Cummins Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Jul 2012
- Last 24 months
- 0 permits filed
26 permits since 2000: 25 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 never finaled. Typically 6 days from filing to permit and 35 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2011 | Completed final sign-off Jun 2011 | 930 Shields St | front stairs repair (concrete).Details
front stairs repair (concrete). | $1,520 |
| Feb 12, 2010 | Completed final sign-off Mar 2010 | 937 Grove St | to comply with nov 200726433. demolish non code staircase in light well. egress # 003. finish off wall, door exits,Details
to comply with nov 200726433. demolish non code staircase in light well. egress # 003. finish off wall, door exits, | $4,000 |
| Oct 21, 2009 | Never finaled issued Jun 2010, no final | 248 04th Av | demo (e) exterior rear stairs. new rear stairs & landings.Details
demo (e) exterior rear stairs. new rear stairs & landings. | $30,000 |
| Aug 7, 2009 | Completed final sign-off Aug 2009 | 2147 Greenwich St | replace 10% - 20% of step. sand and repaint as necessary. back stairs near bottom and top have some water damage. replace steps with pressure treated wood. 10 steps out of 60 steps to be replaced. existing steps that need paint to be painted.Details
replace 10% - 20% of step. sand and repaint as necessary. back stairs near bottom and top have some water damage. replace steps with pressure treated wood. 10 steps out of 60 steps to be replaced. existing steps that need paint to be painted. | $2,500 |
| Sep 20, 2006 | Completed final sign-off May 2007 | 2069 15th Av | new construction of rear wood deck & stairs to existing bldg. (328 s.f.)Details
new construction of rear wood deck & stairs to existing bldg. (328 s.f.) | $12,000 |