80 permits since 2000: 67 completed, 2 in progress, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 10 completed, 1 never finaled. Typically 14 days from filing to permit and 543 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 21, 2025 | Completed final sign-off Apr 2026 | 2649 Greenwich St | kitchen remodel and (2) bathrooms remodelDetails
kitchen remodel and (2) bathrooms remodel | $60,000 |
| Oct 22, 2021 | Completed final sign-off Mar 2026 | 1940 Broadway | unit 4: interior renovation includes replacement of exterior windows and doors with double pane insulated glass, single lite windows changed to divided lite to match street side elevation. kitchen and bathroom remodel.Details
unit 4: interior renovation includes replacement of exterior windows and doors with double pane insulated glass, single lite windows changed to divided lite to match street side elevation. kitchen and bathroom remodel. | $245,000 |
| Feb 6, 2020 | Completed final sign-off Jun 2021 | 601 04th St | improvement to unit #222 including: expand study/home office with higher walls & new adjoining bath, new kitchen cabinets, & appliances, kitchen & bath replacement will be in kind.Details
improvement to unit #222 including: expand study/home office with higher walls & new adjoining bath, new kitchen cabinets, & appliances, kitchen & bath replacement will be in kind. | $45,000 |
| Jan 9, 2020 | Completed final sign-off Aug 2020 | 601 04th St | unit 222 - remodel 1 kitchen and 1 bath in kindDetails
unit 222 - remodel 1 kitchen and 1 bath in kind | $40,000 |
| Jan 24, 2019 | Completed final sign-off Mar 2021 | 595 Clipper St | comply with 201806761 rev. to pa 201107079682, 201711073406, 201803093281. remodel of (e) lower unit remodel @ 1st floor inc kitchen and bath structural upgrades @ 1st floor inc foundation replacement (n) spiral stair clear, 2 (n) fire rated pl as ab-009 to abate 2018015629enf bid 201806761Details
comply with 201806761 rev. to pa 201107079682, 201711073406, 201803093281. remodel of (e) lower unit remodel @ 1st floor inc kitchen and bath structural upgrades @ 1st floor inc foundation replacement (n) spiral stair clear, 2 (n) fire rated pl as ab-009 to abate 2018015629enf bid 201806761 | $40,000 |
| Sep 12, 2018 | Completed final sign-off Dec 2021 | 170 King St | remodel kitchen & bath in-kind, approximately 200 sq. ft. kitchen, 80 sq. ft. bath, no change of (e) floor plans.Details
remodel kitchen & bath in-kind, approximately 200 sq. ft. kitchen, 80 sq. ft. bath, no change of (e) floor plans. | $40,000 |
| Jul 31, 2018 | Never finaled issued Aug 2018, no final | 2021 Pacific Av | remodel kitchen in-kind 300 sq approx.Details
remodel kitchen in-kind 300 sq approx. | $40,000 |
| Mar 9, 2018 | Completed final sign-off Mar 2021 | 595 Clipper St | revision to app#201107079682 & 201711073406. extg rear deck to be expanded and,new stl. guardrail installed. new exterior padio doors to rear deck facade, window at front to be replaced. extg bath at 2nd floor to be remodeled. new kitchen island and cabinatory0.Details
revision to app#201107079682 & 201711073406. extg rear deck to be expanded and,new stl. guardrail installed. new exterior padio doors to rear deck facade, window at front to be replaced. extg bath at 2nd floor to be remodeled. new kitchen island and cabinatory0. | $32,500 |
| May 8, 2017 | Completed final sign-off Feb 2019 | 2233 Lyon St | interior renovation 4 floors. remodel kitchen. all baths, stairs & new elevator. structural strenghthen. ** maher: n/a **Details
interior renovation 4 floors. remodel kitchen. all baths, stairs & new elevator. structural strenghthen. ** maher: n/a ** | $1,800,000 |
| Jun 7, 2016 | Completed final sign-off Jan 2017 | 2540 Vallejo St | minor work at 1st floor garage level incl demo mechanical equip & relocate water heater, new post & footing. kitchen remodel at 2nd floor, bathroom remodel at 3rd floor, replace existing hvac units with new.Details
minor work at 1st floor garage level incl demo mechanical equip & relocate water heater, new post & footing. kitchen remodel at 2nd floor, bathroom remodel at 3rd floor, replace existing hvac units with new. | $150,000 |
| Apr 14, 2016 | Completed final sign-off Jan 2017 | 2540 Vallejo St | kitchen remodel: demo complete kitchen - bring plumbing & electrical to current sf bldg codes, supply & install new drywall to level 5 finish, supply & install new custom cabinets, new appliances & fixtures, new gravite counter tops, new hardwood floors & paint, new plumbing & light fixtures. compleDetails
kitchen remodel: demo complete kitchen - bring plumbing & electrical to current sf bldg codes, supply & install new drywall to level 5 finish, supply & install new custom cabinets, new appliances & fixtures, new gravite counter tops, new hardwood floors & paint, new plumbing & light fixtures. comple | $104,000 |