Cristian Rotoro
- Based in
- Concord
- On San Francisco permits
- Sep 2003 to Aug 2018
- Last 24 months
- 0 permits filed
26 permits since 2000: 21 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 2 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2013 | Completed final sign-off Jan 2014 | 11 Otsego Av | 1)new hall access to bedrooms, kitchen remodeling, closet remodeling, new bathroom layout. 2)front porch to be restored to original. 3)replace extg staircase at rear deck. new railings. 4)partial foundation repair.Details
1)new hall access to bedrooms, kitchen remodeling, closet remodeling, new bathroom layout. 2)front porch to be restored to original. 3)replace extg staircase at rear deck. new railings. 4)partial foundation repair. | $27,000 |
| Jan 26, 2011 | Completed final sign-off Aug 2011 | 958 Capp St | revision to 201010012134, 201101148399. reconfigure landing and repostition 3 lower steps, extend upper run of rear stairsDetails
revision to 201010012134, 201101148399. reconfigure landing and repostition 3 lower steps, extend upper run of rear stairs | $5,000 |
| Aug 19, 2009 | Completed final sign-off Aug 2010 | 259 Bartlett St | remodel 6 bathrooms and 6 kitchens. add 6 new washer/dryers , 1 per unit. dry rot rear deck repair in kind less than 50%, rear bldg rppf, floor joist and wall repair . replacement in kind fron windows. add storage rooms on ground floor. plywood strengthening. new 1-hour interior stairway enclosureDetails
remodel 6 bathrooms and 6 kitchens. add 6 new washer/dryers , 1 per unit. dry rot rear deck repair in kind less than 50%, rear bldg rppf, floor joist and wall repair . replacement in kind fron windows. add storage rooms on ground floor. plywood strengthening. new 1-hour interior stairway enclosure | $80,000 |