Back to kitchen remodel contractors
Custom 6 Builders
- Based in
- Oakland
- On San Francisco permits
- May 2011 to Dec 2024
- Last 24 months
- 1 permit filed
18 permits since 2000: 14 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 1 in progress, 1 never finaled. Typically 163 days from filing to permit and 346 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 31, 2024 | In progress issued Jan 2025 | 309 Warren Dr | kitchen remodel. 2 bath remodel. 2 new clerestory windows. 6 new skylights. vault change at dining room/living room.Details
kitchen remodel. 2 bath remodel. 2 new clerestory windows. 6 new skylights. vault change at dining room/living room. | $275,000 |
| Mar 18, 2021 | Completed final sign-off Nov 2022 | 162 Parker Av | add a studio unit within (e) 1st floor. renovate (e) 2nd fl kitchen, bathroom & bedrooms & add a bathroom, laundry closet & spiral stair to backyard.Details
add a studio unit within (e) 1st floor. renovate (e) 2nd fl kitchen, bathroom & bedrooms & add a bathroom, laundry closet & spiral stair to backyard. | $235,000 |
| Dec 17, 2019 | Completed final sign-off May 2022 | 255 Anderson St | remodel of 1st and 2nd floor in existing single family residence including 3 bathrooms and one kitchen, new lowered foundations at rear portion of building. add legal habitable area at 1st floor.Details
remodel of 1st and 2nd floor in existing single family residence including 3 bathrooms and one kitchen, new lowered foundations at rear portion of building. add legal habitable area at 1st floor. | $85,000 |
| Jun 24, 2019 | Never finaled issued Jun 2021, no final | 337 Douglass St | horizontal & vertical to (e) sfh. vertical of approx 3' @ rear portion of roof. horizontal of 14' @ rear & at sw corner @ front. new interior stair. renovated kitchen & bath & new bathrooms. addition of new bedroom & entertainment room. rear yard retaining walls. deck & pool. replace fence.Details
horizontal & vertical to (e) sfh. vertical of approx 3' @ rear portion of roof. horizontal of 14' @ rear & at sw corner @ front. new interior stair. renovated kitchen & bath & new bathrooms. addition of new bedroom & entertainment room. rear yard retaining walls. deck & pool. replace fence. | $300,000 |
| Apr 27, 2018 | Completed final sign-off Nov 2018 | 246 Missouri St | remodel 1 kitchen and 2 bathrooms no exterior or structural workDetails
remodel 1 kitchen and 2 bathrooms no exterior or structural work | $25,000 |
| Sep 17, 2015 | Completed final sign-off Apr 2017 | 317 Los Palmos Dr | 1/f: relocation of walls, new bedroom, bathroom and closets, new exterior deck and door assembly, new windows @ new bathroom. 2/f: remodel kitchen and add a window @ kitchen area.Details
1/f: relocation of walls, new bedroom, bathroom and closets, new exterior deck and door assembly, new windows @ new bathroom. 2/f: remodel kitchen and add a window @ kitchen area. | $120,000 |