Clonduff Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to Jun 2025
- Last 24 months
- 7 permits filed
53 permits since 2000: 41 completed, 5 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 106 days from filing to permit and 277 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 16, 2022 | Completed final sign-off Sep 2023 | 267 Roosevelt Wy | lightwell infill (1-story). bath & kitchen remodel. rebuild interior stair. new windows and doors at rear. new skylights at roof. limited structural.Details
lightwell infill (1-story). bath & kitchen remodel. rebuild interior stair. new windows and doors at rear. new skylights at roof. limited structural. | $125,000 |
| May 17, 2018 | Completed final sign-off Feb 2022 | 86 Waller St | horizontal & vertical addition. reconfigure interior spaces. second dwelling unit added 1st floor. new deck and stairs to rear yard.Details
horizontal & vertical addition. reconfigure interior spaces. second dwelling unit added 1st floor. new deck and stairs to rear yard. | $98,000 |
| May 23, 2017 | Completed final sign-off Nov 2019 | 48 Clifford Tr | new roof top deck & access stair @ (e) roof.Details
new roof top deck & access stair @ (e) roof. | $50,000 |
| Oct 20, 2011 | Completed final sign-off Mar 2012 | 75 Santa Rita Av | remodel of extg kitchen/nook, relocation of stair to basement level and new powder room, enlarge rear deck/balcony adjacent to kitchen.Details
remodel of extg kitchen/nook, relocation of stair to basement level and new powder room, enlarge rear deck/balcony adjacent to kitchen. | $98,000 |
| Sep 28, 2010 | Completed final sign-off Dec 2010 | 1049 Treat Av | replace in-kind per cbc code req'd (e) ext. side egress stairs. -no added sq footage; -no int. work; -no change to bldg envelope or front facadeDetails
replace in-kind per cbc code req'd (e) ext. side egress stairs. -no added sq footage; -no int. work; -no change to bldg envelope or front facade | $10,000 |