Custom 6 Builders
- Based in
- Oakland
- On San Francisco permits
- May 2011 to Dec 2024
- Last 24 months
- 1 permit filed
18 permits since 2000: 14 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 4 completed, 1 never finaled. Typically 271 days from filing to permit and 648 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2019 | Never finaled issued Jun 2021, no final | 337 Douglass St | horizontal & vertical to (e) sfh. vertical of approx 3' @ rear portion of roof. horizontal of 14' @ rear & at sw corner @ front. new interior stair. renovated kitchen & bath & new bathrooms. addition of new bedroom & entertainment room. rear yard retaining walls. deck & pool. replace fence.Details
horizontal & vertical to (e) sfh. vertical of approx 3' @ rear portion of roof. horizontal of 14' @ rear & at sw corner @ front. new interior stair. renovated kitchen & bath & new bathrooms. addition of new bedroom & entertainment room. rear yard retaining walls. deck & pool. replace fence. | $300,000 |
| Dec 30, 2016 | Completed final sign-off Jan 2021 | 2518 14th Av | per unit legalization ordinance 43-14, includes interior remodel at 1st fl unit to comply w/ code as required by ordinance, replacement of less than 50% portion of decking at 2nd fl, replace portion of driveway w/ permeable surface & provide landscaping.Details
per unit legalization ordinance 43-14, includes interior remodel at 1st fl unit to comply w/ code as required by ordinance, replacement of less than 50% portion of decking at 2nd fl, replace portion of driveway w/ permeable surface & provide landscaping. | $118,500 |
| Sep 17, 2015 | Completed final sign-off Apr 2017 | 317 Los Palmos Dr | 1/f: relocation of walls, new bedroom, bathroom and closets, new exterior deck and door assembly, new windows @ new bathroom. 2/f: remodel kitchen and add a window @ kitchen area.Details
1/f: relocation of walls, new bedroom, bathroom and closets, new exterior deck and door assembly, new windows @ new bathroom. 2/f: remodel kitchen and add a window @ kitchen area. | $120,000 |
| Jun 3, 2015 | Completed final sign-off Jan 2019 | 1738 14th Av | new 416 sf deck w/100 sf detached storage below. deck max. 10 ft above grade. shed max 8 ft above grade. new retaining wall with all associatd ground & balcony alteration.Details
new 416 sf deck w/100 sf detached storage below. deck max. 10 ft above grade. shed max 8 ft above grade. new retaining wall with all associatd ground & balcony alteration. | $30,000 |
| May 3, 2012 | Completed final sign-off Jan 2013 | 565 Jersey St | excavate existing basement to create new habitable space including 2 bedrooms & 2 baths. new interior stair to connect new habitable space, partially excavate rear yard for new exterior aptio (demo existing deck), new structural renovations throughout basement level.Details
excavate existing basement to create new habitable space including 2 bedrooms & 2 baths. new interior stair to connect new habitable space, partially excavate rear yard for new exterior aptio (demo existing deck), new structural renovations throughout basement level. | $75,000 |