Back to bathroom remodel contractors
Cummins Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Jul 2012
- Last 24 months
- 0 permits filed
26 permits since 2000: 25 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 0 days from filing to permit and 82 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2011 | Completed final sign-off Aug 2011 | 470 12th Av | remodel bath and kitchenDetails
remodel bath and kitchen | $40,000 |
| Apr 19, 2011 | Completed final sign-off May 2011 | 235 Chattanooga St | bathroom: repair to shower/bath wall. replace tile shower fixture/bath tub in kind.Details
bathroom: repair to shower/bath wall. replace tile shower fixture/bath tub in kind. | $5,000 |
| Jun 18, 2010 | Completed final sign-off Jul 2010 | 14 Lake Forest Ct | bathroom remodel, new shoer tile, new plumbing, up grade eletric, no wall removal. work on 2nd fl. provide high efficacy lights or "manual on" occupancy sensor in bathroom.Details
bathroom remodel, new shoer tile, new plumbing, up grade eletric, no wall removal. work on 2nd fl. provide high efficacy lights or "manual on" occupancy sensor in bathroom. | $14,000 |
| Mar 31, 2010 | Completed final sign-off Aug 2010 | 3470 19th St | third floor interior renovation; renovate existing kitchen; add bath fixtures.Details
third floor interior renovation; renovate existing kitchen; add bath fixtures. | $90,000 |
| Feb 11, 2010 | Completed final sign-off Apr 2010 | 937 Grove St | bathroom & kitchen remodel in unit #937 grove (lower unit). new cabinets, electrical to code, new appliances & fixtures. lighting shall be per cec150 (k)Details
bathroom & kitchen remodel in unit #937 grove (lower unit). new cabinets, electrical to code, new appliances & fixtures. lighting shall be per cec150 (k) | $29,197 |
| Apr 13, 2009 | Completed final sign-off Aug 2009 | 930 Shields St | remodel bathroom same layout. upgrade plumbing + electrical. cahnge one window in bathroom in kind.Details
remodel bathroom same layout. upgrade plumbing + electrical. cahnge one window in bathroom in kind. | $11,000 |
| Mar 19, 2008 | Completed final sign-off Jun 2008 | 1274 Vallejo St | remodel 1 bath, 1 kitchen. change tub/venity/cabinetes/trim work. exhause fan (bathroom). terminate 3's from property line and openings.Details
remodel 1 bath, 1 kitchen. change tub/venity/cabinetes/trim work. exhause fan (bathroom). terminate 3's from property line and openings. | $21,000 |
| Jan 7, 2008 | Completed final sign-off Apr 2008 | 3683 19th St | work @ unit# 3685 only. remodel 1 bath & 1 kitchen @ 2nd floor. update electrical. change windows @ rear & side. not visible from street. total 4 in like kind.Details
work @ unit# 3685 only. remodel 1 bath & 1 kitchen @ 2nd floor. update electrical. change windows @ rear & side. not visible from street. total 4 in like kind. | $29,000 |
| Sep 25, 2006 | Completed final sign-off Dec 2006 | 10 Laguna St | work to be done at unit #10 laguna street blk 0871 lot 021 only) bathroom retile change out sink, toilet and bath install shower upgrade plumbing kitchen remove all cabinets and appliances and replace unit upgrade electrical to code change out patio door and also another 2 windows for patio doorDetails
work to be done at unit #10 laguna street blk 0871 lot 021 only) bathroom retile change out sink, toilet and bath install shower upgrade plumbing kitchen remove all cabinets and appliances and replace unit upgrade electrical to code change out patio door and also another 2 windows for patio door | $22,000 |
| Jun 9, 2006 | Completed final sign-off Aug 2006 | 259 Marietta Dr | remodel (e) bathroom - replace bathtub with shower, same size, new wiring-lights, no changes to partitions, new drain for showerDetails
remodel (e) bathroom - replace bathtub with shower, same size, new wiring-lights, no changes to partitions, new drain for shower | $11,000 |