Clonduff Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to Jun 2025
- Last 24 months
- 7 permits filed
53 permits since 2000: 41 completed, 5 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
9 deck permits: 9 completed. Typically 174 days from filing to permit and 364 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2025 | Completed final sign-off Mar 2026 | 130 Madrone Av | window and siding replacement in kind. interior remodel. modify existing exterior rear deck. no building envelope expansionDetails
window and siding replacement in kind. interior remodel. modify existing exterior rear deck. no building envelope expansion | $650,000 |
| Oct 5, 2022 | Completed final sign-off Apr 2023 | 2780 Diamond St | permit revision to pa# 201912270778. revision to deck railing. revision to first story bathroom.Details
permit revision to pa# 201912270778. revision to deck railing. revision to first story bathroom. | |
| Dec 27, 2019 | Completed final sign-off Apr 2023 | 2782 Diamond St | horizontal addition of (e) 3-story, 2-unit residence to comply w/ current zoning. interior remodel. no significant grading. unit 1: (2) bedrooms & (2.5) bath. unit 2: (2) bedrooms & (1.5) bath. new deck at rear.Details
horizontal addition of (e) 3-story, 2-unit residence to comply w/ current zoning. interior remodel. no significant grading. unit 1: (2) bedrooms & (2.5) bath. unit 2: (2) bedrooms & (1.5) bath. new deck at rear. | $300,000 |
| Jul 13, 2018 | Completed final sign-off Nov 2019 | 912 Wisconsin St | repair and replace portion of the existing deck in the rear yard.Details
repair and replace portion of the existing deck in the rear yard. | $6,000 |
| May 17, 2018 | Completed final sign-off Feb 2022 | 86 Waller St | horizontal & vertical addition. reconfigure interior spaces. second dwelling unit added 1st floor. new deck and stairs to rear yard.Details
horizontal & vertical addition. reconfigure interior spaces. second dwelling unit added 1st floor. new deck and stairs to rear yard. | $98,000 |
| Jul 28, 2017 | Completed final sign-off Jul 2020 | 466 Clipper St | horizontal addition to rear, basement; dditional living space underneath deck, expend garage for two cars, main level; reorganizing kitchen, dinning, laundry & living foom, enclose front porch. third level, divide existing bhrm, extend existing dormer, ad new dormer, adequate headrm & ext masterbedDetails
horizontal addition to rear, basement; dditional living space underneath deck, expend garage for two cars, main level; reorganizing kitchen, dinning, laundry & living foom, enclose front porch. third level, divide existing bhrm, extend existing dormer, ad new dormer, adequate headrm & ext masterbed | $340,000 |
| May 27, 2015 | Completed final sign-off May 2016 | 222 El Camino Del Mar | new deck at rear yard. new gas firepit, outdoor kitchen, hottubDetails
new deck at rear yard. new gas firepit, outdoor kitchen, hottub | $9,000 |
| Mar 19, 2015 | Completed final sign-off Dec 2016 | 1764 Dolores St | 362 sf horizontal addition to 1st fl @ rear, 86 sf horizontal addition to 2nd fl @ rear, interior remodel of kitchen & miscellaneous improvements to finishes throughout the house, create useable deck on top of 2nd fl addition.Details
362 sf horizontal addition to 1st fl @ rear, 86 sf horizontal addition to 2nd fl @ rear, interior remodel of kitchen & miscellaneous improvements to finishes throughout the house, create useable deck on top of 2nd fl addition. | $189,000 |
| Oct 20, 2011 | Completed final sign-off Mar 2012 | 75 Santa Rita Av | remodel of extg kitchen/nook, relocation of stair to basement level and new powder room, enlarge rear deck/balcony adjacent to kitchen.Details
remodel of extg kitchen/nook, relocation of stair to basement level and new powder room, enlarge rear deck/balcony adjacent to kitchen. | $98,000 |