Block 3643, lot 040
259 Bartlett St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 4,850 sq ft
- Lot
- 6,246 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 9, 2025 | Completed final sign-off Jun 2025 | 259 Bartlett St | Apollo Building & Roofing Group Inc. | re-roofing with hot worksDetails
re-roofing with hot works | $21,000 |
| Dec 19, 2014 | Completed final sign-off Dec 2015 | 259 Bartlett St | Cristian Rotoro | soft story retrofit per sfbc chapter 34b.Details
soft story retrofit per sfbc chapter 34b. | $5,000 |
| Sep 24, 2013 | Completed final sign-off Oct 2013 | 259 Bartlett St | Tracy Anthony General Contractor | clear nov #201264401(ces)- removing ellegal deckDetails
clear nov #201264401(ces)- removing ellegal deck | $50 |
| Dec 7, 2012 | Completed final sign-off Aug 2014 | 259 Bartlett St | German & Green Inc | 1. convert (e) 2nd floor roof area within existing parapet wall into private deck. 2. cover existing roof surface (bituminen sheeting) with new composite decking material product moisture shield. 3. add handrail to (e) parapet wall to meet 42 inch guard rail height code requirement.Details
1. convert (e) 2nd floor roof area within existing parapet wall into private deck. 2. cover existing roof surface (bituminen sheeting) with new composite decking material product moisture shield. 3. add handrail to (e) parapet wall to meet 42 inch guard rail height code requirement. | $1,500 |
| Aug 12, 2010 | Completed final sign-off Aug 2010 | 259 Bartlett St | to obtain final inspection for work approved under pa 200708028574; all work is completeDetails
to obtain final inspection for work approved under pa 200708028574; all work is complete | ||
| Jul 21, 2010 | Completed final sign-off Aug 2010 | 259 Bartlett St | Cristian Rotoro | as built to show clarification; kitchen area, entry apt., upper level. revision to appl.#2009/0922/7351.Details
as built to show clarification; kitchen area, entry apt., upper level. revision to appl.#2009/0922/7351. | |
| Feb 25, 2010 | Completed final sign-off Sep 2010 | 259 Bartlett St | Cristian Rotoro | replace in-kind horizontal siding @ rear & 2-sides of property. install (n) hardi-plank board over horiz. siding. not visable from street.Details
replace in-kind horizontal siding @ rear & 2-sides of property. install (n) hardi-plank board over horiz. siding. not visable from street. | $6,000 |
| Dec 15, 2009 | Completed final sign-off Sep 2010 | 259 Bartlett St | Cristian Rotoro | r e r o o f i n g: resurface composition shingles roof on the property with new as in nina roofing material over 30# felt paper.Details
r e r o o f i n g: resurface composition shingles roof on the property with new as in nina roofing material over 30# felt paper. | $4,000 |
| Oct 9, 2009 | Completed final sign-off Aug 2010 | 259 Bartlett St | Cristian Rotoro | replacement of central heating @all (6) units with new duct system and central heating in kind and same location. provide combustion air per cmc ch 7 26 gauge ducts for penetration between garage and units. furnace 90% afue, attic furnace comply with cmc 931.0Details
replacement of central heating @all (6) units with new duct system and central heating in kind and same location. provide combustion air per cmc ch 7 26 gauge ducts for penetration between garage and units. furnace 90% afue, attic furnace comply with cmc 931.0 | $23,000 |
| Sep 22, 2009 | Completed final sign-off Aug 2010 | 259 Bartlett St | Cristian Rotoro | extending living rm. area at unit 259. adding washer/dryer to all units @ (e) closets. relocate kitchen @ unit 267 & 259. converting liv. rm. to bedrm. @ 1st. & 2nd. flr. revision to appl. #2009/0819/5184.Details
extending living rm. area at unit 259. adding washer/dryer to all units @ (e) closets. relocate kitchen @ unit 267 & 259. converting liv. rm. to bedrm. @ 1st. & 2nd. flr. revision to appl. #2009/0819/5184. | $4,000 |
| Aug 19, 2009 | Completed final sign-off Aug 2010 | 259 Bartlett St | Cristian Rotoro | remodel 6 bathrooms and 6 kitchens. add 6 new washer/dryers , 1 per unit. dry rot rear deck repair in kind less than 50%, rear bldg rppf, floor joist and wall repair . replacement in kind fron windows. add storage rooms on ground floor. plywood strengthening. new 1-hour interior stairway enclosureDetails
remodel 6 bathrooms and 6 kitchens. add 6 new washer/dryers , 1 per unit. dry rot rear deck repair in kind less than 50%, rear bldg rppf, floor joist and wall repair . replacement in kind fron windows. add storage rooms on ground floor. plywood strengthening. new 1-hour interior stairway enclosure | $80,000 |
| Jul 28, 2009 | Never finaled issued Jul 2009, no final | 259 Bartlett St | street spaceDetails
street space | ||
| Jul 15, 2009 | Never finaled issued Jul 2009, no final | 259 Bartlett St | to add addresses to block 3643 lot 040 (currently are #259, #261 and #263). (propose to add #259a for the unit on top of #259) (#265 for the unit on top of #261) and (#267 for the unit on top of #263)Details
to add addresses to block 3643 lot 040 (currently are #259, #261 and #263). (propose to add #259a for the unit on top of #259) (#265 for the unit on top of #261) and (#267 for the unit on top of #263) | ||
| Jun 25, 2009 | Never finaled issued Jun 2009, no final | 259 Bartlett St | street spaceDetails
street space | ||
| Jun 10, 2009 | Completed final sign-off Aug 2010 | 259 Bartlett St | Cristian Rotoro | increase the estimate cost from $120,000 to $155,000 per approved pa 200708028574Details
increase the estimate cost from $120,000 to $155,000 per approved pa 200708028574 | $35,000 |
| Aug 2, 2007 | Expired or cancelled expired Aug 2010 | 259 Bartlett St | Cristian Rotoro | foundation upgrade, first floor framing upgrade to accomodate installation of garages (per submitted plans). new shear wall upgrade in garage, repair as in kind backstairs, no work on exterior elevation to be done.Details
foundation upgrade, first floor framing upgrade to accomodate installation of garages (per submitted plans). new shear wall upgrade in garage, repair as in kind backstairs, no work on exterior elevation to be done. | $120,000 |
| May 8, 2007 | Completed final sign-off Sep 2007 | 259 Bartlett St | emergency shoring up on removed bearing line for garage(extg 1st floor in unit 263 barlett)Details
emergency shoring up on removed bearing line for garage(extg 1st floor in unit 263 barlett) | $1,600 | |
| Mar 30, 2007 | Completed final sign-off Aug 2007 | 259 Bartlett St | Aileron Builders | repair dryrot in deck les than 50% & stairs. (no window + no door work on this permit) to comply with his nov#200787400.Details
repair dryrot in deck les than 50% & stairs. (no window + no door work on this permit) to comply with his nov#200787400. | $1,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cristian Rotoro (9), Aileron Builders, Apollo Building & Roofing Group Inc., German & Green Inc, Tracy Anthony General Contractor
- Engineers
- Toma Goncerenco
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.