Back to kitchen remodel contractors
Cristian Rotoro
- Based in
- Concord
- On San Francisco permits
- Sep 2003 to Aug 2018
- Last 24 months
- 0 permits filed
26 permits since 2000: 21 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 8 completed, 2 never finaled. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2018 | Never finaled issued Aug 2018, no final | 300 03rd St | #518: kitchen & bathroom remodel, 7 new recessed lights. remove partial wall between kitchen/hallway. remove closet wall in master bath & install new vanity. remove shower stall, 2nd bath remodel as in kind.fire alarm shall be compliant with 1103.7.6.1Details
#518: kitchen & bathroom remodel, 7 new recessed lights. remove partial wall between kitchen/hallway. remove closet wall in master bath & install new vanity. remove shower stall, 2nd bath remodel as in kind.fire alarm shall be compliant with 1103.7.6.1 | $36,000 |
| Dec 23, 2016 | Completed final sign-off Jan 2020 | 164 Terra Vista Av | repair & upgrade of bathrooms, kitchen & downstairs (lelvel one) living space including new family room, bedroom, bathroom, laundry room, mudroom room, storage. upgrade of plumbing & electrical.Details
repair & upgrade of bathrooms, kitchen & downstairs (lelvel one) living space including new family room, bedroom, bathroom, laundry room, mudroom room, storage. upgrade of plumbing & electrical. | $85,000 |
| May 9, 2016 | Completed final sign-off Aug 2016 | 779 Kansas St | kitchen and bath remodel: replace bathtub to shower, remove/replace cabinets in-kind, replace windows (wood at front, vinyl at rear) 6-windows total. new main panel 125a, new sub-panel, wire entire house. windows same size and location, max u-factor 0.32Details
kitchen and bath remodel: replace bathtub to shower, remove/replace cabinets in-kind, replace windows (wood at front, vinyl at rear) 6-windows total. new main panel 125a, new sub-panel, wire entire house. windows same size and location, max u-factor 0.32 | $35,000 |
| Dec 13, 2013 | Completed final sign-off May 2014 | 966 Ingerson Av | kitchen and 1 bathroom remodel - in kind on 2/fDetails
kitchen and 1 bathroom remodel - in kind on 2/f | $20,000 |
| Oct 11, 2013 | Completed final sign-off Jan 2014 | 11 Otsego Av | 1)new hall access to bedrooms, kitchen remodeling, closet remodeling, new bathroom layout. 2)front porch to be restored to original. 3)replace extg staircase at rear deck. new railings. 4)partial foundation repair.Details
1)new hall access to bedrooms, kitchen remodeling, closet remodeling, new bathroom layout. 2)front porch to be restored to original. 3)replace extg staircase at rear deck. new railings. 4)partial foundation repair. | $27,000 |
| Jul 21, 2010 | Completed final sign-off Aug 2010 | 259 Bartlett St | as built to show clarification; kitchen area, entry apt., upper level. revision to appl.#2009/0922/7351.Details
as built to show clarification; kitchen area, entry apt., upper level. revision to appl.#2009/0922/7351. | |
| Sep 22, 2009 | Completed final sign-off Aug 2010 | 259 Bartlett St | extending living rm. area at unit 259. adding washer/dryer to all units @ (e) closets. relocate kitchen @ unit 267 & 259. converting liv. rm. to bedrm. @ 1st. & 2nd. flr. revision to appl. #2009/0819/5184.Details
extending living rm. area at unit 259. adding washer/dryer to all units @ (e) closets. relocate kitchen @ unit 267 & 259. converting liv. rm. to bedrm. @ 1st. & 2nd. flr. revision to appl. #2009/0819/5184. | $4,000 |
| Aug 19, 2009 | Completed final sign-off Aug 2010 | 259 Bartlett St | remodel 6 bathrooms and 6 kitchens. add 6 new washer/dryers , 1 per unit. dry rot rear deck repair in kind less than 50%, rear bldg rppf, floor joist and wall repair . replacement in kind fron windows. add storage rooms on ground floor. plywood strengthening. new 1-hour interior stairway enclosureDetails
remodel 6 bathrooms and 6 kitchens. add 6 new washer/dryers , 1 per unit. dry rot rear deck repair in kind less than 50%, rear bldg rppf, floor joist and wall repair . replacement in kind fron windows. add storage rooms on ground floor. plywood strengthening. new 1-hour interior stairway enclosure | $80,000 |
| Sep 19, 2006 | Completed final sign-off Mar 2007 | 1237 06th Av | comply nov 200674549. replace cabinets and counters in 2 kitchens. replace toilets and sinks in bathrooms (2). add pergo flooring and tile on tub surroung and floor. work in #1237 & #1239 only.Details
comply nov 200674549. replace cabinets and counters in 2 kitchens. replace toilets and sinks in bathrooms (2). add pergo flooring and tile on tub surroung and floor. work in #1237 & #1239 only. | $20,000 |
| Sep 25, 2003 | Never finaled issued Sep 2003, no final | 1200 Gough St | replace kitchen cabinets & bathroom tile.Details
replace kitchen cabinets & bathroom tile. | $8,500 |