Back to kitchen remodel contractors
City Building Inc.
- Based in
- San Mateo
- On San Francisco permits
- Feb 2000 to Jun 2026
- Last 24 months
- 6 permits filed
516 permits since 2000: 335 completed, 8 in progress, 81 never finaled, 92 expired or cancelled.
Of the 81 never-finaled permits, 9 are 5 to 10 years old, 72 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
68 kitchen remodel permits: 55 completed, 1 in progress, 6 never finaled, 6 expired or cancelled. Typically 0 days from filing to permit and 74 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2025 | In progress issued Mar 2025 | 333 07th St | excavate 5' x 5' x 3' deep pit in kitchen corner to expose footing. space to remain vacantDetails
excavate 5' x 5' x 3' deep pit in kitchen corner to expose footing. space to remain vacant | $11,208 |
| Jan 26, 2017 | Completed final sign-off May 2017 | 1661 Pine St | unit #636. 2 baths & 1 kitchen remodel new cabinets & plumbing fixts throughout. 2 new shower pans. no walls removed or relocated. no lighting change. n/a for maher.Details
unit #636. 2 baths & 1 kitchen remodel new cabinets & plumbing fixts throughout. 2 new shower pans. no walls removed or relocated. no lighting change. n/a for maher. | $40,000 |
| Jan 26, 2017 | Never finaled issued Jan 2017, no final | 1661 Pine St | unit #528. 1 1/2 bath & 1 kitchen remodel new cabinets & plumbing fixts throughout. new shower pan. no walls removed or relocated. no lighting change. n/a for maher.Details
unit #528. 1 1/2 bath & 1 kitchen remodel new cabinets & plumbing fixts throughout. new shower pan. no walls removed or relocated. no lighting change. n/a for maher. | $30,000 |
| Oct 17, 2016 | Completed final sign-off Dec 2016 | 1661 Pine St | unit #526: one bath and 1 kitchen remodel. new cabinets & plumbing fixtures throughout. one shower pan. no walls, windows, or door removed or relocated.Details
unit #526: one bath and 1 kitchen remodel. new cabinets & plumbing fixtures throughout. one shower pan. no walls, windows, or door removed or relocated. | $18,000 |
| Oct 17, 2016 | Completed final sign-off Jan 2017 | 1661 Pine St | unit #426: two baths and 1 kitchen remodel. new cabinets & plumbing fixtures throughout. two shower pans. no walls, window, or door removed or relocated.Details
unit #426: two baths and 1 kitchen remodel. new cabinets & plumbing fixtures throughout. two shower pans. no walls, window, or door removed or relocated. | $21,000 |
| Oct 17, 2016 | Expired or cancelled expired Nov 2017 | 1661 Pine St | unit #513: one bath and 1 kitchen remodel. new cabinets & plumbing fixtures throughout. no walls, window, or door removed or relocated.Details
unit #513: one bath and 1 kitchen remodel. new cabinets & plumbing fixtures throughout. no walls, window, or door removed or relocated. | $18,000 |
| Aug 30, 2016 | Completed final sign-off Oct 2016 | 1661 Pine St | unit # 935, 1 bath , 1 kitchen new cabinets & plumbing fixtures throughout, 1 shower pan no wall removed or relocatedDetails
unit # 935, 1 bath , 1 kitchen new cabinets & plumbing fixtures throughout, 1 shower pan no wall removed or relocated | $18,000 |
| Aug 30, 2016 | Expired or cancelled expired Nov 2017 | 1661 Pine St | unit # 513, 1 bath , 1 kitchen new cabinets & plumbing fixtures throughout, 1 shower pan no wall removed or relocatedDetails
unit # 513, 1 bath , 1 kitchen new cabinets & plumbing fixtures throughout, 1 shower pan no wall removed or relocated | $18,000 |
| Aug 1, 2016 | Completed final sign-off Sep 2016 | 1661 Pine St | #1023: (2) bath/(1) kitchen remodeling. new cabinet & plumbing fixtures throughout. new shower pan. no walls removed or relocated, no lighting change.Details
#1023: (2) bath/(1) kitchen remodeling. new cabinet & plumbing fixtures throughout. new shower pan. no walls removed or relocated, no lighting change. | $21,000 |
| Aug 1, 2016 | Completed final sign-off Jan 2017 | 1661 Pine St | #339: (1) bath/(1) kitchen remodel. new cabinet & plumbing fixtures throughout. new shower pan. no walls removed or relocated, no lighting change.Details
#339: (1) bath/(1) kitchen remodel. new cabinet & plumbing fixtures throughout. new shower pan. no walls removed or relocated, no lighting change. | $18,000 |
| Jun 15, 2016 | Completed final sign-off Sep 2016 | 1661 Pine St | unit 344: (1) bath/(1) kitchen; new cabinets & plumbing fixtures throughout, (1) new shower pan, no walls removed/relocated; compliance with maher ordinance no 155-13 not required.Details
unit 344: (1) bath/(1) kitchen; new cabinets & plumbing fixtures throughout, (1) new shower pan, no walls removed/relocated; compliance with maher ordinance no 155-13 not required. | $18,000 |
| Jun 15, 2016 | Completed final sign-off Sep 2016 | 1661 Pine St | unit 341: (2) bath/(1) kitchen; new cabinets & plumbing fixtures throughout, (1) new shower pan, no walls removed/relocated; compliance with maher ordinance no 155-13 not requiredDetails
unit 341: (2) bath/(1) kitchen; new cabinets & plumbing fixtures throughout, (1) new shower pan, no walls removed/relocated; compliance with maher ordinance no 155-13 not required | $25,000 |
| Jun 15, 2016 | Completed final sign-off Aug 2016 | 1661 Pine St | unit 716: (2) bath/(1) kitchen; new cabinets & plumbing fixtures throughout, (1) new shower pan, no walls removed/relocated; compliance with maher ordinance no 155-13 not requiredDetails
unit 716: (2) bath/(1) kitchen; new cabinets & plumbing fixtures throughout, (1) new shower pan, no walls removed/relocated; compliance with maher ordinance no 155-13 not required | $18,000 |
| Mar 24, 2016 | Completed final sign-off Jul 2016 | 1661 Pine St | apt #837: 2 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 2 new shower pan. like for like. no walls removed or relocated.Details
apt #837: 2 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 2 new shower pan. like for like. no walls removed or relocated. | $18,000 |
| Mar 24, 2016 | Completed final sign-off Jul 2016 | 1661 Pine St | apt #1112: 2 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 2 new shower pan. like for like. no walls removed or relocated.Details
apt #1112: 2 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 2 new shower pan. like for like. no walls removed or relocated. | $18,000 |
| Mar 24, 2016 | Completed final sign-off May 2016 | 1661 Pine St | apt #615: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated.Details
apt #615: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated. | $18,000 |
| Mar 24, 2016 | Completed final sign-off Jun 2016 | 1661 Pine St | apt #833: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated.Details
apt #833: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated. | $18,000 |
| Mar 24, 2016 | Completed final sign-off May 2016 | 1661 Pine St | apt #824: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated.Details
apt #824: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated. | $18,000 |
| Mar 24, 2016 | Completed final sign-off Jun 2016 | 1661 Pine St | apt #844: 2 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 2 new shower pan. like for like. no walls removed or relocated.Details
apt #844: 2 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 2 new shower pan. like for like. no walls removed or relocated. | $18,000 |
| Mar 24, 2016 | Completed final sign-off Jun 2016 | 1661 Pine St | apt #810: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated.Details
apt #810: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated. | $18,000 |
| Jan 20, 2016 | Completed final sign-off May 2016 | 1661 Pine St | apt 713: remodel 2 bathroms, 1 kitchen. new cabinets & plumbing fixtures throughout. 2 new shower pans.Details
apt 713: remodel 2 bathroms, 1 kitchen. new cabinets & plumbing fixtures throughout. 2 new shower pans. | $21,000 |
| Jan 20, 2016 | Completed final sign-off Nov 2016 | 1661 Pine St | apt 313: remodel 1 bathroms, 1 kitchen. new cabinets & plumbing fixtures throughout. 1 new shower pans.Details
apt 313: remodel 1 bathroms, 1 kitchen. new cabinets & plumbing fixtures throughout. 1 new shower pans. | $18,000 |
| Oct 16, 2015 | Completed final sign-off Nov 2016 | 1661 Pine St | unit #618: bath and kitchen remodel. new cabinets and plumbing fixtures throughout. new shower pan.Details
unit #618: bath and kitchen remodel. new cabinets and plumbing fixtures throughout. new shower pan. | $18,000 |
| Oct 16, 2015 | Never finaled issued Oct 2015, no final | 1661 Pine St | unit #626: bathroom and kitchen remodel. new cabinets and plumbing fixtures throughout. new shower pan.Details
unit #626: bathroom and kitchen remodel. new cabinets and plumbing fixtures throughout. new shower pan. | $18,000 |
| Oct 16, 2015 | Never finaled issued Oct 2015, no final | 1661 Pine St | unit #826: two baths and one kitchen remodel. new cabinets and plumbing fixtures throughout. two new shower pans.Details
unit #826: two baths and one kitchen remodel. new cabinets and plumbing fixtures throughout. two new shower pans. | $21,000 |
| Oct 16, 2015 | Never finaled issued Oct 2015, no final | 1661 Pine St | unit #616: bathroom and kitchen remodel. new cabinets, plumbing fixtures throughout. new shower pan.Details
unit #616: bathroom and kitchen remodel. new cabinets, plumbing fixtures throughout. new shower pan. | $18,000 |
| Sep 2, 2015 | Completed final sign-off Sep 2015 | 1661 Pine St | work in unit 835: new kitchen and bathroom cabinets (1 bath), new tile at bathroom, new plumbing fixtures throughout kitchen and bathDetails
work in unit 835: new kitchen and bathroom cabinets (1 bath), new tile at bathroom, new plumbing fixtures throughout kitchen and bath | $18,000 |
| Jul 13, 2015 | Completed final sign-off Sep 2015 | 1661 Pine St | unit #924. new kitchen & bathroom cabinets (1 bath). no wall modification. no structural work. n/a for maher.Details
unit #924. new kitchen & bathroom cabinets (1 bath). no wall modification. no structural work. n/a for maher. | $25,000 |
| Jul 13, 2015 | Completed final sign-off Sep 2015 | 1661 Pine St | unit #424. new kitchen & bathroom cabinets (1 bath). no wall modification. no structural work. n/a for maher.Details
unit #424. new kitchen & bathroom cabinets (1 bath). no wall modification. no structural work. n/a for maher. | $25,000 |
| Jul 13, 2015 | Completed final sign-off Sep 2015 | 1661 Pine St | unit #628. new kitchen & bathroom cabinets (2 baths). no wall modification. no structural work. n/a for maher.Details
unit #628. new kitchen & bathroom cabinets (2 baths). no wall modification. no structural work. n/a for maher. | $32,000 |
| Jun 23, 2015 | Completed final sign-off Aug 2015 | 1661 Pine St | unit 825 - new kitchen and bathroom cabinets (1); new tile at 1 bathroom, new plumbing fixtures throughout. no wall to be removed & alteredDetails
unit 825 - new kitchen and bathroom cabinets (1); new tile at 1 bathroom, new plumbing fixtures throughout. no wall to be removed & altered | $18,000 |
| Jun 23, 2015 | Completed final sign-off Sep 2015 | 1661 Pine St | unit 1044 - new kitchen and bathroom cabinets (2); new tile at 2 bathrooms, new plumbing fixtures throughout. no wall to be removed & alteredDetails
unit 1044 - new kitchen and bathroom cabinets (2); new tile at 2 bathrooms, new plumbing fixtures throughout. no wall to be removed & altered | $25,000 |
| Jun 23, 2015 | Completed final sign-off Aug 2015 | 1661 Pine St | unit 533 - new kitchen and bathroom cabinets (1); new tile at 1 bathroom, new plumbing fixtures throughout. no wall to be removed & alteredDetails
unit 533 - new kitchen and bathroom cabinets (1); new tile at 1 bathroom, new plumbing fixtures throughout. no wall to be removed & altered | $18,000 |
| Jun 23, 2015 | Completed final sign-off Sep 2015 | 1661 Pine St | unit 723 - new kitchen and bathroom cabinets (1); new tile at 1 bathroom, new plumbing fixtures throughout. no wall to be removed & alteredDetails
unit 723 - new kitchen and bathroom cabinets (1); new tile at 1 bathroom, new plumbing fixtures throughout. no wall to be removed & altered | $18,000 |
| Jun 23, 2015 | Completed final sign-off Sep 2015 | 1661 Pine St | unit 644 - new kitchen and bathroom cabinets (2.5); new tile at 2.5 bathrooms, new plumbing fixtures throughout. no wall to be removed & alteredDetails
unit 644 - new kitchen and bathroom cabinets (2.5); new tile at 2.5 bathrooms, new plumbing fixtures throughout. no wall to be removed & altered | $28,000 |
| May 15, 2015 | Completed final sign-off Jul 2015 | 1661 Pine St | work in unit #913: new kitchen and bathroom cabinets 92), new tile at two bathrooms, new plumbing fixtures throughout, no walls to be moved a,, fire resistive assemblies to be maintained.Details
work in unit #913: new kitchen and bathroom cabinets 92), new tile at two bathrooms, new plumbing fixtures throughout, no walls to be moved a,, fire resistive assemblies to be maintained. | $25,000 |
| May 15, 2015 | Completed final sign-off Aug 2015 | 1661 Pine St | work in unit 625: new kitchen and bathroom cabinets (2), new tile at two bathrooms, new plumbing fixtures throughout. no walls to be moved, all fire resistive asemblies to be maintained.Details
work in unit 625: new kitchen and bathroom cabinets (2), new tile at two bathrooms, new plumbing fixtures throughout. no walls to be moved, all fire resistive asemblies to be maintained. | $25,000 |
| Jan 15, 2015 | Completed final sign-off Mar 2015 | 1661 Pine St | #324: new kitchen & new bathroom cabinets, counter tops. new plumbing fixtures and tile throughout. one kitchen, one bathroom.Details
#324: new kitchen & new bathroom cabinets, counter tops. new plumbing fixtures and tile throughout. one kitchen, one bathroom. | $18,000 |
| Jan 15, 2015 | Completed final sign-off Jan 2015 | 1661 Pine St | #413: new kitchen and bath cabinets, new tile at bathrooms, new plumbing fixtures throughout. one kitchen, two bathrooms.Details
#413: new kitchen and bath cabinets, new tile at bathrooms, new plumbing fixtures throughout. one kitchen, two bathrooms. | $27,000 |
| Aug 1, 2014 | Completed final sign-off Sep 2014 | 1661 Pine St | #834- new kitchen & bathroom cabinets, new tile at 1 bathroom, new plumbing fixtures throughout. n/a to ordinance #155-13.Details
#834- new kitchen & bathroom cabinets, new tile at 1 bathroom, new plumbing fixtures throughout. n/a to ordinance #155-13. | $18,000 |
| Aug 1, 2014 | Never finaled issued Aug 2014, no final | 1661 Pine St | #428- new kitchen & bathroom cabinets, new tile at 2 bathrooms, new plumbing fixtures throughout. n/a to ordinance #155-13.Details
#428- new kitchen & bathroom cabinets, new tile at 2 bathrooms, new plumbing fixtures throughout. n/a to ordinance #155-13. | $27,000 |
| Aug 1, 2014 | Completed final sign-off Sep 2014 | 1661 Pine St | #544- new kitchen & bathroom cabinets, new tile at 2 bathrooms, new plumbing fixtures throughout. n/a to ordinance #155-13.Details
#544- new kitchen & bathroom cabinets, new tile at 2 bathrooms, new plumbing fixtures throughout. n/a to ordinance #155-13. | $27,000 |
| Apr 10, 2014 | Completed final sign-off Jan 2016 | 760 Harrison St | 1st floor interior t.i. - new interior partition, new kitchen & pharmacy cabinets & counter, new kitchen appliances, new electrical outlets & relocation of existing lighting, new wellness center w/new restroom & upgrade to existing accessible restrooms. n/a maher ord 155-13Details
1st floor interior t.i. - new interior partition, new kitchen & pharmacy cabinets & counter, new kitchen appliances, new electrical outlets & relocation of existing lighting, new wellness center w/new restroom & upgrade to existing accessible restrooms. n/a maher ord 155-13 | $350,000 |
| Feb 25, 2014 | Completed final sign-off Apr 2014 | 1661 Pine St | unit #645. new kitchen and bath cabinets, new tile at bathrooms. new plumbing fixtures throughout includes one kitchen 100 sq ft. two bathrooms 40 sq ft.Details
unit #645. new kitchen and bath cabinets, new tile at bathrooms. new plumbing fixtures throughout includes one kitchen 100 sq ft. two bathrooms 40 sq ft. | $31,016 |
| Feb 25, 2014 | Completed final sign-off Apr 2014 | 1661 Pine St | unit#318 - 1 kitchen 1 bath, unit#419 - 1 kitchen 1 bath, unit#918 - 1 kitchen 1 bath, unit#917 - 1 kitchen 1.5 bath. new kitchen and bath cabinets new tile at bathrooms. new plumbing fixtures throughout kitchen 100 sq ft, bath 40 sq ft.Details
unit#318 - 1 kitchen 1 bath, unit#419 - 1 kitchen 1 bath, unit#918 - 1 kitchen 1 bath, unit#917 - 1 kitchen 1.5 bath. new kitchen and bath cabinets new tile at bathrooms. new plumbing fixtures throughout kitchen 100 sq ft, bath 40 sq ft. | $124,064 |
| Oct 18, 2013 | Completed final sign-off Nov 2013 | 1661 Pine St | unit 1018: new kitchen & bathroom cabinets, new bathroom tile @ one bath.Details
unit 1018: new kitchen & bathroom cabinets, new bathroom tile @ one bath. | $18,000 |
| Oct 18, 2013 | Completed final sign-off Nov 2013 | 1661 Pine St | unit 316: new kitchen & bathroom cabinets, new bathroom tile @ one bathroom.Details
unit 316: new kitchen & bathroom cabinets, new bathroom tile @ one bathroom. | $18,000 |
| Oct 18, 2013 | Completed final sign-off Jan 2014 | 1661 Pine St | unit 915: new kitchen & bathroom cabinets, new bathroom tile @ one bath.Details
unit 915: new kitchen & bathroom cabinets, new bathroom tile @ one bath. | $18,000 |
| Oct 18, 2013 | Completed final sign-off Jan 2014 | 1661 Pine St | new kitchen & bathroom cabinets, new bathroom tile @ bathroom. units 631, 731 & 714 have one kitchen & one bathroom. units 928 & 638 have one kitchen & two bathrooms. total 5 kitches & 7 bathrooms.Details
new kitchen & bathroom cabinets, new bathroom tile @ bathroom. units 631, 731 & 714 have one kitchen & one bathroom. units 928 & 638 have one kitchen & two bathrooms. total 5 kitches & 7 bathrooms. | $108,000 |
| Aug 22, 2013 | Completed final sign-off Jan 2014 | 1661 Pine St | unit #836: new kitchen and bathroom cabinets and tile, with stone counter top, no lightingDetails
unit #836: new kitchen and bathroom cabinets and tile, with stone counter top, no lighting | $27,000 |
| Aug 22, 2013 | Completed final sign-off Aug 2013 | 1661 Pine St | unit #817: new kitchen and bath cabinets and tile, new stone countertop, no lightingDetails
unit #817: new kitchen and bath cabinets and tile, new stone countertop, no lighting | $27,000 |
| Jul 3, 2013 | Completed final sign-off Oct 2013 | 1380 Howard St | 5th floor tenant space improvement employeeonly cafe. demolish (e) kitchen (no oven) & cafe finishes including t-bar ceiling & vct flooring, install new t-bar ceiling & flooring throughout. install new caseworks, new 3 compartment dish sink, & new electrical circuits for appliances.Details
5th floor tenant space improvement employeeonly cafe. demolish (e) kitchen (no oven) & cafe finishes including t-bar ceiling & vct flooring, install new t-bar ceiling & flooring throughout. install new caseworks, new 3 compartment dish sink, & new electrical circuits for appliances. | $27,000 |
| May 21, 2013 | Completed final sign-off Jan 2014 | 1661 Pine St | comply with co alarm per cbc-2010 section 420.4. (n) kitchen & bath cabinets. (n) tile at 2 bathrooms. no mechanical work.Details
comply with co alarm per cbc-2010 section 420.4. (n) kitchen & bath cabinets. (n) tile at 2 bathrooms. no mechanical work. | $18,000 |
| May 21, 2013 | Completed final sign-off May 2013 | 1661 Pine St | comply with cbc 2010 section 420.4 co alarm. (n) bathroom & kitchen cabinest. (n) title @ 2 bathrooms. no mechanical work.Details
comply with cbc 2010 section 420.4 co alarm. (n) bathroom & kitchen cabinest. (n) title @ 2 bathrooms. no mechanical work. | $18,000 |
| Mar 8, 2013 | Completed final sign-off Apr 2013 | 2712 Mission St | demo extg kitchen on 2nd floor, construct new walls and install new door, cabinets, flooring and sink at kitchen. demo extg reception desk on ground floor and construct new reception desk with new door and transaction windows. demo extg cabinets at treatment rooms and install new cabinets.Details
demo extg kitchen on 2nd floor, construct new walls and install new door, cabinets, flooring and sink at kitchen. demo extg reception desk on ground floor and construct new reception desk with new door and transaction windows. demo extg cabinets at treatment rooms and install new cabinets. | $60,000 |
| Dec 6, 2012 | Never finaled issued Dec 2012, no final | 1661 Pine St | unit #646. (1) new kitchen and bath cabinets two new full bathrooms, one half bath.Details
unit #646. (1) new kitchen and bath cabinets two new full bathrooms, one half bath. | $18,000 |
| Dec 6, 2012 | Completed final sign-off Mar 2013 | 1661 Pine St | unit #1037: new one kitchen and bath cabinets, new finishes at 2 bathsDetails
unit #1037: new one kitchen and bath cabinets, new finishes at 2 baths | $18,000 |
| Dec 6, 2012 | Completed final sign-off Apr 2013 | 1661 Pine St | unit #417: new one kitchen and bath cabinets, new finishes at 2 new bathroomsDetails
unit #417: new one kitchen and bath cabinets, new finishes at 2 new bathrooms | $18,000 |
| Dec 6, 2012 | Completed final sign-off Jan 2013 | 1661 Pine St | unit #1138: new one kitchen and bath cabinets, new finishes at 2 bathroomsDetails
unit #1138: new one kitchen and bath cabinets, new finishes at 2 bathrooms | $18,000 |
| Dec 6, 2012 | Completed final sign-off Mar 2013 | 1661 Pine St | new kitchen and bath cabinets. new finishes at one bathroom each in unit 914, 831, 519, 916 & 815. 5 kitchens & 5 bathrooms.Details
new kitchen and bath cabinets. new finishes at one bathroom each in unit 914, 831, 519, 916 & 815. 5 kitchens & 5 bathrooms. | $88,000 |
| Oct 18, 2012 | Completed final sign-off Nov 2012 | 1661 Pine St | # 537: new kitchen and bath cabinets, new tile @ bathDetails
# 537: new kitchen and bath cabinets, new tile @ bath | $18,000 |
| Jul 31, 2012 | Expired or cancelled expired Aug 2013 | 1661 Pine St | # 1244: new kitchen and bath cabinets, new tile at bathsDetails
# 1244: new kitchen and bath cabinets, new tile at baths | $18,000 |
| Jul 31, 2012 | Expired or cancelled expired Aug 2013 | 1661 Pine St | #1113: remove kitchen and (2) bath cabinets, new tile at baths.Details
#1113: remove kitchen and (2) bath cabinets, new tile at baths. | $18,000 |
| Apr 24, 2012 | Completed final sign-off Jul 2012 | 1661 Pine St | replace 1 kitchen and 1 bath cabinets. new tile, new light fixtures to comply with cec 150k.Details
replace 1 kitchen and 1 bath cabinets. new tile, new light fixtures to comply with cec 150k. | $20,000 |
| Mar 27, 2012 | Expired or cancelled expired Aug 2013 | 1661 Pine St | to comply with complaint # 201204781. new kitchen and bath cabinet, new bath tile units # 738, 533, 639, 936 (all accessible features to remain)Details
to comply with complaint # 201204781. new kitchen and bath cabinet, new bath tile units # 738, 533, 639, 936 (all accessible features to remain) | $40,000 |
| Mar 27, 2012 | Completed final sign-off May 2012 | 1661 Pine St | remove single side-wall fire sprinkler from existing closet that is being demolished (remove closet doors); new kitchen and bathroom cabinets (2 baths) in unit 744Details
remove single side-wall fire sprinkler from existing closet that is being demolished (remove closet doors); new kitchen and bathroom cabinets (2 baths) in unit 744 | $18,000 |
| Jan 16, 2004 | Completed final sign-off Aug 2004 | 222 Danvers St | remodel (e) kitchen, convert (e) pantry & storage into dining room & convert (e) under stair closetDetails
remodel (e) kitchen, convert (e) pantry & storage into dining room & convert (e) under stair closet | $40,000 |
| May 8, 2002 | Expired or cancelled expired Aug 2004 | 1188 Franklin St | install new metal stud and drywall paritions w/new electrical ,new kitchen w/appliances/cabinets,paiDetails
install new metal stud and drywall paritions w/new electrical ,new kitchen w/appliances/cabinets,pai | $94,000 |