Block 5597A, lot 011
2594 Oakdale Ave
- City’s use
- Industrial
- Built
- 1972
- Stories
- 1
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 9,584 sq ft
- Lot
- 14,422 sq ft
- Zoning
- PDR2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 23, 2023 | Never finaled filed May 2023, never issued | 2594 Oakdale Av | proposed pre-fab pyro-chem system to be install on the spraybooths.Details
proposed pre-fab pyro-chem system to be install on the spraybooths. | $5,000 | |
| Apr 3, 2023 | Expired or cancelled cancelled Jan 2026 | 2594 Oakdale Av | proposed to install pre-fab spraybooths with existing building.Details
proposed to install pre-fab spraybooths with existing building. | $19,000 | |
| Aug 6, 2019 | Completed final sign-off Sep 2019 | 2594 Oakdale Av | Zivko Corporation Inc Dba Metal Building | reroofing: remove replace non structural sheet metal roof with the same material.Details
reroofing: remove replace non structural sheet metal roof with the same material. | $75,964 |
| Feb 22, 2016 | Completed final sign-off Mar 2016 | 2594 Oakdale Av | International Fire Equip | ul 300 fire system coverage for new kitchen equipment.Details
ul 300 fire system coverage for new kitchen equipment. | $4,000 |
| Dec 19, 2011 | Completed final sign-off Jan 2012 | 2594 Oakdale Av | Star Plumbing & Fire Const Co. | install new fire supression system for kitchen hood and duct onlyDetails
install new fire supression system for kitchen hood and duct only | $4,000 |
| Sep 23, 2011 | Completed final sign-off Jan 2012 | 2594 Oakdale Av | Christopher's Construction Inc | remodel existing front office, create new commissary kitchen in e back office area for commercial kitchen use, add 2 new ada baths, 1 utility room, new stair to e mezz area to replace e stair. plumb, elec, mech included.Details
remodel existing front office, create new commissary kitchen in e back office area for commercial kitchen use, add 2 new ada baths, 1 utility room, new stair to e mezz area to replace e stair. plumb, elec, mech included. | $70,000 |
| Aug 5, 2011 | Completed final sign-off Jan 2012 | 2594 Oakdale Av | Christopher's Construction Inc | demolition of existing non-bearing walls in front and back office space. exploratory demolition of walls, ceilings & floors for plumbing & mechanical runs. all work is subject to sfbc ab-017.Details
demolition of existing non-bearing walls in front and back office space. exploratory demolition of walls, ceilings & floors for plumbing & mechanical runs. all work is subject to sfbc ab-017. | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Christopher's Construction Inc (2), International Fire Equip, Star Plumbing & Fire Const Co., Zivko Corporation Inc Dba Metal Building
- Architects
- Shawn Gorman
- Engineers
- Albert Lee, Moon Kang, Rodrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.