Back to kitchen remodel contractors
D K G Construction Inc
- Based in
- Novato
- On San Francisco permits
- Dec 2015 to Jun 2026
- Last 24 months
- 9 permits filed
75 permits since 2000: 43 completed, 11 in progress, 14 never finaled, 7 expired or cancelled.
Of the 14 never-finaled permits, 2 are 3 to 5 years old, 12 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 10 completed, 2 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 283 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2025 | Completed final sign-off Apr 2026 | 339 Sweeny St | kitchen and bath remodel on 2nd floor.Details
kitchen and bath remodel on 2nd floor. | $84,370 |
| Dec 2, 2021 | Completed final sign-off May 2022 | 205 Eureka St | one kitchen remodel: replace kitchen cabinets, counters, sink and sink fixures in kind. no structural work.Details
one kitchen remodel: replace kitchen cabinets, counters, sink and sink fixures in kind. no structural work. | $36,000 |
| Oct 21, 2021 | Completed final sign-off Jul 2022 | 2393 Filbert St | remodel 3 bathrooms & 1 kitchen. replace kitchen cbanets & counter top on 2nd floor. (2) bathrooms on 2nd fl. and (1) on 3rd fl. replace fixtures in bathrooms. total 380 sf. no structural work or layout changes. no wall modifications.Details
remodel 3 bathrooms & 1 kitchen. replace kitchen cbanets & counter top on 2nd floor. (2) bathrooms on 2nd fl. and (1) on 3rd fl. replace fixtures in bathrooms. total 380 sf. no structural work or layout changes. no wall modifications. | $165,000 |
| Sep 22, 2021 | Completed final sign-off Mar 2023 | 466 27th St | remodel kitchen and 2 bathrooms, open dining room to kitchen and living room. refurbish decks with new garden stair, new gas fireplace insert, new patio doors, lighting and cosmetic upgrades.Details
remodel kitchen and 2 bathrooms, open dining room to kitchen and living room. refurbish decks with new garden stair, new gas fireplace insert, new patio doors, lighting and cosmetic upgrades. | $300,000 |
| Nov 9, 2020 | Completed final sign-off Oct 2022 | 926 Douglass St | replace kitchen cabinets, new countertops, 3 new electrical outlets, new applicanes. move no electrical outlets in bathroom.Details
replace kitchen cabinets, new countertops, 3 new electrical outlets, new applicanes. move no electrical outlets in bathroom. | $20,000 |
| Aug 31, 2020 | Never finaled issued Oct 2020, no final | 826 35th Av | 2/f: demo of (e) load bearing wall in kitchen. new posts, beams & foundation piers as shown. 3/f: kitchen renovation & (2) bathroom renovations w/new skylight @ bathroom. infill lightwellDetails
2/f: demo of (e) load bearing wall in kitchen. new posts, beams & foundation piers as shown. 3/f: kitchen renovation & (2) bathroom renovations w/new skylight @ bathroom. infill lightwell | $50,000 |
| Feb 6, 2020 | Completed final sign-off Nov 2023 | 232 Precita Av | remodel of (e) kitchen and 1(e) bath, 2(n) baths, and 1 (n) bedrm. excavate approx 138.8cu yards of soil at (e) basement for approx 932 sf of (n) living space.Details
remodel of (e) kitchen and 1(e) bath, 2(n) baths, and 1 (n) bedrm. excavate approx 138.8cu yards of soil at (e) basement for approx 932 sf of (n) living space. | $400,000 |
| Oct 31, 2019 | Never finaled issued Oct 2019, no final | 42 Jasper Pl | replace (3) kitchen cabinets and countertops in kind. all (3) units, install new flooring and trim, paint property, 10x10 sq ft. new shower doors and vanities retile (3) bathrooms onlyDetails
replace (3) kitchen cabinets and countertops in kind. all (3) units, install new flooring and trim, paint property, 10x10 sq ft. new shower doors and vanities retile (3) bathrooms only | $10,000 |
| Aug 28, 2019 | Expired or cancelled expired Jun 2026 | 3620 19th St | replace existing kitchen cabinets in kindDetails
replace existing kitchen cabinets in kind | $8,000 |
| Feb 28, 2017 | Completed final sign-off Oct 2017 | 433 Buena Vista East Av | unit 433a: kitchen & bath remodel of (e) with associated plumbing & electricalDetails
unit 433a: kitchen & bath remodel of (e) with associated plumbing & electrical | $30,000 |
| Aug 30, 2016 | Completed final sign-off Jul 2017 | 63 Linda St | new family room, (n) sitting room, add bath on 1/f, add 1/2 bath on 1/f. remove 2nd stairway, add roof enclose over stair, remodel (e) bath, kitchen, replace windows in kind & new window @ rear, no change to facade.Details
new family room, (n) sitting room, add bath on 1/f, add 1/2 bath on 1/f. remove 2nd stairway, add roof enclose over stair, remodel (e) bath, kitchen, replace windows in kind & new window @ rear, no change to facade. | $80,421 |
| Jan 19, 2016 | Completed final sign-off Aug 2016 | 1 Sheldon Tr | infill existing kitchen window. not visible from streetDetails
infill existing kitchen window. not visible from street | $2,000 |
| Dec 21, 2015 | Completed final sign-off Aug 2016 | 1 Sheldon Tr | kitchen & bathroom renovation at upper unit only. replace existing skylight w/new. replace second unit front facade windows with alumuinum material windows in kind.Details
kitchen & bathroom renovation at upper unit only. replace existing skylight w/new. replace second unit front facade windows with alumuinum material windows in kind. | $100,000 |