D K G Construction Inc
- Based in
- Novato
- On San Francisco permits
- Dec 2015 to Jun 2026
- Last 24 months
- 9 permits filed
75 permits since 2000: 43 completed, 11 in progress, 14 never finaled, 7 expired or cancelled.
Of the 14 never-finaled permits, 2 are 3 to 5 years old, 12 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 expired or cancelled. Typically 27 days from filing to permit and 275 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2024 | Completed final sign-off Mar 2025 | 3271 Jackson St | add stiffening at ext. stairs on front and side of house.install new wider garage door in existing opening. remove portion of wall under ext. stair and replace with beam.Details
add stiffening at ext. stairs on front and side of house.install new wider garage door in existing opening. remove portion of wall under ext. stair and replace with beam. | $25,000 |
| Sep 22, 2021 | Completed final sign-off Mar 2023 | 466 27th St | remodel kitchen and 2 bathrooms, open dining room to kitchen and living room. refurbish decks with new garden stair, new gas fireplace insert, new patio doors, lighting and cosmetic upgrades.Details
remodel kitchen and 2 bathrooms, open dining room to kitchen and living room. refurbish decks with new garden stair, new gas fireplace insert, new patio doors, lighting and cosmetic upgrades. | $300,000 |
| Jul 2, 2019 | Expired or cancelled expired Dec 2023 | 500 Laguna St | conditional use authorization for (n) cannabis retail @ (e) ground floor. 1st fl: (n) interior wall, floor, ceiling finishes, relocate stairs, (n) accessible bathroom. basement: (n) interior wall, floor & ceiling finishes, relocated egress stairs, general electric hvac, (n) security camera systemDetails
conditional use authorization for (n) cannabis retail @ (e) ground floor. 1st fl: (n) interior wall, floor, ceiling finishes, relocate stairs, (n) accessible bathroom. basement: (n) interior wall, floor & ceiling finishes, relocated egress stairs, general electric hvac, (n) security camera system | $50,000 |
| Aug 30, 2016 | Completed final sign-off Jul 2017 | 63 Linda St | new family room, (n) sitting room, add bath on 1/f, add 1/2 bath on 1/f. remove 2nd stairway, add roof enclose over stair, remodel (e) bath, kitchen, replace windows in kind & new window @ rear, no change to facade.Details
new family room, (n) sitting room, add bath on 1/f, add 1/2 bath on 1/f. remove 2nd stairway, add roof enclose over stair, remodel (e) bath, kitchen, replace windows in kind & new window @ rear, no change to facade. | $80,421 |
| Apr 13, 2016 | Completed final sign-off May 2016 | 530 28th St | 50% or less repair to wooden stairs at front of property. repair in kind.Details
50% or less repair to wooden stairs at front of property. repair in kind. | $8,000 |