Back to bathroom remodel contractors
Centric Building Inc.
- Based in
- St Helena
- On San Francisco permits
- Oct 2008 to Sep 2026
- Last 24 months
- 6 permits filed
80 permits since 2000: 67 completed, 2 in progress, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 16 completed, 1 never finaled. Typically 16 days from filing to permit and 421 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2025 | Completed final sign-off Mar 2026 | 153 Avila St | level 1 demo (e) bedroom, bath, closet, new non structural partitions, mech, lighting, power, plumbing, finishes for new bedroom and bath. no structural work. 500 sq ft. no change of conditional space sf.Details
level 1 demo (e) bedroom, bath, closet, new non structural partitions, mech, lighting, power, plumbing, finishes for new bedroom and bath. no structural work. 500 sq ft. no change of conditional space sf. | $116,052 |
| Feb 21, 2025 | Completed final sign-off Apr 2026 | 2649 Greenwich St | kitchen remodel and (2) bathrooms remodelDetails
kitchen remodel and (2) bathrooms remodel | $60,000 |
| Aug 19, 2024 | Completed final sign-off Apr 2026 | 472 Jackson St | interior layout of existing historic building to provide showroom, offices and amenities for staff. connect adjaccent buildings on 1st flr and provide ada bathroom upgrades. mep deferredDetails
interior layout of existing historic building to provide showroom, offices and amenities for staff. connect adjaccent buildings on 1st flr and provide ada bathroom upgrades. mep deferred | $300,000 |
| Aug 19, 2024 | Completed final sign-off Apr 2026 | 468 Jackson St | interior layout of existing historic building to provide showroom, offices and amenities for staff. connect adjaccent buildings on 1st flr and provide ada bathroom upgrades, add new lula elevator. mep deferredDetails
interior layout of existing historic building to provide showroom, offices and amenities for staff. connect adjaccent buildings on 1st flr and provide ada bathroom upgrades, add new lula elevator. mep deferred | $400,000 |
| Oct 22, 2021 | Completed final sign-off Mar 2026 | 1940 Broadway | unit 4: interior renovation includes replacement of exterior windows and doors with double pane insulated glass, single lite windows changed to divided lite to match street side elevation. kitchen and bathroom remodel.Details
unit 4: interior renovation includes replacement of exterior windows and doors with double pane insulated glass, single lite windows changed to divided lite to match street side elevation. kitchen and bathroom remodel. | $245,000 |
| Feb 6, 2020 | Completed final sign-off Jun 2021 | 601 04th St | improvement to unit #222 including: expand study/home office with higher walls & new adjoining bath, new kitchen cabinets, & appliances, kitchen & bath replacement will be in kind.Details
improvement to unit #222 including: expand study/home office with higher walls & new adjoining bath, new kitchen cabinets, & appliances, kitchen & bath replacement will be in kind. | $45,000 |
| Jan 9, 2020 | Completed final sign-off Aug 2020 | 601 04th St | unit 222 - remodel 1 kitchen and 1 bath in kindDetails
unit 222 - remodel 1 kitchen and 1 bath in kind | $40,000 |
| Jan 24, 2019 | Completed final sign-off Mar 2021 | 595 Clipper St | comply with 201806761 rev. to pa 201107079682, 201711073406, 201803093281. remodel of (e) lower unit remodel @ 1st floor inc kitchen and bath structural upgrades @ 1st floor inc foundation replacement (n) spiral stair clear, 2 (n) fire rated pl as ab-009 to abate 2018015629enf bid 201806761Details
comply with 201806761 rev. to pa 201107079682, 201711073406, 201803093281. remodel of (e) lower unit remodel @ 1st floor inc kitchen and bath structural upgrades @ 1st floor inc foundation replacement (n) spiral stair clear, 2 (n) fire rated pl as ab-009 to abate 2018015629enf bid 201806761 | $40,000 |
| Sep 12, 2018 | Completed final sign-off Dec 2021 | 170 King St | remodel kitchen & bath in-kind, approximately 200 sq. ft. kitchen, 80 sq. ft. bath, no change of (e) floor plans.Details
remodel kitchen & bath in-kind, approximately 200 sq. ft. kitchen, 80 sq. ft. bath, no change of (e) floor plans. | $40,000 |
| May 7, 2018 | Completed final sign-off May 2019 | 1170 Sacramento St | renovation of unit 18d including renovate of ktiche, bathroom,s laundry, new partitions, lighting, fixtures and finished. no change to mechanical system, no exterior changes.Details
renovation of unit 18d including renovate of ktiche, bathroom,s laundry, new partitions, lighting, fixtures and finished. no change to mechanical system, no exterior changes. | $350,000 |
| Mar 9, 2018 | Completed final sign-off Mar 2021 | 595 Clipper St | revision to app#201107079682 & 201711073406. extg rear deck to be expanded and,new stl. guardrail installed. new exterior padio doors to rear deck facade, window at front to be replaced. extg bath at 2nd floor to be remodeled. new kitchen island and cabinatory0.Details
revision to app#201107079682 & 201711073406. extg rear deck to be expanded and,new stl. guardrail installed. new exterior padio doors to rear deck facade, window at front to be replaced. extg bath at 2nd floor to be remodeled. new kitchen island and cabinatory0. | $32,500 |
| May 8, 2017 | Completed final sign-off Feb 2019 | 2233 Lyon St | interior renovation 4 floors. remodel kitchen. all baths, stairs & new elevator. structural strenghthen. ** maher: n/a **Details
interior renovation 4 floors. remodel kitchen. all baths, stairs & new elevator. structural strenghthen. ** maher: n/a ** | $1,800,000 |
| Apr 5, 2017 | Completed final sign-off Jul 2017 | 2856 Scott St | bathroom upgrades: replace all (e) finishes, new plumbing fixtures, new electricalt o code, new vanity & stovetop, new frameless shower door enclosure, floor & paint.Details
bathroom upgrades: replace all (e) finishes, new plumbing fixtures, new electricalt o code, new vanity & stovetop, new frameless shower door enclosure, floor & paint. | $12,400 |
| Jun 7, 2016 | Completed final sign-off Jan 2017 | 2540 Vallejo St | minor work at 1st floor garage level incl demo mechanical equip & relocate water heater, new post & footing. kitchen remodel at 2nd floor, bathroom remodel at 3rd floor, replace existing hvac units with new.Details
minor work at 1st floor garage level incl demo mechanical equip & relocate water heater, new post & footing. kitchen remodel at 2nd floor, bathroom remodel at 3rd floor, replace existing hvac units with new. | $150,000 |
| May 27, 2016 | Completed final sign-off Jan 2017 | 2540 Vallejo St | master bath/guest bath & 1/2 bath remodel; full demo of 3 locations, bring electrical & plumbing to current s.f. building codes, new insulation, sheetrock, paint, all new electrical & plumbing fixtures, tile, vanity & mirrors.Details
master bath/guest bath & 1/2 bath remodel; full demo of 3 locations, bring electrical & plumbing to current s.f. building codes, new insulation, sheetrock, paint, all new electrical & plumbing fixtures, tile, vanity & mirrors. | $123,500 |
| Nov 10, 2015 | Completed final sign-off Mar 2016 | 2646 Broderick St | 2/f bathroom remodel, electrical, plumbing, new stonetile fixtures, vanity, drywall & paint. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged.Details
2/f bathroom remodel, electrical, plumbing, new stonetile fixtures, vanity, drywall & paint. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. | $67,000 |
| Jul 7, 2011 | Never finaled issued Oct 2016, no final | 595 Clipper St | addition of new third floor bedroom and bath with new stair from second to third floor. renovation of exterior facade including new windows.Details
addition of new third floor bedroom and bath with new stair from second to third floor. renovation of exterior facade including new windows. | $240,000 |