Cedar House Construction/Brian White

Contractor license
683397
State license record
Based in
San Anselmo
On San Francisco permits
May 2000 to Apr 2025
Last 24 months
1 permit filed

85 permits since 2000: 75 completed, 1 in progress, 4 never finaled, 5 expired or cancelled.

Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllRoof deck 5Pergola or trellis 1Deck 5Stairs 8Kitchen remodel 23Bathroom remodel 31

8 stairs permits: 7 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 212 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 31, 2013Completed
final sign-off Jan 2014
23 Topaz Wyto comply with nov 201314541 - make repairs to front porch tile stairs & shingle siding on both side. approx 160 sq ft of water damaged siding to tile front porch in kind.
Details
Permit
201307313225
Status
complete
Filed
Jul 31, 2013
Permit issued
Jul 31, 2013
Final sign-off
Jan 8, 2014
Declared cost
$2,200
Address
23 Topaz Wy

to comply with nov 201314541 - make repairs to front porch tile stairs & shingle siding on both side. approx 160 sq ft of water damaged siding to tile front porch in kind.

Open the permit page

$2,200
Sep 27, 2011Completed
final sign-off Dec 2014
305 Spruce Sthorizontal addition at rear, 1st, 2nd & 3rd floor. replace (e) stair to graage at rear. interior remodel on all floors.
Details
Permit
201109275561
Status
complete
Filed
Sep 27, 2011
Permit issued
Dec 18, 2012
Final sign-off
Dec 23, 2014
Declared cost
$120,000
Address
305 Spruce St

horizontal addition at rear, 1st, 2nd & 3rd floor. replace (e) stair to graage at rear. interior remodel on all floors.

Open the permit page

$120,000
Sep 18, 2009Completed
final sign-off Oct 2009
1125 Balboa Streplace rotten sections of (e) handrails on front stairs, replace all materials in kind
Details
Permit
200909187151
Status
complete
Filed
Sep 18, 2009
Permit issued
Sep 18, 2009
Final sign-off
Oct 13, 2009
Declared cost
$2,800
Address
1125 Balboa St

replace rotten sections of (e) handrails on front stairs, replace all materials in kind

Open the permit page

$2,800
May 30, 2008Completed
final sign-off Mar 2009
751 12th Avremodel 2 1/2 existing bathrooms and 1 kitchen. repair in kind minimal rotten rear deck boards, bolt foundatin, strengthen basement walls with new plywood, remove interior kitchen staircase to remove and replace master bath and hall bath. non bearing interior walls and build to new plan
Details
Permit
200805303268
Status
complete
Filed
May 30, 2008
Permit issued
May 30, 2008
Final sign-off
Mar 2, 2009
Declared cost
$155,000
Address
751 12th Av

remodel 2 1/2 existing bathrooms and 1 kitchen. repair in kind minimal rotten rear deck boards, bolt foundatin, strengthen basement walls with new plywood, remove interior kitchen staircase to remove and replace master bath and hall bath. non bearing interior walls and build to new plan

Open the permit page

$155,000
Oct 22, 2007Completed
final sign-off May 2008
518 09th Avrenew appl#200409224905 replace stairs.
Details
Permit
200710226081
Status
complete
Filed
Oct 22, 2007
Permit issued
Oct 22, 2007
Final sign-off
May 21, 2008
Address
518 09th Av

renew appl#200409224905 replace stairs.

Open the permit page

Jul 13, 2007Completed
final sign-off Oct 2009
526 09th Avhorizontal addition: new 3 story horizontal additon including playroom, office and exterior stair at first level. new family room and kithcen and roof deck at 2nd level. new master bedroom and bath at 3rd level interior renovation icluding, interior stair . powder room, anundry and bathroom.
Details
Permit
200707136756
Status
complete
Filed
Jul 13, 2007
Permit issued
Jun 24, 2008
Final sign-off
Oct 21, 2009
Declared cost
$375,000
Address
526 09th Av

horizontal addition: new 3 story horizontal additon including playroom, office and exterior stair at first level. new family room and kithcen and roof deck at 2nd level. new master bedroom and bath at 3rd level interior renovation icluding, interior stair . powder room, anundry and bathroom.

Open the permit page

$375,000
Sep 22, 2004Expired or cancelled
expired Jan 2008
518 09th Avto replace in kind rotten front treads and handrails on front stair case
Details
Permit
200409224905
Status
expired
Filed
Sep 22, 2004
Permit issued
Sep 22, 2004
Declared cost
$1,100
Address
518 09th Av

to replace in kind rotten front treads and handrails on front stair case

Open the permit page

$1,100
Jul 2, 2003Completed
final sign-off Aug 2003
224 Hugo Stexterior staircase repairs, dryrot in steps & top floor landing, wood shall be treated or redwood,
Details
Permit
200307028560
Status
complete
Filed
Jul 2, 2003
Permit issued
Jul 2, 2003
Final sign-off
Aug 11, 2003
Declared cost
$6,800
Address
224 Hugo St

exterior staircase repairs, dryrot in steps & top floor landing, wood shall be treated or redwood,

Open the permit page

$6,800