D K G Construction Inc
- Based in
- Novato
- On San Francisco permits
- Dec 2015 to Jun 2026
- Last 24 months
- 9 permits filed
75 permits since 2000: 43 completed, 11 in progress, 14 never finaled, 7 expired or cancelled.
Of the 14 never-finaled permits, 2 are 3 to 5 years old, 12 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 in progress. Typically 14 days from filing to permit and 729 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2026 | In progress issued Mar 2026 | 105 08th Av | 2/f common area: replace around 30% dryrot on deck, back of bldg, non street facing. deck is 12' x 10'Details
2/f common area: replace around 30% dryrot on deck, back of bldg, non street facing. deck is 12' x 10' | $20,000 |
| Oct 5, 2022 | Completed final sign-off Feb 2025 | 1809 Diamond St | no plumbing or electrical: replacing existing windows and doors with new aluminum wood clad windows and doors: replacing dry rot cedar shingles with new cedar shingles-partial: replacing front part of roof shingles. replacing redwood deck boards. no structural.Details
no plumbing or electrical: replacing existing windows and doors with new aluminum wood clad windows and doors: replacing dry rot cedar shingles with new cedar shingles-partial: replacing front part of roof shingles. replacing redwood deck boards. no structural. | $120,000 |
| Sep 22, 2021 | Completed final sign-off Mar 2023 | 466 27th St | remodel kitchen and 2 bathrooms, open dining room to kitchen and living room. refurbish decks with new garden stair, new gas fireplace insert, new patio doors, lighting and cosmetic upgrades.Details
remodel kitchen and 2 bathrooms, open dining room to kitchen and living room. refurbish decks with new garden stair, new gas fireplace insert, new patio doors, lighting and cosmetic upgrades. | $300,000 |
| Jun 1, 2021 | Completed final sign-off Apr 2025 | 2872 Pine St | (n) bedroom & bathroom @ 2nd fl; (n) office @ (e) garage level; (n) bedroom & bathroom below (e) deck; rebuild (e) deck w/ modifications; interior remodel.Details
(n) bedroom & bathroom @ 2nd fl; (n) office @ (e) garage level; (n) bedroom & bathroom below (e) deck; rebuild (e) deck w/ modifications; interior remodel. | $200,000 |