Centric Building Inc.
- Based in
- St Helena
- On San Francisco permits
- Oct 2008 to Sep 2026
- Last 24 months
- 6 permits filed
80 permits since 2000: 67 completed, 2 in progress, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
7 stairs permits: 4 completed, 2 never finaled, 1 expired or cancelled. Typically 58 days from filing to permit and 434 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 26, 2021 | Completed final sign-off Apr 2022 | 56 Presidio Av | new exterior walkway, stairs, fence and gate. including structrual garden wallDetails
new exterior walkway, stairs, fence and gate. including structrual garden wall | $75,000 |
| Aug 9, 2019 | Completed final sign-off Mar 2020 | 56 Presidio Av | repair and replace stucco at south elevation and stair terrace/landing, tile and water proofing 50% max. replace tile finishes in kind at garage hallway. work not visible from public right of way.Details
repair and replace stucco at south elevation and stair terrace/landing, tile and water proofing 50% max. replace tile finishes in kind at garage hallway. work not visible from public right of way. | $60,000 |
| Jan 24, 2019 | Completed final sign-off Mar 2021 | 595 Clipper St | comply with 201806761 rev. to pa 201107079682, 201711073406, 201803093281. remodel of (e) lower unit remodel @ 1st floor inc kitchen and bath structural upgrades @ 1st floor inc foundation replacement (n) spiral stair clear, 2 (n) fire rated pl as ab-009 to abate 2018015629enf bid 201806761Details
comply with 201806761 rev. to pa 201107079682, 201711073406, 201803093281. remodel of (e) lower unit remodel @ 1st floor inc kitchen and bath structural upgrades @ 1st floor inc foundation replacement (n) spiral stair clear, 2 (n) fire rated pl as ab-009 to abate 2018015629enf bid 201806761 | $40,000 |
| Nov 8, 2018 | Expired or cancelled cancelled Jan 2026 | 2233 Lyon St | replace (e) garage door. (e) windows at rear yard & rear terrace stair relocationDetails
replace (e) garage door. (e) windows at rear yard & rear terrace stair relocation | $18,000 |
| May 8, 2017 | Completed final sign-off Feb 2019 | 2233 Lyon St | interior renovation 4 floors. remodel kitchen. all baths, stairs & new elevator. structural strenghthen. ** maher: n/a **Details
interior renovation 4 floors. remodel kitchen. all baths, stairs & new elevator. structural strenghthen. ** maher: n/a ** | $1,800,000 |
| Aug 10, 2015 | Never finaled issued Oct 2015, no final | 555 Post St | this permit includes the alteration of (1) existing passenger elevator,new compliant stair & door, will be added at elevator penthouse on roof, mep shall be part of a separate permit.Details
this permit includes the alteration of (1) existing passenger elevator,new compliant stair & door, will be added at elevator penthouse on roof, mep shall be part of a separate permit. | $16,000 |
| Jul 7, 2011 | Never finaled issued Oct 2016, no final | 595 Clipper St | addition of new third floor bedroom and bath with new stair from second to third floor. renovation of exterior facade including new windows.Details
addition of new third floor bedroom and bath with new stair from second to third floor. renovation of exterior facade including new windows. | $240,000 |