Back to bathroom remodel contractors
Custom 6 Builders
- Based in
- Oakland
- On San Francisco permits
- May 2011 to Dec 2024
- Last 24 months
- 1 permit filed
18 permits since 2000: 14 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 9 completed, 1 in progress, 2 never finaled. Typically 103 days from filing to permit and 321 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 31, 2024 | In progress issued Jan 2025 | 309 Warren Dr | kitchen remodel. 2 bath remodel. 2 new clerestory windows. 6 new skylights. vault change at dining room/living room.Details
kitchen remodel. 2 bath remodel. 2 new clerestory windows. 6 new skylights. vault change at dining room/living room. | $275,000 |
| Mar 18, 2021 | Completed final sign-off Nov 2022 | 162 Parker Av | add a studio unit within (e) 1st floor. renovate (e) 2nd fl kitchen, bathroom & bedrooms & add a bathroom, laundry closet & spiral stair to backyard.Details
add a studio unit within (e) 1st floor. renovate (e) 2nd fl kitchen, bathroom & bedrooms & add a bathroom, laundry closet & spiral stair to backyard. | $235,000 |
| Dec 2, 2020 | Never finaled issued Apr 2021, no final | 255 Anderson St | revision to pa 201912179817. changes to project include (n) slab on grade at laundry and bath 2, revisions to windows/doors, (n) skylight, plan changes at laundry and bath 2, electrical revisions.Details
revision to pa 201912179817. changes to project include (n) slab on grade at laundry and bath 2, revisions to windows/doors, (n) skylight, plan changes at laundry and bath 2, electrical revisions. | $5,500 |
| Dec 17, 2019 | Completed final sign-off May 2022 | 255 Anderson St | remodel of 1st and 2nd floor in existing single family residence including 3 bathrooms and one kitchen, new lowered foundations at rear portion of building. add legal habitable area at 1st floor.Details
remodel of 1st and 2nd floor in existing single family residence including 3 bathrooms and one kitchen, new lowered foundations at rear portion of building. add legal habitable area at 1st floor. | $85,000 |
| Jun 24, 2019 | Never finaled issued Jun 2021, no final | 337 Douglass St | horizontal & vertical to (e) sfh. vertical of approx 3' @ rear portion of roof. horizontal of 14' @ rear & at sw corner @ front. new interior stair. renovated kitchen & bath & new bathrooms. addition of new bedroom & entertainment room. rear yard retaining walls. deck & pool. replace fence.Details
horizontal & vertical to (e) sfh. vertical of approx 3' @ rear portion of roof. horizontal of 14' @ rear & at sw corner @ front. new interior stair. renovated kitchen & bath & new bathrooms. addition of new bedroom & entertainment room. rear yard retaining walls. deck & pool. replace fence. | $300,000 |
| May 1, 2018 | Completed final sign-off Oct 2020 | 1142 Filbert St | renovation of a s.f.d. : new flooring, doors and window, and radiant heating at 1st and 2nd floors. remodeled bathrooms and rooms at the rear of the bldg at 2nd floor only. infill of lightwell and balcony.Details
renovation of a s.f.d. : new flooring, doors and window, and radiant heating at 1st and 2nd floors. remodeled bathrooms and rooms at the rear of the bldg at 2nd floor only. infill of lightwell and balcony. | $172,000 |
| Apr 27, 2018 | Completed final sign-off Nov 2018 | 246 Missouri St | remodel 1 kitchen and 2 bathrooms no exterior or structural workDetails
remodel 1 kitchen and 2 bathrooms no exterior or structural work | $25,000 |
| Sep 17, 2015 | Completed final sign-off Apr 2017 | 317 Los Palmos Dr | 1/f: relocation of walls, new bedroom, bathroom and closets, new exterior deck and door assembly, new windows @ new bathroom. 2/f: remodel kitchen and add a window @ kitchen area.Details
1/f: relocation of walls, new bedroom, bathroom and closets, new exterior deck and door assembly, new windows @ new bathroom. 2/f: remodel kitchen and add a window @ kitchen area. | $120,000 |
| Jun 3, 2015 | Completed final sign-off Nov 2015 | 1738 14th Av | renovation of (e) bathroom and interior door modification on 2nd floor. no work at exterior.Details
renovation of (e) bathroom and interior door modification on 2nd floor. no work at exterior. | $18,000 |
| Jul 31, 2012 | Completed final sign-off Mar 2013 | 1738 14th Av | legalize/remodel of (e) interior 1st floor master bedroom, bathroom. modifications to building entry including 65 sq ft of new conditioned space & replace 3 widnows & 1 exterior door, add 3ft of fence along property. voluntary strengtheningDetails
legalize/remodel of (e) interior 1st floor master bedroom, bathroom. modifications to building entry including 65 sq ft of new conditioned space & replace 3 widnows & 1 exterior door, add 3ft of fence along property. voluntary strengthening | $35,000 |
| May 3, 2012 | Completed final sign-off Jan 2013 | 565 Jersey St | excavate existing basement to create new habitable space including 2 bedrooms & 2 baths. new interior stair to connect new habitable space, partially excavate rear yard for new exterior aptio (demo existing deck), new structural renovations throughout basement level.Details
excavate existing basement to create new habitable space including 2 bedrooms & 2 baths. new interior stair to connect new habitable space, partially excavate rear yard for new exterior aptio (demo existing deck), new structural renovations throughout basement level. | $75,000 |
| May 16, 2011 | Completed final sign-off Oct 2015 | 439 Clipper St | horizontal addition, rearrange rooms bathrooms & stair. add rooms bathrms at each floor, add new garage.Details
horizontal addition, rearrange rooms bathrooms & stair. add rooms bathrms at each floor, add new garage. | $160,000 |