) sheetrock w/new & r-13 insulation & construct new deck w/staircase at rear of bldg at 2nd floor. remodel two (e) bathroom, replace (e) sheetrock w/new & r-13 insulation at 3rd floor. replace stucco in kind at front & wood siding at rear.Details
remodel (e) kitchen, bathroom, replace (e) sheetrock w/new & r-13 insulation & construct new deck w/staircase at rear of bldg at 2nd floor. remodel two (e) bathroom, replace (e) sheetrock w/new & r-13 insulation at 3rd floor. replace stucco in kind at front & wood siding at rear. | $70,000 |
| Sep 17, 2013 | Completed final sign-off Nov 2013 | 270 Turk St | units 705 & 805: remodel bath & kitchen in each unit, to comply with his nov#201144443 dated 6/14/2011Details
units 705 & 805: remodel bath & kitchen in each unit, to comply with his nov#201144443 dated 6/14/2011 | $24,000 |
| Sep 13, 2013 | Completed final sign-off Mar 2014 | 78 Buchanan St | unit #501 - add/remove interior non-bearing walls, relocate kitchen to (e) closet, remodel (e) bathroom, convert (e) kitchen to (n) bathroom, convert (e) dining room into (n) den, new lighting plan for modified spaces.Details
unit #501 - add/remove interior non-bearing walls, relocate kitchen to (e) closet, remodel (e) bathroom, convert (e) kitchen to (n) bathroom, convert (e) dining room into (n) den, new lighting plan for modified spaces. | $35,000 |
| Sep 13, 2013 | Completed final sign-off Apr 2014 | 78 Buchanan St | unit #203: remove/add interior non-bearing walls, remodel (e) kitchen /bath. convert (e) dining to (n) bedroom, add (n) bathroom, add (n) washer/dryer, new lighting plan for modified spaces.Details
unit #203: remove/add interior non-bearing walls, remodel (e) kitchen /bath. convert (e) dining to (n) bedroom, add (n) bathroom, add (n) washer/dryer, new lighting plan for modified spaces. | $40,000 |
| Sep 3, 2013 | Completed final sign-off Jan 2014 | 1440 Sutter St | all work in unit 205 & 303. replace kitchen cabinet & replace bath tile, add gfi in kitchen up to codeDetails
all work in unit 205 & 303. replace kitchen cabinet & replace bath tile, add gfi in kitchen up to code | $15,000 |
| Aug 20, 2013 | Completed final sign-off Nov 2013 | 1290 20th Av | unit #504-remodel (e) bathroom, convert (e) dining room into new bedroom, convert (e) closet into new kitchen. new lighting plan for modified spaces. remove & add interior walls, add new washer & dryer unitDetails
unit #504-remodel (e) bathroom, convert (e) dining room into new bedroom, convert (e) closet into new kitchen. new lighting plan for modified spaces. remove & add interior walls, add new washer & dryer unit | $36,000 |
| Aug 16, 2013 | Completed final sign-off Nov 2013 | 1855 10th Av | unit #7 & #14- replace kitchen cabinets and bath tilesDetails
unit #7 & #14- replace kitchen cabinets and bath tiles | $15,000 |
| Aug 13, 2013 | Completed final sign-off Jun 2014 | 78 Buchanan St | #503- remove/add interior non-bearing walls, remodel (e) kitchen & bath, add (n) bathroom, convert (e) dining into (n) bedroom, add (n) washer/dryer.Details
#503- remove/add interior non-bearing walls, remodel (e) kitchen & bath, add (n) bathroom, convert (e) dining into (n) bedroom, add (n) washer/dryer. | $39,000 |
| Aug 8, 2013 | Never finaled issued Sep 2013, no final | 645 Stockton St | unit #702: all work in unit 702, add/remove interior non-bearing walls, remodel (e) bath & kitchen, convert (e) living into (n) bedrm, add (n) washer/dryer, new lighting plan for modified spacesDetails
unit #702: all work in unit 702, add/remove interior non-bearing walls, remodel (e) bath & kitchen, convert (e) living into (n) bedrm, add (n) washer/dryer, new lighting plan for modified spaces | $36,000 |
| Aug 8, 2013 | Never finaled issued Oct 2013, no final | 645 Stockton St | unit #204: add/remove interior non-bearing walls, remodel bath, relocate kitchen to (e) closet, add (n) washer/dryer, new lighting plan for modified spacesDetails
unit #204: add/remove interior non-bearing walls, remodel bath, relocate kitchen to (e) closet, add (n) washer/dryer, new lighting plan for modified spaces | $36,000 |
| Aug 8, 2013 | Never finaled issued Sep 2013, no final | 645 Stockton St | unit #1002: add/remove interior non -bearing walls, remodel (e) bath and kitchen, convert (e) living into (n) bedrm, add (n) washer/dryer; new lighting plan for modified spacesDetails
unit #1002: add/remove interior non -bearing walls, remodel (e) bath and kitchen, convert (e) living into (n) bedrm, add (n) washer/dryer; new lighting plan for modified spaces | $36,000 |
| Jul 19, 2013 | Completed final sign-off Nov 2013 | 1290 20th Av | #306- remove/add interior walls, convert (e) dining to (n) bedroom, new lighting plan for modified spaces. remodel bathroom.Details
#306- remove/add interior walls, convert (e) dining to (n) bedroom, new lighting plan for modified spaces. remodel bathroom. | $25,000 |
| Jul 15, 2013 | Completed final sign-off Apr 2014 | 1380 Taylor St | remodelto unit #19: relocate kitchen. remodel bathroom and add new bathroom. convert extg dining into a new bedroom. remove/add interior non-bearing and bearing walls.add washer/dryer. new lighting.Details
remodelto unit #19: relocate kitchen. remodel bathroom and add new bathroom. convert extg dining into a new bedroom. remove/add interior non-bearing and bearing walls.add washer/dryer. new lighting. | $65,000 |
| Jul 15, 2013 | Completed final sign-off Mar 2014 | 78 Buchanan St | unit #506:remove /add interior non bearing walls. relocate extg kitchen to extg bedroom, add new washer/dryer. relocate extg bedroom to extg kichn. new lighting plan for modified spaces. remodel extg bathroom. add new bathroom.Details
unit #506:remove /add interior non bearing walls. relocate extg kitchen to extg bedroom, add new washer/dryer. relocate extg bedroom to extg kichn. new lighting plan for modified spaces. remodel extg bathroom. add new bathroom. | $56,700 |
| Jul 10, 2013 | Never finaled issued Aug 2013, no final | 645 Stockton St | all work in #808- add new washer/dryer, add/remove interior non-bearing walls, remodel bath, new lighting plan for modified spaces, relocate kitchen to (e) closet, convrt (e) dining room into (n) bedroom.Details
all work in #808- add new washer/dryer, add/remove interior non-bearing walls, remodel bath, new lighting plan for modified spaces, relocate kitchen to (e) closet, convrt (e) dining room into (n) bedroom. | $35,000 |
| Jul 8, 2013 | Never finaled issued Aug 2013, no final | 950 Franklin St | all work in unit 67. remove add interior walls, move kitchen to existing closet. remodel e bath. convert dining to new bedroom, new lighting plan for modified spaces. new washer dryerDetails
all work in unit 67. remove add interior walls, move kitchen to existing closet. remodel e bath. convert dining to new bedroom, new lighting plan for modified spaces. new washer dryer | $48,000 |
| Jun 28, 2013 | Never finaled issued Jul 2013, no final | 645 Stockton St | 11th floor- all work done in #1101: remove /add interior walls, relocate kitchen to (e) dining, relcoate bath to (e) master bedroom closet, remodel bath, new washer/dryer, convert home office into (n) bedroom, new lighting modified spaces.Details
11th floor- all work done in #1101: remove /add interior walls, relocate kitchen to (e) dining, relcoate bath to (e) master bedroom closet, remodel bath, new washer/dryer, convert home office into (n) bedroom, new lighting modified spaces. | $150,000 |
| Jun 17, 2013 | Never finaled issued Sep 2013, no final | 1 Lansdale Av | comply with nov 201307651: revision 201304094046. delete 1 bath, convert 1/2 bath into full bath at ground floor. remove/re-built partial (e) retaining wall w/new conc. retaining wall at rear.Details
comply with nov 201307651: revision 201304094046. delete 1 bath, convert 1/2 bath into full bath at ground floor. remove/re-built partial (e) retaining wall w/new conc. retaining wall at rear. | $6,000 |
| Jun 4, 2013 | Never finaled issued Jun 2013, no final | 500 Church St | unit #504-remove/add interior walls, remodel kitchen & bathroom. convert (e) living room into new bedroom. convert (e) bedroom into new living room. new washer/dryer. lighting to modified spaces. sffd - reviewed for egress windows from (n) bdrm to public way - okDetails
unit #504-remove/add interior walls, remodel kitchen & bathroom. convert (e) living room into new bedroom. convert (e) bedroom into new living room. new washer/dryer. lighting to modified spaces. sffd - reviewed for egress windows from (n) bdrm to public way - ok | $35,000 |