Permit GraphShortlistSan Francisco building permits since 2000

Centric Building Inc.

Contractor license
862909
State license record
Based in
St Helena
On San Francisco permits
Oct 2008 to Sep 2026
Last 24 months
6 permits filed

80 permits since 2000: 67 completed, 2 in progress, 6 never finaled, 5 expired or cancelled.

Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Kitchen remodel permits

AllRoof deck 1Deck 4Stairs 7Kitchen remodel 11Bathroom remodel 17

11 kitchen remodel permits: 10 completed, 1 never finaled. Typically 14 days from filing to permit and 543 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Feb 21, 2025Completed
final sign-off Apr 2026
2649 Greenwich Stkitchen remodel and (2) bathrooms remodel
Details
Permit
202502210858
Status
complete
Filed
Feb 21, 2025
Permit issued
Mar 5, 2025
Final sign-off
Apr 30, 2026
Declared cost
$60,000
Address
2649 Greenwich St

kitchen remodel and (2) bathrooms remodel

Open the permit page

$60,000
Oct 22, 2021Completed
final sign-off Mar 2026
1940 Broadwayunit 4: interior renovation includes replacement of exterior windows and doors with double pane insulated glass, single lite windows changed to divided lite to match street side elevation. kitchen and bathroom remodel.
Details
Permit
202110221029
Status
complete
Filed
Oct 22, 2021
Permit issued
Nov 5, 2021
Final sign-off
Mar 23, 2026
Declared cost
$245,000
Address
1940 Broadway

unit 4: interior renovation includes replacement of exterior windows and doors with double pane insulated glass, single lite windows changed to divided lite to match street side elevation. kitchen and bathroom remodel.

Open the permit page

$245,000
Feb 6, 2020Completed
final sign-off Jun 2021
601 04th Stimprovement to unit #222 including: expand study/home office with higher walls & new adjoining bath, new kitchen cabinets, & appliances, kitchen & bath replacement will be in kind.
Details
Permit
202002063777
Status
complete
Filed
Feb 6, 2020
Permit issued
Mar 2, 2020
Final sign-off
Jun 22, 2021
Declared cost
$45,000
Address
601 04th St

improvement to unit #222 including: expand study/home office with higher walls & new adjoining bath, new kitchen cabinets, & appliances, kitchen & bath replacement will be in kind.

Open the permit page

$45,000
Jan 9, 2020Completed
final sign-off Aug 2020
601 04th Stunit 222 - remodel 1 kitchen and 1 bath in kind
Details
Permit
202001091538
Status
complete
Filed
Jan 9, 2020
Permit issued
Jan 9, 2020
Final sign-off
Aug 24, 2020
Declared cost
$40,000
Address
601 04th St

unit 222 - remodel 1 kitchen and 1 bath in kind

Open the permit page

$40,000
Jan 24, 2019Completed
final sign-off Mar 2021
595 Clipper Stcomply with 201806761 rev. to pa 201107079682, 201711073406, 201803093281. remodel of (e) lower unit remodel @ 1st floor inc kitchen and bath structural upgrades @ 1st floor inc foundation replacement (n) spiral stair clear, 2 (n) fire rated pl as ab-009 to abate 2018015629enf bid 201806761
Details
Permit
201901241098
Status
complete
Filed
Jan 24, 2019
Permit issued
Mar 7, 2019
Final sign-off
Mar 11, 2021
Declared cost
$40,000
Address
595 Clipper St

comply with 201806761 rev. to pa 201107079682, 201711073406, 201803093281. remodel of (e) lower unit remodel @ 1st floor inc kitchen and bath structural upgrades @ 1st floor inc foundation replacement (n) spiral stair clear, 2 (n) fire rated pl as ab-009 to abate 2018015629enf bid 201806761

Open the permit page

$40,000
Sep 12, 2018Completed
final sign-off Dec 2021
170 King Stremodel kitchen & bath in-kind, approximately 200 sq. ft. kitchen, 80 sq. ft. bath, no change of (e) floor plans.
Details
Permit
201809129912
Status
complete
Filed
Sep 12, 2018
Permit issued
Sep 13, 2018
Final sign-off
Dec 15, 2021
Declared cost
$40,000
Address
170 King St

remodel kitchen & bath in-kind, approximately 200 sq. ft. kitchen, 80 sq. ft. bath, no change of (e) floor plans.

Open the permit page

$40,000
Jul 31, 2018Never finaled
issued Aug 2018, no final
2021 Pacific Avremodel kitchen in-kind 300 sq approx.
Details
Permit
201807316008
Status
issued
Filed
Jul 31, 2018
Permit issued
Aug 3, 2018
Declared cost
$40,000
Address
2021 Pacific Av

remodel kitchen in-kind 300 sq approx.

Open the permit page

$40,000
Mar 9, 2018Completed
final sign-off Mar 2021
595 Clipper Strevision to app#201107079682 & 201711073406. extg rear deck to be expanded and,new stl. guardrail installed. new exterior padio doors to rear deck facade, window at front to be replaced. extg bath at 2nd floor to be remodeled. new kitchen island and cabinatory0.
Details
Permit
201803093281
Status
complete
Filed
Mar 9, 2018
Permit issued
Jul 9, 2018
Final sign-off
Mar 11, 2021
Declared cost
$32,500
Address
595 Clipper St

revision to app#201107079682 & 201711073406. extg rear deck to be expanded and,new stl. guardrail installed. new exterior padio doors to rear deck facade, window at front to be replaced. extg bath at 2nd floor to be remodeled. new kitchen island and cabinatory0.

Open the permit page

$32,500
May 8, 2017Completed
final sign-off Feb 2019
2233 Lyon Stinterior renovation 4 floors. remodel kitchen. all baths, stairs & new elevator. structural strenghthen. ** maher: n/a **
Details
Permit
201705085972
Status
complete
Filed
May 8, 2017
Permit issued
Jun 12, 2017
Final sign-off
Feb 11, 2019
Declared cost
$1,800,000
Address
2233 Lyon St

interior renovation 4 floors. remodel kitchen. all baths, stairs & new elevator. structural strenghthen. ** maher: n/a **

Open the permit page

$1,800,000
Jun 7, 2016Completed
final sign-off Jan 2017
2540 Vallejo Stminor work at 1st floor garage level incl demo mechanical equip & relocate water heater, new post & footing. kitchen remodel at 2nd floor, bathroom remodel at 3rd floor, replace existing hvac units with new.
Details
Permit
201606079325
Status
complete
Filed
Jun 7, 2016
Permit issued
Jun 23, 2016
Final sign-off
Jan 19, 2017
Declared cost
$150,000
Address
2540 Vallejo St

minor work at 1st floor garage level incl demo mechanical equip & relocate water heater, new post & footing. kitchen remodel at 2nd floor, bathroom remodel at 3rd floor, replace existing hvac units with new.

Open the permit page

$150,000
Apr 14, 2016Completed
final sign-off Jan 2017
2540 Vallejo Stkitchen remodel: demo complete kitchen - bring plumbing & electrical to current sf bldg codes, supply & install new drywall to level 5 finish, supply & install new custom cabinets, new appliances & fixtures, new gravite counter tops, new hardwood floors & paint, new plumbing & light fixtures. comple
Details
Permit
201604144789
Status
complete
Filed
Apr 14, 2016
Permit issued
Apr 14, 2016
Final sign-off
Jan 19, 2017
Declared cost
$104,000
Address
2540 Vallejo St

kitchen remodel: demo complete kitchen - bring plumbing & electrical to current sf bldg codes, supply & install new drywall to level 5 finish, supply & install new custom cabinets, new appliances & fixtures, new gravite counter tops, new hardwood floors & paint, new plumbing & light fixtures. comple

Open the permit page

$104,000