Back to bathroom remodel contractors
Christopher's Construction Inc
- Based in
- Novato
- On San Francisco permits
- May 2007 to Aug 2026
- Last 24 months
- 5 permits filed
89 permits since 2000: 68 completed, 5 in progress, 11 never finaled, 5 expired or cancelled.
Of the 11 never-finaled permits, 4 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 21 completed, 2 in progress. Typically 1 days from filing to permit and 287 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2026 | In progress issued Jul 2026 | 8 Hill Point Av | revision to permit 202507080372. relocate partition for workout room at 1/l. remove (e) walls at (e) 2/l and 3/l. relocate (e) bathroom at 2/l and remove shower. add pantry & reconfigure office at 2/l. add new bathroom at 3/l and reconfigure closet and study. replace n & e metal windows in kind.Details
revision to permit 202507080372. relocate partition for workout room at 1/l. remove (e) walls at (e) 2/l and 3/l. relocate (e) bathroom at 2/l and remove shower. add pantry & reconfigure office at 2/l. add new bathroom at 3/l and reconfigure closet and study. replace n & e metal windows in kind. | $100,000 |
| Apr 10, 2025 | In progress issued Apr 2025 | 8 Hill Point Av | remodel 2x bathroom. removal of non load bearing walls to create larger closet. removal of wood burning fireplace. no structural work. no requirement for plan per field inspector per david jonesDetails
remodel 2x bathroom. removal of non load bearing walls to create larger closet. removal of wood burning fireplace. no structural work. no requirement for plan per field inspector per david jones | $75,000 |
| May 16, 2023 | Completed final sign-off May 2024 | 2901 Pierce St | replace extg street facing windows @ 1st lvl w/in-kind casements (including 1st lvl bathroom window), add additional bathroom @ 3rd lvl, windows-clad replacement-u factor 0.29.Details
replace extg street facing windows @ 1st lvl w/in-kind casements (including 1st lvl bathroom window), add additional bathroom @ 3rd lvl, windows-clad replacement-u factor 0.29. | $45,000 |
| Sep 29, 2022 | Completed final sign-off May 2024 | 2901 Pierce St | remove and replace damaged sheet rock and plywood in kind in bathrooms, dining room, entry foyer. remodel 3 bathrooms, fixture locations to the remain. install led lighting , bathroom , fans to be humidstat controlled.Details
remove and replace damaged sheet rock and plywood in kind in bathrooms, dining room, entry foyer. remodel 3 bathrooms, fixture locations to the remain. install led lighting , bathroom , fans to be humidstat controlled. | $55,000 |
| Feb 12, 2020 | Completed final sign-off Sep 2020 | 2111 Franklin St | revision to app#201909121429. install new bathroom in extg walkin closet, reconfigure master closet and laundry. install high efficacy lighting.Details
revision to app#201909121429. install new bathroom in extg walkin closet, reconfigure master closet and laundry. install high efficacy lighting. | $11,000 |
| Dec 17, 2019 | Completed final sign-off Sep 2020 | 349 Cumberland St | remodeling (e) bathroom on 1st lvl, like for like update surfaces of 1st flrm from wood paneling to sheetrock & paint, all non-fire rated walls. no framing changes.Details
remodeling (e) bathroom on 1st lvl, like for like update surfaces of 1st flrm from wood paneling to sheetrock & paint, all non-fire rated walls. no framing changes. | $6,000 |
| Sep 12, 2019 | Completed final sign-off Sep 2020 | 2111 Franklin St | remodel (e) kitchen (160 sf), 2 baths, 2 bedrooms, living room replace , in - kind, scope of work in bedrooms/living room is trim & plaster (repair/replacement only) no structural work no modeification to wall layoutDetails
remodel (e) kitchen (160 sf), 2 baths, 2 bedrooms, living room replace , in - kind, scope of work in bedrooms/living room is trim & plaster (repair/replacement only) no structural work no modeification to wall layout | $250,000 |
| Jan 17, 2019 | Completed final sign-off Oct 2019 | 349 Cumberland St | remodel existing kitchen, remodel (3) bathrooms.Details
remodel existing kitchen, remodel (3) bathrooms. | $56,000 |
| Nov 8, 2017 | Completed final sign-off Aug 2020 | 4348 24th St | 3 story horizontal addition. interior remodel of (e) home. remodel kitchen, move powder room & remodel (e) master bath.Details
3 story horizontal addition. interior remodel of (e) home. remodel kitchen, move powder room & remodel (e) master bath. | $440,000 |
| Aug 18, 2016 | Completed final sign-off Sep 2016 | 1823 Turk St | revision to pa#201310119174s1 - revise bathroom windows @ rear, add side door (east elev.) to garage, add new wood deck at rear (+29" above grade) with metal utility stair to side yard. remove two (e) property line windows on west side, one property line window to remain.Details
revision to pa#201310119174s1 - revise bathroom windows @ rear, add side door (east elev.) to garage, add new wood deck at rear (+29" above grade) with metal utility stair to side yard. remove two (e) property line windows on west side, one property line window to remain. | $8,500 |
| Mar 18, 2015 | Completed final sign-off Jul 2016 | 170 Pacific Av | demolition of e wall at lower level. relocate e electrical panel, upgrade e baths, refinishe e kitchen cabinetsDetails
demolition of e wall at lower level. relocate e electrical panel, upgrade e baths, refinishe e kitchen cabinets | $200,000 |
| Oct 14, 2014 | Completed final sign-off Apr 2017 | 2961 Webster St | lateral strengthening, lower (e) slab @ basement approx 4 feet deep w/ new foundation. new bathrooms & laundry at basement level. remodel kitchen & bathrooms at second level, relocate 1 and install new bathroom at 3rd level.Details
lateral strengthening, lower (e) slab @ basement approx 4 feet deep w/ new foundation. new bathrooms & laundry at basement level. remodel kitchen & bathrooms at second level, relocate 1 and install new bathroom at 3rd level. | $140,000 |
| Apr 9, 2014 | Completed final sign-off Apr 2015 | 2333 Vallejo St | install 2 new bathrooms on gr floor. remodel existing workroom to a bedroom, family room to workroom.Details
install 2 new bathrooms on gr floor. remodel existing workroom to a bedroom, family room to workroom. | $15,000 |
| Sep 9, 2013 | Completed final sign-off Dec 2013 | 3845 Washington St | replace 12 front windows in kind, with new aluminum clad wood windows and replace bath windows in kind.Details
replace 12 front windows in kind, with new aluminum clad wood windows and replace bath windows in kind. | $20,000 |
| Jul 24, 2013 | Completed final sign-off Mar 2015 | 3845 Washington St | remodel 2 baths, new interior doors, (n) 2'2"x4' wood window on 3/fDetails
remodel 2 baths, new interior doors, (n) 2'2"x4' wood window on 3/f | $25,000 |
| Apr 23, 2013 | Completed final sign-off Mar 2015 | 3845 Washington St | revision to pa# 2013-0109-7543-increase expansion into 1st floor crawl space to create a media room, new full bathroom & mechanical room. permitted work changes are-new full bathroom into powder room, relocate door to (e) stairs. new steel joists to support (e) 2nd floor fireplaceDetails
revision to pa# 2013-0109-7543-increase expansion into 1st floor crawl space to create a media room, new full bathroom & mechanical room. permitted work changes are-new full bathroom into powder room, relocate door to (e) stairs. new steel joists to support (e) 2nd floor fireplace | $45,000 |
| Jan 9, 2013 | Completed final sign-off Mar 2015 | 3845 Washington St | interior remodel of a portion of the 1st fl, including a remodeled bath & new stair framing. at the garage level, lower level & crawl space floor to create 179 sq ft of unconditioned storage area.Details
interior remodel of a portion of the 1st fl, including a remodeled bath & new stair framing. at the garage level, lower level & crawl space floor to create 179 sq ft of unconditioned storage area. | $43,000 |
| Feb 22, 2012 | Completed final sign-off May 2012 | 1998 Pacific Av | unit #302-remodel kitchen & 2 bathroomsDetails
unit #302-remodel kitchen & 2 bathrooms | $40,000 |
| Sep 23, 2011 | Completed final sign-off Jan 2012 | 2594 Oakdale Av | remodel existing front office, create new commissary kitchen in e back office area for commercial kitchen use, add 2 new ada baths, 1 utility room, new stair to e mezz area to replace e stair. plumb, elec, mech included.Details
remodel existing front office, create new commissary kitchen in e back office area for commercial kitchen use, add 2 new ada baths, 1 utility room, new stair to e mezz area to replace e stair. plumb, elec, mech included. | $70,000 |
| Jun 10, 2011 | Completed final sign-off Sep 2011 | 2417 Divisadero St | replacement window at front elevation and renovation of 2 extg bathrooms at 2nd floor in a three story bldg. max u-factor .40 window in kind. lighting to comply with cec 150(k)Details
replacement window at front elevation and renovation of 2 extg bathrooms at 2nd floor in a three story bldg. max u-factor .40 window in kind. lighting to comply with cec 150(k) | $24,000 |
| Feb 24, 2011 | Completed final sign-off Oct 2011 | 3851 Clay St | relocate remodeled existing bathroom and remove (n) storage previously approved under permit 201101047804. install 3 dormers on eastside of (e) roof, replace windows in bedrm #5Details
relocate remodeled existing bathroom and remove (n) storage previously approved under permit 201101047804. install 3 dormers on eastside of (e) roof, replace windows in bedrm #5 | $38,000 |
| Jan 4, 2011 | Completed final sign-off Mar 2011 | 3851 Clay St | remodel existing bath, remove e non bearing partitions, reswing e doors, add closet to e bedroom 4Details
remodel existing bath, remove e non bearing partitions, reswing e doors, add closet to e bedroom 4 | $8,000 |
| Dec 12, 2008 | Completed final sign-off Jun 2009 | 905 Kansas St | full kitchen remodel w/ structural change, full master bath remodel, partial gues bath remodel. built-in cabinetry, lighting upgrade at 1st floor per plan.Details
full kitchen remodel w/ structural change, full master bath remodel, partial gues bath remodel. built-in cabinetry, lighting upgrade at 1st floor per plan. | $75,000 |