Cedar House Construction/Brian White
- Based in
- San Anselmo
- On San Francisco permits
- May 2000 to Apr 2025
- Last 24 months
- 1 permit filed
85 permits since 2000: 75 completed, 1 in progress, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
5 roof deck permits: 5 completed. Typically 7 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2015 | Completed final sign-off Feb 2016 | 124 Jordan Av | horizontal addition on the 3rd floor to expand the (e) dormers, addition of bedrm, with no change in bldg footprint and renovate existing roof deckDetails
horizontal addition on the 3rd floor to expand the (e) dormers, addition of bedrm, with no change in bldg footprint and renovate existing roof deck | $25,000 |
| Sep 14, 2012 | Completed final sign-off Jan 2013 | 333 Grant Av | mechanical and electrical upgrades to existing roof deck area. installing natural gas fueled barbecue and fire pit. no work visible from the street is proposed.Details
mechanical and electrical upgrades to existing roof deck area. installing natural gas fueled barbecue and fire pit. no work visible from the street is proposed. | $20,000 |
| Sep 16, 2009 | Completed final sign-off Oct 2009 | 690 Funston Av | remove existing roof deck for a new roof to replace roof under sep permit. reinstall deck to same location at existing.Details
remove existing roof deck for a new roof to replace roof under sep permit. reinstall deck to same location at existing. | $9,400 |
| Jul 21, 2008 | Completed final sign-off Oct 2008 | 1330 Francisco St | work @ unit# 1332 only. install 2 new toilets, new pedestall sink & light fixtures in bathrooms. replace kitchen counters only. replace gas valve & install new appliances. install air gap into countertop. remove roof deck. repair roof & put deck back in kind.Details
work @ unit# 1332 only. install 2 new toilets, new pedestall sink & light fixtures in bathrooms. replace kitchen counters only. replace gas valve & install new appliances. install air gap into countertop. remove roof deck. repair roof & put deck back in kind. | $8,500 |
| Jul 13, 2007 | Completed final sign-off Oct 2009 | 526 09th Av | horizontal addition: new 3 story horizontal additon including playroom, office and exterior stair at first level. new family room and kithcen and roof deck at 2nd level. new master bedroom and bath at 3rd level interior renovation icluding, interior stair . powder room, anundry and bathroom.Details
horizontal addition: new 3 story horizontal additon including playroom, office and exterior stair at first level. new family room and kithcen and roof deck at 2nd level. new master bedroom and bath at 3rd level interior renovation icluding, interior stair . powder room, anundry and bathroom. | $375,000 |