Block 7534, lot 014
23 Topaz Way
- City’s use
- Single Family Residential
- Built
- 1968
- Stories
- 2
- Units
- 1
- Rooms
- 3 bathrooms
- Building
- 2,552 sq ft
- Lot
- 3,297 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2013 | Completed final sign-off Jan 2014 | 23 Topaz Wy | Cedar House Construction/Brian White | to comply with nov 201314541 - make repairs to front porch tile stairs & shingle siding on both side. approx 160 sq ft of water damaged siding to tile front porch in kind.Details
to comply with nov 201314541 - make repairs to front porch tile stairs & shingle siding on both side. approx 160 sq ft of water damaged siding to tile front porch in kind. | $2,200 |
| Sep 22, 2011 | Completed final sign-off Sep 2011 | 23 Topaz Wy | Sun Roofing & Constr. Company, Inc. | reroofingDetails
reroofing | $9,000 |
| Jun 19, 2009 | Completed final sign-off Jun 2009 | 23 Topaz Wy | One Inch To The Left, Inc. Dba Rarefield | replace rotting joists on (e) deck, revision to pa# 2008-0923-2432Details
replace rotting joists on (e) deck, revision to pa# 2008-0923-2432 | $2,000 |
| Sep 23, 2008 | Completed final sign-off Jun 2009 | 23 Topaz Wy | One Inch To The Left, Inc. Dba Rarefield | add new exterior spiral stairway to connect existing 2nd fl balcony to garden below.Details
add new exterior spiral stairway to connect existing 2nd fl balcony to garden below. | $10,000 |
| Oct 23, 2007 | Completed final sign-off Nov 2007 | 23 Topaz Wy | Cummins Construction | repair two decks 17 1/2'x 4'. replace fasicia 2x10 + decking as necessary less than 50%.Details
repair two decks 17 1/2'x 4'. replace fasicia 2x10 + decking as necessary less than 50%. | $3,500 |
| Oct 4, 2007 | Completed final sign-off Nov 2007 | 23 Topaz Wy | Cummins Construction | replace four sliding patio door with new sliding patio doors, visible from street in kind. .67u facor max vinyl to vinyl.Details
replace four sliding patio door with new sliding patio doors, visible from street in kind. .67u facor max vinyl to vinyl. | $8,000 |
| May 9, 2003 | Completed final sign-off Oct 2003 | 23 Topaz Wy | Kinney Construction | remove & replace vanity, build out soffit over vanity.install door in vanity area. install new lightDetails
remove & replace vanity, build out soffit over vanity.install door in vanity area. install new light | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cummins Construction (2), One Inch To The Left, Inc. Dba Rarefield (2), Cedar House Construction/Brian White, Kinney Construction, Sun Roofing & Constr. Company, Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.