Back to bathroom remodel contractors
Cedar House Construction/Brian White
- Based in
- San Anselmo
- On San Francisco permits
- May 2000 to Apr 2025
- Last 24 months
- 1 permit filed
85 permits since 2000: 75 completed, 1 in progress, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
31 bathroom remodel permits: 28 completed, 3 expired or cancelled. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2018 | Completed final sign-off Jun 2019 | 1000 North Point St | remodel of (2) bathrooms, (1) kitchen. new caepets and new hardwood floors throughout. kitchen 20'x7'. all plumbing in same locations. replace in kind. bathroom #1, 15x10. bathroom #2, 10x10. no interiror wall additions, demolition or relocation,Details
remodel of (2) bathrooms, (1) kitchen. new caepets and new hardwood floors throughout. kitchen 20'x7'. all plumbing in same locations. replace in kind. bathroom #1, 15x10. bathroom #2, 10x10. no interiror wall additions, demolition or relocation, | $115,000 |
| May 30, 2017 | Completed final sign-off Oct 2017 | 127 Avila St | remodel 2 bathrooms; 1 on 2nd fl & 1 on top fl. new tile 2 replacement showers. new fixtures, new led lighting. n/a for maher.Details
remodel 2 bathrooms; 1 on 2nd fl & 1 on top fl. new tile 2 replacement showers. new fixtures, new led lighting. n/a for maher. | $102,000 |
| Jan 20, 2017 | Completed final sign-off May 2017 | 60 Mclaren Av | remodel (1) half bathroom, relocate lights in media roomDetails
remodel (1) half bathroom, relocate lights in media room | $23,000 |
| Sep 21, 2016 | Expired or cancelled cancelled Oct 2016 | 450 Hayes St | to replace hardwood flooring, to remodel 1 kitchen. 2 bathrooms, paint throughout, no structural work. no interior wall changes. no exterior workDetails
to replace hardwood flooring, to remodel 1 kitchen. 2 bathrooms, paint throughout, no structural work. no interior wall changes. no exterior work | $122,000 |
| May 5, 2016 | Completed final sign-off Jun 2016 | 2330 Steiner St | apt 3: to repair studio unit after floor. new 5/8in type x sheet rock , bathroom remodel, minor dry rot repairs in bathroom & at (e) window. new lights fixtures & outlets. no changes in layout and opening. approx 400sf in area. bathroom light h.e. or controlled by manual on sensors with h.e.Details
apt 3: to repair studio unit after floor. new 5/8in type x sheet rock , bathroom remodel, minor dry rot repairs in bathroom & at (e) window. new lights fixtures & outlets. no changes in layout and opening. approx 400sf in area. bathroom light h.e. or controlled by manual on sensors with h.e. | $28,500 |
| Apr 5, 2016 | Completed final sign-off Nov 2016 | 690 Funston Av | remodel kitchen & half bath to include minimal side yard expansion, 11 square feet below (e) legal room. add 16 s.f. light-well in-fill.Details
remodel kitchen & half bath to include minimal side yard expansion, 11 square feet below (e) legal room. add 16 s.f. light-well in-fill. | $68,000 |
| Feb 29, 2016 | Completed final sign-off Jan 2017 | 109 Frederick St | #1- to remodel existing powder room, new tile floor, new sink, new toilet, replace 1 bathroom fan, connect to (e) exhaust duct & 2 lights, (high efficacy)Details
#1- to remodel existing powder room, new tile floor, new sink, new toilet, replace 1 bathroom fan, connect to (e) exhaust duct & 2 lights, (high efficacy) | $16,500 |
| Jan 7, 2015 | Completed final sign-off Feb 2016 | 124 Jordan Av | remodel kitchen, remove rear bay window at kitchen, remodel extg 4 baths at 1st, 2nd, & 3rd floors. remove extg brick fireplace flues, and reconfigure baths and supplement extg structural. voluntary structural strengthening.Details
remodel kitchen, remove rear bay window at kitchen, remodel extg 4 baths at 1st, 2nd, & 3rd floors. remove extg brick fireplace flues, and reconfigure baths and supplement extg structural. voluntary structural strengthening. | $80,000 |
| May 9, 2014 | Completed final sign-off Dec 2014 | 1980 Vallejo St | unit 1a - interior renovation of e basement living unit including e kitchen and e bath. new entry and interior doors, new plumbing fixtures, new interior partitons walls, new lighting, electrical & plbg work as required.replace e. window. n/a maher ordinanceDetails
unit 1a - interior renovation of e basement living unit including e kitchen and e bath. new entry and interior doors, new plumbing fixtures, new interior partitons walls, new lighting, electrical & plbg work as required.replace e. window. n/a maher ordinance | $68,000 |
| Sep 16, 2013 | Completed final sign-off Jan 2014 | 2916 Sacramento St | to remodel one master bathroom/tile fixtures only. same locations. to remodel one guest bathroom. new tile and fixtures same locations.non structural closet.Details
to remodel one master bathroom/tile fixtures only. same locations. to remodel one guest bathroom. new tile and fixtures same locations.non structural closet. | $40,000 |
| Feb 27, 2013 | Completed final sign-off Sep 2013 | 640 Davis St | to remodel 1 kitchen, 2 bathrooms, to install new lightimng, new hardwood floors . to paint unit throughout unit #40Details
to remodel 1 kitchen, 2 bathrooms, to install new lightimng, new hardwood floors . to paint unit throughout unit #40 | $173,000 |
| Jul 19, 2012 | Completed final sign-off Dec 2012 | 2077 Jackson St | work in unit #1: 1 kitchen remodel, 1 bathroom remodel, new hardwood floors and painting throughout. np structural work to be performed. no interior partition walls to be relocated or configured. lighting to comply with cec 180(k).Details
work in unit #1: 1 kitchen remodel, 1 bathroom remodel, new hardwood floors and painting throughout. np structural work to be performed. no interior partition walls to be relocated or configured. lighting to comply with cec 180(k). | $33,800 |
| Feb 22, 2012 | Completed final sign-off Feb 2012 | 2077 Jackson St | for administrative purpose only: to correct improper block & lot number which was written on pa# 201110146835, the correct block & lot is 0602-030. the scope of work included remodel existing kitchen & bath. all work has been completed.Details
for administrative purpose only: to correct improper block & lot number which was written on pa# 201110146835, the correct block & lot is 0602-030. the scope of work included remodel existing kitchen & bath. all work has been completed. | |
| Oct 14, 2011 | Expired or cancelled cancelled Mar 2012 | 2077 Jackson St | to remodel (1) existing kitchen and (1) existing bathroom. all fixtures to be replaced din kind, same locations as existing. to refinish all floors and paint throughout. no exterior work to be performed. no structural work to be performed.Details
to remodel (1) existing kitchen and (1) existing bathroom. all fixtures to be replaced din kind, same locations as existing. to refinish all floors and paint throughout. no exterior work to be performed. no structural work to be performed. | $28,000 |
| Apr 21, 2011 | Completed final sign-off Jul 2011 | 3501 Laguna St | to replace in kind kitchen cabinets and appliances. to replace in kind same locations all plmg fixtures in studio bathroom. no windows, wall,ceiling or wall work on this permit.to replace light fixtures and electrical outlets through out studio. no other work.Details
to replace in kind kitchen cabinets and appliances. to replace in kind same locations all plmg fixtures in studio bathroom. no windows, wall,ceiling or wall work on this permit.to replace light fixtures and electrical outlets through out studio. no other work. | $27,000 |
| Feb 9, 2010 | Completed final sign-off Sep 2010 | 2060 Vallejo St | to remodel 2-bathrooms, no structural changes, unit#2 only. to replace tile work, fixtures. plumbing to be replaced in same locations.in unit #2Details
to remodel 2-bathrooms, no structural changes, unit#2 only. to replace tile work, fixtures. plumbing to be replaced in same locations.in unit #2 | $42,000 |
| Jul 21, 2008 | Completed final sign-off Oct 2008 | 1330 Francisco St | work @ unit# 1332 only. install 2 new toilets, new pedestall sink & light fixtures in bathrooms. replace kitchen counters only. replace gas valve & install new appliances. install air gap into countertop. remove roof deck. repair roof & put deck back in kind.Details
work @ unit# 1332 only. install 2 new toilets, new pedestall sink & light fixtures in bathrooms. replace kitchen counters only. replace gas valve & install new appliances. install air gap into countertop. remove roof deck. repair roof & put deck back in kind. | $8,500 |
| May 30, 2008 | Completed final sign-off Mar 2009 | 751 12th Av | remodel 2 1/2 existing bathrooms and 1 kitchen. repair in kind minimal rotten rear deck boards, bolt foundatin, strengthen basement walls with new plywood, remove interior kitchen staircase to remove and replace master bath and hall bath. non bearing interior walls and build to new planDetails
remodel 2 1/2 existing bathrooms and 1 kitchen. repair in kind minimal rotten rear deck boards, bolt foundatin, strengthen basement walls with new plywood, remove interior kitchen staircase to remove and replace master bath and hall bath. non bearing interior walls and build to new plan | $155,000 |
| Apr 21, 2008 | Completed final sign-off Jan 2009 | 60 Mclaren Av | remodel kitchen and master bathroom, 2-1/2 guest bathrooms to be install, lighting & update electrical, remodel familyy room & dinning rm, to built in book cases & toy storage, no structural work.Details
remodel kitchen and master bathroom, 2-1/2 guest bathrooms to be install, lighting & update electrical, remodel familyy room & dinning rm, to built in book cases & toy storage, no structural work. | $325,000 |
| Mar 3, 2008 | Completed final sign-off May 2008 | 60 Mclaren Av | application to demolish 1 (e) kitchen, 4 (e) bathrooms. remodel plans are not finaled. permits for new kitchen and bathrooms to be pulled seperatly. no structural work to be performed with this permitDetails
application to demolish 1 (e) kitchen, 4 (e) bathrooms. remodel plans are not finaled. permits for new kitchen and bathrooms to be pulled seperatly. no structural work to be performed with this permit | $10,500 |
| Jul 13, 2007 | Completed final sign-off Oct 2009 | 526 09th Av | horizontal addition: new 3 story horizontal additon including playroom, office and exterior stair at first level. new family room and kithcen and roof deck at 2nd level. new master bedroom and bath at 3rd level interior renovation icluding, interior stair . powder room, anundry and bathroom.Details
horizontal addition: new 3 story horizontal additon including playroom, office and exterior stair at first level. new family room and kithcen and roof deck at 2nd level. new master bedroom and bath at 3rd level interior renovation icluding, interior stair . powder room, anundry and bathroom. | $375,000 |
| Jan 10, 2007 | Completed final sign-off Apr 2007 | 2010 Eddy St | all work in kind: to repair dry rot sill plate, 14' in garage from leaking bath tub drain.to repair and replace deck posts (3) to replace beetle damaged deck ledger and decking close to house shingles, replace deck facia board due to beetle and fungus damage.not seen from street. 20' long x 8' wideDetails
all work in kind: to repair dry rot sill plate, 14' in garage from leaking bath tub drain.to repair and replace deck posts (3) to replace beetle damaged deck ledger and decking close to house shingles, replace deck facia board due to beetle and fungus damage.not seen from street. 20' long x 8' wide | $10,800 |
| Dec 13, 2006 | Completed final sign-off Feb 2007 | 171 25th Av | remodel existing master bathroom, replace all fixtures, replace all sheetrock & tile. scope of work for this permit is for master bathroom only at 2nd floor.Details
remodel existing master bathroom, replace all fixtures, replace all sheetrock & tile. scope of work for this permit is for master bathroom only at 2nd floor. | $38,000 |
| Sep 12, 2005 | Completed final sign-off Dec 2005 | 601 Van Ness Av | to remodel (1) existing kitchen, (1) (e) bathroom, no interior or exterior wall changesDetails
to remodel (1) existing kitchen, (1) (e) bathroom, no interior or exterior wall changes | $32,500 |
| Sep 12, 2005 | Completed final sign-off Mar 2006 | 350 Brentwood Av | to remodel (1) kitchen, 3 1/2 bathrooms, family room, dining room and all bedrooms.Details
to remodel (1) kitchen, 3 1/2 bathrooms, family room, dining room and all bedrooms. | $296,000 |
| Mar 17, 2005 | Completed final sign-off Aug 2005 | 1177 Filbert St | to remodel (e) kitchen + to move walls ( interior only) in bathroom to new location, remodel (e)Details
to remodel (e) kitchen + to move walls ( interior only) in bathroom to new location, remodel (e) | $56,000 |
| Mar 8, 2005 | Completed final sign-off Aug 2005 | 171 25th Av | to remodel one new kitchen one new powder room and one new bathroom on 2nd/fl. no exterior work toDetails
to remodel one new kitchen one new powder room and one new bathroom on 2nd/fl. no exterior work to | $85,000 |
| Jan 12, 2004 | Completed final sign-off Sep 2004 | 3271 Jackson St | two full bathroom remodels; repair/replace hardwood floors in sections; new built in cabs & bath sheDetails
two full bathroom remodels; repair/replace hardwood floors in sections; new built in cabs & bath she | $68,000 |
| Jan 21, 2003 | Completed final sign-off Mar 2003 | 130 02nd Av | to remove extg bath tub/build wood surround granite top/new fiber glass, bth tub/instl new shwr vlvDetails
to remove extg bath tub/build wood surround granite top/new fiber glass, bth tub/instl new shwr vlv | $3,200 |
| May 30, 2002 | Completed final sign-off Jul 2002 | 2820 Jackson St | replace tile in 1/2 bath, replace new toilet/sink/shower valve trims, paint/install new medicine cabDetails
replace tile in 1/2 bath, replace new toilet/sink/shower valve trims, paint/install new medicine cab | $4,800 |
| Aug 10, 2000 | Expired or cancelled expired Feb 2001 | 1990 Green St | master bathroom complete remodel,refinish hardwood floors,wash/dryer hook up, 1 new replacement showDetails
master bathroom complete remodel,refinish hardwood floors,wash/dryer hook up, 1 new replacement show | $18,500 |