Cummins Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Jul 2012
- Last 24 months
- 0 permits filed
26 permits since 2000: 25 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 26, 2012 | Completed final sign-off Sep 2012 | 3633 19th St | remodel kitchen, new cabinets, countertop, floors, update electrical, lighting will comply w/ t-24.Details
remodel kitchen, new cabinets, countertop, floors, update electrical, lighting will comply w/ t-24. | $30,000 |
| Aug 3, 2011 | Completed final sign-off Sep 2011 | 55 Watt Av | new plumbing fixtures, tub/vanity, toilet, med cab. tileDetails
new plumbing fixtures, tub/vanity, toilet, med cab. tile | $8,000 |
| Jun 24, 2011 | Completed final sign-off Aug 2011 | 470 12th Av | remodel bath and kitchenDetails
remodel bath and kitchen | $40,000 |
| May 6, 2011 | Completed final sign-off Jun 2011 | 930 Shields St | front stairs repair (concrete).Details
front stairs repair (concrete). | $1,520 |
| Apr 19, 2011 | Completed final sign-off May 2011 | 235 Chattanooga St | bathroom: repair to shower/bath wall. replace tile shower fixture/bath tub in kind.Details
bathroom: repair to shower/bath wall. replace tile shower fixture/bath tub in kind. | $5,000 |
| Mar 14, 2011 | Completed final sign-off Jul 2011 | 3470 19th St | replacement of damaged front entrance door. door facing the street.Details
replacement of damaged front entrance door. door facing the street. | $5,000 |
| Aug 17, 2010 | Completed final sign-off Sep 2010 | 3892 19th St | repair deck as per correction notice, dry-rot less than 50% to comply with notice of violation #201057382.Details
repair deck as per correction notice, dry-rot less than 50% to comply with notice of violation #201057382. | $900 |
| Jun 21, 2010 | Completed final sign-off Aug 2010 | 3470 19th St | revision to permit pa #201003319371. revise roof joist framing.Details
revision to permit pa #201003319371. revise roof joist framing. | $5,000 |
| Jun 18, 2010 | Completed final sign-off Jul 2010 | 14 Lake Forest Ct | bathroom remodel, new shoer tile, new plumbing, up grade eletric, no wall removal. work on 2nd fl. provide high efficacy lights or "manual on" occupancy sensor in bathroom.Details
bathroom remodel, new shoer tile, new plumbing, up grade eletric, no wall removal. work on 2nd fl. provide high efficacy lights or "manual on" occupancy sensor in bathroom. | $14,000 |
| Mar 31, 2010 | Completed final sign-off Aug 2010 | 3470 19th St | third floor interior renovation; renovate existing kitchen; add bath fixtures.Details
third floor interior renovation; renovate existing kitchen; add bath fixtures. | $90,000 |
| Feb 12, 2010 | Completed final sign-off Mar 2010 | 937 Grove St | to comply with nov 200726433. demolish non code staircase in light well. egress # 003. finish off wall, door exits,Details
to comply with nov 200726433. demolish non code staircase in light well. egress # 003. finish off wall, door exits, | $4,000 |
| Feb 11, 2010 | Completed final sign-off Apr 2010 | 937 Grove St | bathroom & kitchen remodel in unit #937 grove (lower unit). new cabinets, electrical to code, new appliances & fixtures. lighting shall be per cec150 (k)Details
bathroom & kitchen remodel in unit #937 grove (lower unit). new cabinets, electrical to code, new appliances & fixtures. lighting shall be per cec150 (k) | $29,197 |
| Oct 21, 2009 | Never finaled issued Jun 2010, no final | 248 04th Av | demo (e) exterior rear stairs. new rear stairs & landings.Details
demo (e) exterior rear stairs. new rear stairs & landings. | $30,000 |
| Oct 2, 2009 | Completed final sign-off Dec 2009 | 348 Winding Wy | kitchen remodel, cabinets new countertop. electrical upgrade. replace in kind. no structural work under this permitDetails
kitchen remodel, cabinets new countertop. electrical upgrade. replace in kind. no structural work under this permit | $20,900 |
| Aug 7, 2009 | Completed final sign-off Aug 2009 | 2147 Greenwich St | replace 10% - 20% of step. sand and repaint as necessary. back stairs near bottom and top have some water damage. replace steps with pressure treated wood. 10 steps out of 60 steps to be replaced. existing steps that need paint to be painted.Details
replace 10% - 20% of step. sand and repaint as necessary. back stairs near bottom and top have some water damage. replace steps with pressure treated wood. 10 steps out of 60 steps to be replaced. existing steps that need paint to be painted. | $2,500 |
| Apr 13, 2009 | Completed final sign-off Aug 2009 | 930 Shields St | remodel bathroom same layout. upgrade plumbing + electrical. cahnge one window in bathroom in kind.Details
remodel bathroom same layout. upgrade plumbing + electrical. cahnge one window in bathroom in kind. | $11,000 |
| Jan 23, 2009 | Completed final sign-off Mar 2009 | 240 Hartford St | remodel kitchen. new cabinets, counters update electrical, lighting, plumbing.Details
remodel kitchen. new cabinets, counters update electrical, lighting, plumbing. | $14,500 |
| Jun 27, 2008 | Completed final sign-off Jul 2008 | 2572 Greenwich St | install washer / dryer in to shower stall. laundry hook up. vent less dryer, dryer must be listed or exhaust has to be directed outdoor. 220 volt plug.Details
install washer / dryer in to shower stall. laundry hook up. vent less dryer, dryer must be listed or exhaust has to be directed outdoor. 220 volt plug. | $5,000 |
| Mar 19, 2008 | Completed final sign-off Jun 2008 | 1274 Vallejo St | remodel 1 bath, 1 kitchen. change tub/venity/cabinetes/trim work. exhause fan (bathroom). terminate 3's from property line and openings.Details
remodel 1 bath, 1 kitchen. change tub/venity/cabinetes/trim work. exhause fan (bathroom). terminate 3's from property line and openings. | $21,000 |
| Jan 7, 2008 | Completed final sign-off Apr 2008 | 3683 19th St | work @ unit# 3685 only. remodel 1 bath & 1 kitchen @ 2nd floor. update electrical. change windows @ rear & side. not visible from street. total 4 in like kind.Details
work @ unit# 3685 only. remodel 1 bath & 1 kitchen @ 2nd floor. update electrical. change windows @ rear & side. not visible from street. total 4 in like kind. | $29,000 |
| Oct 23, 2007 | Completed final sign-off Nov 2007 | 23 Topaz Wy | repair two decks 17 1/2'x 4'. replace fasicia 2x10 + decking as necessary less than 50%.Details
repair two decks 17 1/2'x 4'. replace fasicia 2x10 + decking as necessary less than 50%. | $3,500 |
| Oct 4, 2007 | Completed final sign-off Nov 2007 | 23 Topaz Wy | replace four sliding patio door with new sliding patio doors, visible from street in kind. .67u facor max vinyl to vinyl.Details
replace four sliding patio door with new sliding patio doors, visible from street in kind. .67u facor max vinyl to vinyl. | $8,000 |
| Aug 30, 2007 | Completed final sign-off Nov 2007 | 7 Topaz Wy | repair upper deck with in building envelopeDetails
repair upper deck with in building envelope | $4,900 |
| Sep 25, 2006 | Completed final sign-off Dec 2006 | 10 Laguna St | work to be done at unit #10 laguna street blk 0871 lot 021 only) bathroom retile change out sink, toilet and bath install shower upgrade plumbing kitchen remove all cabinets and appliances and replace unit upgrade electrical to code change out patio door and also another 2 windows for patio doorDetails
work to be done at unit #10 laguna street blk 0871 lot 021 only) bathroom retile change out sink, toilet and bath install shower upgrade plumbing kitchen remove all cabinets and appliances and replace unit upgrade electrical to code change out patio door and also another 2 windows for patio door | $22,000 |
| Sep 20, 2006 | Completed final sign-off May 2007 | 2069 15th Av | new construction of rear wood deck & stairs to existing bldg. (328 s.f.)Details
new construction of rear wood deck & stairs to existing bldg. (328 s.f.) | $12,000 |
| Jun 9, 2006 | Completed final sign-off Aug 2006 | 259 Marietta Dr | remodel (e) bathroom - replace bathtub with shower, same size, new wiring-lights, no changes to partitions, new drain for showerDetails
remodel (e) bathroom - replace bathtub with shower, same size, new wiring-lights, no changes to partitions, new drain for shower | $11,000 |