Christopher's Construction Inc
- Based in
- Novato
- On San Francisco permits
- May 2007 to Aug 2026
- Last 24 months
- 5 permits filed
89 permits since 2000: 68 completed, 5 in progress, 11 never finaled, 5 expired or cancelled.
Of the 11 never-finaled permits, 4 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 10 completed. Typically 10 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2021 | Completed final sign-off Mar 2022 | 5 Grand View Tr | add 5'6" opening in non bearing interior wall. replace kitchen countertopsDetails
add 5'6" opening in non bearing interior wall. replace kitchen countertops | $4,000 |
| Sep 12, 2019 | Completed final sign-off Sep 2020 | 2111 Franklin St | remodel (e) kitchen (160 sf), 2 baths, 2 bedrooms, living room replace , in - kind, scope of work in bedrooms/living room is trim & plaster (repair/replacement only) no structural work no modeification to wall layoutDetails
remodel (e) kitchen (160 sf), 2 baths, 2 bedrooms, living room replace , in - kind, scope of work in bedrooms/living room is trim & plaster (repair/replacement only) no structural work no modeification to wall layout | $250,000 |
| Jan 17, 2019 | Completed final sign-off Oct 2019 | 349 Cumberland St | remodel existing kitchen, remodel (3) bathrooms.Details
remodel existing kitchen, remodel (3) bathrooms. | $56,000 |
| Nov 8, 2017 | Completed final sign-off Aug 2020 | 4348 24th St | 3 story horizontal addition. interior remodel of (e) home. remodel kitchen, move powder room & remodel (e) master bath.Details
3 story horizontal addition. interior remodel of (e) home. remodel kitchen, move powder room & remodel (e) master bath. | $440,000 |
| Mar 18, 2015 | Completed final sign-off Jul 2016 | 170 Pacific Av | demolition of e wall at lower level. relocate e electrical panel, upgrade e baths, refinishe e kitchen cabinetsDetails
demolition of e wall at lower level. relocate e electrical panel, upgrade e baths, refinishe e kitchen cabinets | $200,000 |
| Oct 14, 2014 | Completed final sign-off Apr 2017 | 2961 Webster St | lateral strengthening, lower (e) slab @ basement approx 4 feet deep w/ new foundation. new bathrooms & laundry at basement level. remodel kitchen & bathrooms at second level, relocate 1 and install new bathroom at 3rd level.Details
lateral strengthening, lower (e) slab @ basement approx 4 feet deep w/ new foundation. new bathrooms & laundry at basement level. remodel kitchen & bathrooms at second level, relocate 1 and install new bathroom at 3rd level. | $140,000 |
| Feb 22, 2012 | Completed final sign-off May 2012 | 1998 Pacific Av | unit #302-remodel kitchen & 2 bathroomsDetails
unit #302-remodel kitchen & 2 bathrooms | $40,000 |
| Sep 23, 2011 | Completed final sign-off Jan 2012 | 2594 Oakdale Av | remodel existing front office, create new commissary kitchen in e back office area for commercial kitchen use, add 2 new ada baths, 1 utility room, new stair to e mezz area to replace e stair. plumb, elec, mech included.Details
remodel existing front office, create new commissary kitchen in e back office area for commercial kitchen use, add 2 new ada baths, 1 utility room, new stair to e mezz area to replace e stair. plumb, elec, mech included. | $70,000 |
| Oct 13, 2010 | Completed final sign-off Jan 2011 | 66 Cleary Ct | remove and replace kitchen cabinets. up date master closet. enclose terrace with window system. install side light/window on balcony and infill side portion of balcony with concrete block.Details
remove and replace kitchen cabinets. up date master closet. enclose terrace with window system. install side light/window on balcony and infill side portion of balcony with concrete block. | $16,000 |
| Dec 12, 2008 | Completed final sign-off Jun 2009 | 905 Kansas St | full kitchen remodel w/ structural change, full master bath remodel, partial gues bath remodel. built-in cabinetry, lighting upgrade at 1st floor per plan.Details
full kitchen remodel w/ structural change, full master bath remodel, partial gues bath remodel. built-in cabinetry, lighting upgrade at 1st floor per plan. | $75,000 |