Back to bathroom remodel contractors
Clonduff Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to Jun 2025
- Last 24 months
- 7 permits filed
53 permits since 2000: 41 completed, 5 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 15 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 435 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 8, 2024 | Completed final sign-off Mar 2026 | 130 Madrone Av | kitchen and bathroom remodel in kindDetails
kitchen and bathroom remodel in kind | $125,000 |
| Oct 9, 2024 | In progress issued Oct 2025 | 881 Foerster St | rev 202304175823- remove (e) balcony. revise layout of bathroom remodelDetails
rev 202304175823- remove (e) balcony. revise layout of bathroom remodel | |
| Oct 5, 2022 | Completed final sign-off Apr 2023 | 2780 Diamond St | permit revision to pa# 201912270778. revision to deck railing. revision to first story bathroom.Details
permit revision to pa# 201912270778. revision to deck railing. revision to first story bathroom. | |
| Sep 23, 2022 | Expired or cancelled withdrawn Oct 2022 | 267 Roosevelt Wy | rev to pa# 2022-0516-4299: keep light well, keep (e) rear bay volume, bath and kichem remodel, new windows at rear & east, new skylights, limeted structural workDetails
rev to pa# 2022-0516-4299: keep light well, keep (e) rear bay volume, bath and kichem remodel, new windows at rear & east, new skylights, limeted structural work | |
| May 16, 2022 | Completed final sign-off Sep 2023 | 267 Roosevelt Wy | lightwell infill (1-story). bath & kitchen remodel. rebuild interior stair. new windows and doors at rear. new skylights at roof. limited structural.Details
lightwell infill (1-story). bath & kitchen remodel. rebuild interior stair. new windows and doors at rear. new skylights at roof. limited structural. | $125,000 |
| Dec 27, 2019 | Completed final sign-off Apr 2023 | 2782 Diamond St | horizontal addition of (e) 3-story, 2-unit residence to comply w/ current zoning. interior remodel. no significant grading. unit 1: (2) bedrooms & (2.5) bath. unit 2: (2) bedrooms & (1.5) bath. new deck at rear.Details
horizontal addition of (e) 3-story, 2-unit residence to comply w/ current zoning. interior remodel. no significant grading. unit 1: (2) bedrooms & (2.5) bath. unit 2: (2) bedrooms & (1.5) bath. new deck at rear. | $300,000 |
| Apr 29, 2019 | Completed final sign-off Nov 2021 | 2609 Scott St | kitchen & bathroom remodel. all cosmetic changes. no structural work to be done. no walls, framing modification.Details
kitchen & bathroom remodel. all cosmetic changes. no structural work to be done. no walls, framing modification. | $90,000 |
| Dec 5, 2018 | Completed final sign-off Oct 2020 | 2506 Washington St | interior remodel and associated structural work of existing first and second floors. on first floor, remodel of kitchen, living room, dining room, powder room, and family room. on second floor remodel of master bedroom, batrhoom and remodel of bedrooms and shared bathroom.Details
interior remodel and associated structural work of existing first and second floors. on first floor, remodel of kitchen, living room, dining room, powder room, and family room. on second floor remodel of master bedroom, batrhoom and remodel of bedrooms and shared bathroom. | $300,000 |
| Sep 12, 2018 | Completed final sign-off Oct 2020 | 2506 Washington St | expansion of e basement level including associated structural work to include bedroom, mediaroom, mudroom, full bathDetails
expansion of e basement level including associated structural work to include bedroom, mediaroom, mudroom, full bath | $200,000 |
| Aug 2, 2017 | Completed final sign-off Jan 2020 | 24 Presidio Tr | 2nd floor: bathroom remodel all cosmetic no structural. no change in wall & opening layoutDetails
2nd floor: bathroom remodel all cosmetic no structural. no change in wall & opening layout | $15,000 |
| Jun 15, 2016 | Completed final sign-off Sep 2017 | 24 Presidio Tr | kitchen and bathroom remodel. replace in kind. all cosmetic- no structural work.Details
kitchen and bathroom remodel. replace in kind. all cosmetic- no structural work. | $135,000 |
| Mar 8, 2016 | Completed final sign-off Nov 2016 | 24 Presidio Tr | remodel 3rd fl bathroom, install new tile fixts. no structural work. remove & replace in-kind 4 windows same size not visible from the street.Details
remodel 3rd fl bathroom, install new tile fixts. no structural work. remove & replace in-kind 4 windows same size not visible from the street. | $15,000 |
| Nov 13, 2015 | Completed final sign-off Apr 2018 | 829 Clayton St | remodel (e) home & rear yard addition & raise portion of roof in rear. existing 3 bed, 2 baths will become 5 bedrooms and 3.5 baths.Details
remodel (e) home & rear yard addition & raise portion of roof in rear. existing 3 bed, 2 baths will become 5 bedrooms and 3.5 baths. | $415,000 |
| Oct 15, 2015 | Never finaled issued Oct 2015, no final | 1011 Kearny St | remove & replace the floor tiles in kind in the lobby to kearny. cosmetic upgrade in the bathrooms floor area. all fixtures 4replace in (e) location. no structural work to be done. ref. pa#201501095394Details
remove & replace the floor tiles in kind in the lobby to kearny. cosmetic upgrade in the bathrooms floor area. all fixtures 4replace in (e) location. no structural work to be done. ref. pa#201501095394 | $8,000 |
| Mar 9, 2015 | Never finaled issued Feb 2016, no final | 55 Buena Vista Tr | propose remodel & addition at 2nd flr master bath & bedroom. extent of work include 9'-7" (247 sf) horizontal addition to exterior rear wall at 2nd flr only. roof at proposed work to be remodeled. no work to remaining (e) areas of the house or site. n/a for maher ordinance.Details
propose remodel & addition at 2nd flr master bath & bedroom. extent of work include 9'-7" (247 sf) horizontal addition to exterior rear wall at 2nd flr only. roof at proposed work to be remodeled. no work to remaining (e) areas of the house or site. n/a for maher ordinance. | $150,000 |
| Sep 12, 2013 | Completed final sign-off Jan 2014 | 55 Buena Vista Tr | demo (e) bathroom finishes and fixtures for new wet bar area; all cosmetic no structural install new gas fireplaceDetails
demo (e) bathroom finishes and fixtures for new wet bar area; all cosmetic no structural install new gas fireplace | $45,000 |
| May 10, 2013 | Completed final sign-off Sep 2013 | 4 Pacheco St | remodel (e) kitchen and and bath. convert (e) closet to 2nd bath. replace 3 sideyard windows with new to match (e). non structural demolition.Details
remodel (e) kitchen and and bath. convert (e) closet to 2nd bath. replace 3 sideyard windows with new to match (e). non structural demolition. | $75,000 |
| Oct 22, 2012 | Completed final sign-off Feb 2013 | 1055 Lombard St | unit #c - kitchen & bathroom remodel - new cabinets, counter tops, new sink, new toilet, tiles, patching wood floor.Details
unit #c - kitchen & bathroom remodel - new cabinets, counter tops, new sink, new toilet, tiles, patching wood floor. | $35,000 |
| Jun 8, 2011 | Completed final sign-off Jun 2011 | 308 Spruce St | comply with physical inspection cc-5950; remove illegal bathroom in storage areaDetails
comply with physical inspection cc-5950; remove illegal bathroom in storage area | $4,000 |