Back to bathroom remodel contractors
Cardea Bldg Dba Dimension Design Group
- Based in
- Oakland
- On San Francisco permits
- Aug 2005 to May 2026
- Last 24 months
- 8 permits filed
136 permits since 2000: 110 completed, 4 in progress, 14 never finaled, 8 expired or cancelled.
Of the 14 never-finaled permits, 5 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
61 bathroom remodel permits: 55 completed, 1 in progress, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2025 | In progress issued Aug 2025 | 672 Arguello Bl | interior renovation - remodel all (e) bathrooms on all floors., remodel (e) kitchen (3/f) in kind. replace electrical lighting with led throughout whole house. no rewiring or demolition for electrical work.Details
interior renovation - remodel all (e) bathrooms on all floors., remodel (e) kitchen (3/f) in kind. replace electrical lighting with led throughout whole house. no rewiring or demolition for electrical work. | $125,000 |
| Feb 25, 2025 | Completed final sign-off Feb 2025 | 154 15th Av | revision to pa#202308245116 to remove 4th floor bathroom from scope of work on permit #202308245116.Details
revision to pa#202308245116 to remove 4th floor bathroom from scope of work on permit #202308245116. | |
| Aug 24, 2023 | Completed final sign-off Feb 2025 | 154 15th Av | front of bldg only: 1) expand roof deck @ 2nd flr & replace exterior stairs; 2) @ 2nd flr replace & enlarge sliding door from dining rm to deck; 3) @ 4th flr turn unoccupied roof into new roof deck; 4) new window & exterior door @ 4th flr bedrm; 5) remodel bathroom @ 4th flr.Details
front of bldg only: 1) expand roof deck @ 2nd flr & replace exterior stairs; 2) @ 2nd flr replace & enlarge sliding door from dining rm to deck; 3) @ 4th flr turn unoccupied roof into new roof deck; 4) new window & exterior door @ 4th flr bedrm; 5) remodel bathroom @ 4th flr. | $60,000 |
| May 22, 2023 | Completed final sign-off Mar 2025 | 154 15th Av | rear building: remove crawl space/replace foundations, (n) windows/doors, (n) 1/f powder room, remodel kitchen, replace interior stairs, relocate bathroom, 2/f family room to bedroom, replace water/space heater w/ (n) combination boilerDetails
rear building: remove crawl space/replace foundations, (n) windows/doors, (n) 1/f powder room, remodel kitchen, replace interior stairs, relocate bathroom, 2/f family room to bedroom, replace water/space heater w/ (n) combination boiler | $100,000 |
| Nov 28, 2022 | Completed final sign-off Feb 2025 | 1931 Lyon St | ref pa# 202208039825 & 202210144350. this application: to remove rear deck & stair & install new structural glass & metal stair / landing; excavate window well against rear wall & new exterior doors at lower level; new outdoor fireplace & gas grill; remove hot tub at yard; relocate (1) bath &Details
ref pa# 202208039825 & 202210144350. this application: to remove rear deck & stair & install new structural glass & metal stair / landing; excavate window well against rear wall & new exterior doors at lower level; new outdoor fireplace & gas grill; remove hot tub at yard; relocate (1) bath & | $50,000 |
| Aug 13, 2020 | Completed final sign-off Nov 2020 | 58 Tiffany Av | remodel 2 e bathrooms in-kind. replace vanity, toilet, tub/ shower and tile. no structual workDetails
remodel 2 e bathrooms in-kind. replace vanity, toilet, tub/ shower and tile. no structual work | $7,500 |
| Aug 12, 2020 | Completed final sign-off Sep 2022 | 428 Liberty St | revision to approved permit 201710272502 to comply with planning department requirements only administrative permit to file more precise existing conditions under app#201710242502,and minor revision to bathroom location at level 4.revise to nfpa 13r sprinkler systemDetails
revision to approved permit 201710272502 to comply with planning department requirements only administrative permit to file more precise existing conditions under app#201710242502,and minor revision to bathroom location at level 4.revise to nfpa 13r sprinkler system | |
| Feb 14, 2020 | Expired or cancelled revoked Sep 2022 | 428 Liberty St | revision to pa 3 20171024-2502. administrative permit to file more percise extg conditions under app#201710242502, and minor revision to bathroom location at level 4. revise to nfpa 13r sprinkler system.Details
revision to pa 3 20171024-2502. administrative permit to file more percise extg conditions under app#201710242502, and minor revision to bathroom location at level 4. revise to nfpa 13r sprinkler system. | |
| May 17, 2019 | Completed final sign-off Dec 2020 | 401 Harrison St | revision to 201811085408 unit 42b remove master bath tub expand shower. n/a for maher.Details
revision to 201811085408 unit 42b remove master bath tub expand shower. n/a for maher. | $2,500 |
| May 17, 2019 | Completed final sign-off Jul 2019 | 260 King St | replace bathroom floor tile & shower over bath wall tiles. replace shower valve. one bath remodel. n/a for maher.Details
replace bathroom floor tile & shower over bath wall tiles. replace shower valve. one bath remodel. n/a for maher. | $10,000 |
| Dec 28, 2018 | Completed final sign-off Mar 2019 | 1338 Filbert St | remodel existing master bathroom on ground floor. replace vanity, shower tile and floor tile. approx 90 sq ftDetails
remodel existing master bathroom on ground floor. replace vanity, shower tile and floor tile. approx 90 sq ft | $25,000 |
| Nov 8, 2018 | Completed final sign-off Dec 2020 | 401 Harrison St | unit 42 b. reconfigure and remodel bathrooms, reconfigure laundry area, (n) wine area & closet, spaceDetails
unit 42 b. reconfigure and remodel bathrooms, reconfigure laundry area, (n) wine area & closet, space | $39,000 |
| Sep 28, 2018 | Never finaled issued Sep 2018, no final | 401 Harrison St | replace master bathroom in kind, move electric ventless washer & dryer units to bathroom #2. master bathroom 107 sq ft. bath 2: 90 sq ft.Details
replace master bathroom in kind, move electric ventless washer & dryer units to bathroom #2. master bathroom 107 sq ft. bath 2: 90 sq ft. | $12,000 |
| Sep 28, 2018 | Completed final sign-off May 2019 | 230 Upper Tr | an interior remodel of the top floor master bedroom and master bathroom. the existing hardwood floors across the entire house will be removed and replacedDetails
an interior remodel of the top floor master bedroom and master bathroom. the existing hardwood floors across the entire house will be removed and replaced | $75,000 |
| Jul 30, 2018 | Completed final sign-off Jul 2022 | 3940 Washington St | (upper unit). interior alteration - remodel kitchen & baths. replace (e) wood shingles with (n) wood siding. ** maher: n/a **Details
(upper unit). interior alteration - remodel kitchen & baths. replace (e) wood shingles with (n) wood siding. ** maher: n/a ** | $150,000 |
| Jul 30, 2018 | Completed final sign-off Jul 2022 | 3938 Washington St | horizontal addition to unit# 3938 @ rear ground floor with new bedroom & bath. infill @ 2nd floor @ rear. interior alteration to kitchen, bath @ 2nd floor. replace (e) wood shingles with wood siding. ** maher: n/a **Details
horizontal addition to unit# 3938 @ rear ground floor with new bedroom & bath. infill @ 2nd floor @ rear. interior alteration to kitchen, bath @ 2nd floor. replace (e) wood shingles with wood siding. ** maher: n/a ** | $300,000 |
| May 17, 2018 | Completed final sign-off Apr 2019 | 2221 Baker St | new cabinetry in laundry and mudroom. reconfigure floor plan to add additional bathroom and colset. remodel 2 e bathrooms, new fixutres and finishes. replace cabinetry in 3 closets. remove existing attic closet and add new cabinetry. maher naDetails
new cabinetry in laundry and mudroom. reconfigure floor plan to add additional bathroom and colset. remodel 2 e bathrooms, new fixutres and finishes. replace cabinetry in 3 closets. remove existing attic closet and add new cabinetry. maher na | $120,000 |
| Apr 17, 2018 | Completed final sign-off Jan 2019 | 288 Randall St | interior remodel to 3 story, 2 unit residential bldg, new stairs added in unit 288 to 1st & basement floors. new family room & bath at basement, new front facade - altered bay windowsDetails
interior remodel to 3 story, 2 unit residential bldg, new stairs added in unit 288 to 1st & basement floors. new family room & bath at basement, new front facade - altered bay windows | $350,000 |
| Oct 27, 2017 | Completed final sign-off Sep 2022 | 428 Liberty St | vertical & horizontal additon at rear. 1st fl:(n)fam room, bath, playroom. 2nd fl:kitchen expansion. 3rd fl:(n)master bd, remodel (e)beds and 4th fl: (n) bed and 1/2 bathDetails
vertical & horizontal additon at rear. 1st fl:(n)fam room, bath, playroom. 2nd fl:kitchen expansion. 3rd fl:(n)master bd, remodel (e)beds and 4th fl: (n) bed and 1/2 bath | $500,000 |
| Jun 22, 2017 | Completed final sign-off Dec 2017 | 3953 Washington St | remodel master bathroom, bath 1 and bath 2. replace tile, cabinetry, shower, tub, and toilet. replace kitchen counter tops.Details
remodel master bathroom, bath 1 and bath 2. replace tile, cabinetry, shower, tub, and toilet. replace kitchen counter tops. | $55,000 |
| May 19, 2016 | Completed final sign-off Mar 2017 | 425 01st St | unit 6003: interior remodel of condo remodel of non structural interior partition walls to enlarge living room. replace finishes in bathrooms. replace kitchen cabintry. no new walls created, no increase in sq ft.Details
unit 6003: interior remodel of condo remodel of non structural interior partition walls to enlarge living room. replace finishes in bathrooms. replace kitchen cabintry. no new walls created, no increase in sq ft. | $42,000 |
| Apr 28, 2016 | Completed final sign-off Nov 2016 | 3057 Franklin St | replace finishes in master bathroom, new tile, toilet, vanity, shower and tub. replace (e) 3 window openings with double panel window sashes (not visible from street). u-factor shall not exceed 0.32Details
replace finishes in master bathroom, new tile, toilet, vanity, shower and tub. replace (e) 3 window openings with double panel window sashes (not visible from street). u-factor shall not exceed 0.32 | $22,000 |
| Mar 18, 2016 | Completed final sign-off Jul 2016 | 425 01st St | unit 3202, replace tile in master bath and guest bath. replace countertops in kitchen, master bath and guest room. remove (e) tub in master bathroom and expand shower. no structural work. no wall remove per customerDetails
unit 3202, replace tile in master bath and guest bath. replace countertops in kitchen, master bath and guest room. remove (e) tub in master bathroom and expand shower. no structural work. no wall remove per customer | $40,000 |
| Jun 9, 2015 | Completed final sign-off Sep 2015 | 260 King St | replace finishes in master bathroom, replace tile, vanity sink and counter-top, replace bathtub with new showerDetails
replace finishes in master bathroom, replace tile, vanity sink and counter-top, replace bathtub with new shower | $13,000 |
| Feb 20, 2015 | Completed final sign-off Jun 2015 | 734 Ashbury St | replace bathroom fixtures, vanity, shower and toilet, replace (e) window (rear facing). replace in kind, replace one window.Details
replace bathroom fixtures, vanity, shower and toilet, replace (e) window (rear facing). replace in kind, replace one window. | $13,500 |
| Feb 3, 2015 | Completed final sign-off Oct 2016 | 250 Laussat St | replace bathroom fixtures, tub, toilet, vanity, replace shower, replace bathroom exhaust fan with energy star rated fan.Details
replace bathroom fixtures, tub, toilet, vanity, replace shower, replace bathroom exhaust fan with energy star rated fan. | $12,000 |
| Jan 20, 2015 | Completed final sign-off Feb 2016 | 3874 17th St | upper unit - kitchen & bathroom renovation, replace kitchen countertops. replace vanity, toilet & tile in bathroom. add new bathroom, sink, toilet & shower. replace doors & windows.Details
upper unit - kitchen & bathroom renovation, replace kitchen countertops. replace vanity, toilet & tile in bathroom. add new bathroom, sink, toilet & shower. replace doors & windows. | $31,000 |
| Oct 17, 2014 | Completed final sign-off Apr 2015 | 2775 Green St | interior renovation of master bath. replace fixtures, sinks and vanity, shower and bath tile. replace 1 window and expand 1 windowDetails
interior renovation of master bath. replace fixtures, sinks and vanity, shower and bath tile. replace 1 window and expand 1 window | $34,200 |
| Sep 3, 2014 | Completed final sign-off Sep 2014 | 207 King St | #409 - replace (e) kitchen cabinetry & countertops. replace 3 bathrooms & sinks, 3 toilets to be low flow 1.28g pc. n/a maher ordinanceDetails
#409 - replace (e) kitchen cabinetry & countertops. replace 3 bathrooms & sinks, 3 toilets to be low flow 1.28g pc. n/a maher ordinance | $12,000 |
| Jul 25, 2014 | Expired or cancelled expired Aug 2016 | 166 11th Av | interior renovation:reconfigure interior partitions and new finishes at upper story only. remove extg bathroom and new bathroom.Details
interior renovation:reconfigure interior partitions and new finishes at upper story only. remove extg bathroom and new bathroom. | $29,000 |
| Jan 7, 2014 | Completed final sign-off Aug 2014 | 1265 Masonic Av | remodel (e) bathroom, replace tile and fixtures. lighting: high efficacy or on manuel controlled occupancy sensor.Details
remodel (e) bathroom, replace tile and fixtures. lighting: high efficacy or on manuel controlled occupancy sensor. | $15,000 |
| Jan 7, 2014 | Completed final sign-off Apr 2014 | 425 01st St | remodel existing bathroom, new tile and shower fixtures. change kitchen counter tops.Details
remodel existing bathroom, new tile and shower fixtures. change kitchen counter tops. | $14,000 |
| Dec 10, 2013 | Completed final sign-off Apr 2014 | 1245 Monterey Bl | remodel 9e) bath, replace sink and vanity, new toilet, tub and tile. on second floor. lighting shall comply with t/24.Details
remodel 9e) bath, replace sink and vanity, new toilet, tub and tile. on second floor. lighting shall comply with t/24. | $11,000 |
| Oct 21, 2013 | Completed final sign-off Mar 2014 | 84 Malta Dr | remodel (e) kitchen and 2 full bathrooms plus one half bathroom. add (n) recessed cans. add sauna and soaking tub.Details
remodel (e) kitchen and 2 full bathrooms plus one half bathroom. add (n) recessed cans. add sauna and soaking tub. | $54,000 |
| Oct 4, 2013 | Completed final sign-off Apr 2014 | 4309 19th St | replace fixtures in bathroom, new toilet, sink, showerDetails
replace fixtures in bathroom, new toilet, sink, shower | $11,000 |
| Sep 20, 2013 | Completed final sign-off Feb 2014 | 3844 Jackson St | replace finishes in 3rd floor bathroom and replace toilet sink, shower and tile. add new lightingDetails
replace finishes in 3rd floor bathroom and replace toilet sink, shower and tile. add new lighting | $17,500 |
| Jan 14, 2013 | Completed final sign-off Mar 2013 | 682 Waller St | replace existing finishes in 1 bathroom, repl toilet, vanity, tub, install new shower valves, install new tile, repl existing window & skylight (in kind) window not facing street, skylight on flat roofDetails
replace existing finishes in 1 bathroom, repl toilet, vanity, tub, install new shower valves, install new tile, repl existing window & skylight (in kind) window not facing street, skylight on flat roof | $13,000 |
| Oct 26, 2012 | Completed final sign-off May 2013 | 2760 Broderick St | replace cabinetry, countertops, appliances, update lighting in lower unit kitchen, replace tub and finishes in 2 lower unit bathrooms, replace tub and finishes in 2 upper unit bathrooms, replace in kind same locationDetails
replace cabinetry, countertops, appliances, update lighting in lower unit kitchen, replace tub and finishes in 2 lower unit bathrooms, replace tub and finishes in 2 upper unit bathrooms, replace in kind same location | $34,500 |
| Sep 26, 2012 | Completed final sign-off Feb 2013 | 239 Brannan St | replace extg tile and fixtures in guest bathroom. replace extg tile and finishing, remove extg tab and replace with shower in master bathroom. remove kitchen countertops and replace.Details
replace extg tile and fixtures in guest bathroom. replace extg tile and finishing, remove extg tab and replace with shower in master bathroom. remove kitchen countertops and replace. | $32,000 |
| Feb 3, 2012 | Completed final sign-off Nov 2012 | 25 20th Av | install new windows and doors on west and north elevations. 1st fl relocate e guest bathroom and build new stair extension. 2nd fl. relocate e kitchen, living room, e powder room. 3rd fl new laundry closet. 4th fl: new wetbar. new shower in e powder room. new guardrail at e stairDetails
install new windows and doors on west and north elevations. 1st fl relocate e guest bathroom and build new stair extension. 2nd fl. relocate e kitchen, living room, e powder room. 3rd fl new laundry closet. 4th fl: new wetbar. new shower in e powder room. new guardrail at e stair | $350,000 |
| Aug 3, 2011 | Completed final sign-off Jan 2012 | 425 01st St | remove non loading bearing wall between bedroom and living room. new tile in master bathroom. new lighting fixtures and new locations to comply with cec 1150(k). no change to exterior wall, windows or doors.Details
remove non loading bearing wall between bedroom and living room. new tile in master bathroom. new lighting fixtures and new locations to comply with cec 1150(k). no change to exterior wall, windows or doors. | $32,000 |
| Jun 16, 2011 | Never finaled issued Jun 2011, no final | 1935 California St | upgrade finishes to three existing bathrooms at 3rd floor: replace fixtures, vanity, toilet, tile. upgrade electrical to include gfci outlets. all new lighting to be high efficacy or be controlled by an occupancy sensor. add new exhaust fans to each bathroom. no wall relocation.Details
upgrade finishes to three existing bathrooms at 3rd floor: replace fixtures, vanity, toilet, tile. upgrade electrical to include gfci outlets. all new lighting to be high efficacy or be controlled by an occupancy sensor. add new exhaust fans to each bathroom. no wall relocation. | $43,960 |
| May 17, 2011 | Completed final sign-off Feb 2012 | 2760 Broderick St | work on unit at 2760 broderick. kitchen remodel. master bath remodel. two new skylights. replace/move door to roof deck. two new windows. replace 2 windows. move laundry to powder rm, remove powder roomDetails
work on unit at 2760 broderick. kitchen remodel. master bath remodel. two new skylights. replace/move door to roof deck. two new windows. replace 2 windows. move laundry to powder rm, remove powder room | $120,000 |
| Dec 14, 2010 | Completed final sign-off Feb 2016 | 121 Hugo St | install 2 interior beams, renovate e bath and kitchen, add new powder room, remove e rear deck and stair. legalize e gr fl improvements to include family room, bath, laundryDetails
install 2 interior beams, renovate e bath and kitchen, add new powder room, remove e rear deck and stair. legalize e gr fl improvements to include family room, bath, laundry | $90,000 |
| Nov 17, 2010 | Completed final sign-off Mar 2011 | 239 Brannan St | replace (1) kitchen cabinetry, appliances and countertops. replace flooring throughout. replace tile floor in bathroom. no new lighting, no change to walls.Details
replace (1) kitchen cabinetry, appliances and countertops. replace flooring throughout. replace tile floor in bathroom. no new lighting, no change to walls. | $31,000 |
| Nov 15, 2010 | Completed final sign-off Jan 2011 | 425 01st St | remove non load bearing partitoin wall bewteen office and living rm. remove bathtub and relocate vanity sink. relocate door to bathroomDetails
remove non load bearing partitoin wall bewteen office and living rm. remove bathtub and relocate vanity sink. relocate door to bathroom | $31,000 |
| Oct 28, 2010 | Completed final sign-off Mar 2011 | 230 28th Av | convert (e) basement to conditional living space to include office, bath, laundry totaling 309 sf. construct addition under footprint of (e) dining room for proposed home office to include new area of 114 sf. replace (e) noncode conforming stairs to basement with new code conforming stairs.Details
convert (e) basement to conditional living space to include office, bath, laundry totaling 309 sf. construct addition under footprint of (e) dining room for proposed home office to include new area of 114 sf. replace (e) noncode conforming stairs to basement with new code conforming stairs. | $53,000 |
| Aug 27, 2010 | Completed final sign-off Dec 2010 | 1101 Powhattan Av | revision to application #2010-0427-1103. remodel lower bath, new fixtures, tile, toilet, bathtub. replace existing 4 windows with new double paned insulated front windows. replace existing fence with new fence and add a new gate to access side yard.high efficacy lighting or occupancy sensor @ bath.Details
revision to application #2010-0427-1103. remodel lower bath, new fixtures, tile, toilet, bathtub. replace existing 4 windows with new double paned insulated front windows. replace existing fence with new fence and add a new gate to access side yard.high efficacy lighting or occupancy sensor @ bath. | $15,000 |
| Jun 14, 2010 | Completed final sign-off Aug 2010 | 2248 15th St | unit 2248, top floor. add a shower to the existing bathroom and add a closet to the (e) bedroom. remove kitchen wall and install new header.Details
unit 2248, top floor. add a shower to the existing bathroom and add a closet to the (e) bedroom. remove kitchen wall and install new header. | $14,900 |
| Apr 27, 2010 | Completed final sign-off Dec 2010 | 1101 Powhattan Av | remodel master bathroom, (n) electrical, tub, vanity, upgrade plumbing. replace (e) windows, structural upgrade to west side of building. add recessed lighting to (e) bedroom.on side of building not visible from street.Details
remodel master bathroom, (n) electrical, tub, vanity, upgrade plumbing. replace (e) windows, structural upgrade to west side of building. add recessed lighting to (e) bedroom.on side of building not visible from street. | $38,450 |
| Apr 20, 2010 | Completed final sign-off Jul 2010 | 1051 Treat Av | upgrade finishes to kitchen & bathroom, add new cabinets, countertops, replace 4 single panel with insulated double panel windows. u-factor 0.40 max.not viisble from street.Details
upgrade finishes to kitchen & bathroom, add new cabinets, countertops, replace 4 single panel with insulated double panel windows. u-factor 0.40 max.not viisble from street. | $24,000 |
| Mar 4, 2010 | Completed final sign-off Apr 2010 | 475 09th St | t.i. install 2-lifts & electrical for lifts & compressors & remodel bathroom as part of 20% expenditure. reinforce (e) wood beam.Details
t.i. install 2-lifts & electrical for lifts & compressors & remodel bathroom as part of 20% expenditure. reinforce (e) wood beam. | $25,000 |
| Jul 16, 2009 | Expired or cancelled expired Oct 2010 | 229 Brannan St | change finishes in bathroom. new shower tile, new shoer trim & valve. new vanity add lighting (undercounter) in kitchen. relocate 2 outlets in kitchen.Details
change finishes in bathroom. new shower tile, new shoer trim & valve. new vanity add lighting (undercounter) in kitchen. relocate 2 outlets in kitchen. | $15,000 |
| Jun 15, 2009 | Completed final sign-off May 2010 | 3864 23rd St | horizontal addition at rear of 2-story house - remove existing signle story laundry room at 1st floor. create new breakfast area at 1st floor. create new bathroom & bedroom at second floor.Details
horizontal addition at rear of 2-story house - remove existing signle story laundry room at 1st floor. create new breakfast area at 1st floor. create new bathroom & bedroom at second floor. | $90,000 |
| Sep 25, 2008 | Completed final sign-off Mar 2009 | 1542 20th Av | remodel existing bath & kitchen and replace (2) window in kind.Details
remodel existing bath & kitchen and replace (2) window in kind. | $50,000 |
| Sep 25, 2008 | Completed final sign-off Mar 2009 | 1544 20th Av | remodel (e) kitchen & bath and repalce (1) window in kind.Details
remodel (e) kitchen & bath and repalce (1) window in kind. | $45,000 |
| Jun 3, 2008 | Completed final sign-off Jan 2009 | 194 28th Av | renovae kitchen, bath,bedroom,breakfast room, entry on main floor. upper floor: renovate ma bath, closet & laundry, remove (e) window, add french doors, repalce (e) door with window, replace (e) skylight unit, replace (e) greenhouse window w/casement.Details
renovae kitchen, bath,bedroom,breakfast room, entry on main floor. upper floor: renovate ma bath, closet & laundry, remove (e) window, add french doors, repalce (e) door with window, replace (e) skylight unit, replace (e) greenhouse window w/casement. | $150,000 |
| Jan 23, 2008 | Completed final sign-off May 2008 | 125 Alma St | remodel of existing bathroom on 2nd floo.r, replacement of esisting 30" x 30" glass/wood door to ightwell w/new 30" x 60" dual-glazd, insulated alum clad casement window. remove/alter wall location.Details
remodel of existing bathroom on 2nd floo.r, replacement of esisting 30" x 30" glass/wood door to ightwell w/new 30" x 60" dual-glazd, insulated alum clad casement window. remove/alter wall location. | $16,000 |
| Dec 20, 2007 | Completed final sign-off May 2008 | 575 28th St | remodel (e) kitchen master bath & 2nd bath remove 2 wet bars one in master sink and one on ground level repalce (e) washer and dryer install (n) hardwood repalce (e) alum. frame windows and doors with alum clad double paned wood windows and doors .67 ufactor max.Details
remodel (e) kitchen master bath & 2nd bath remove 2 wet bars one in master sink and one on ground level repalce (e) washer and dryer install (n) hardwood repalce (e) alum. frame windows and doors with alum clad double paned wood windows and doors .67 ufactor max. | $50,000 |
| Apr 24, 2007 | Completed final sign-off Jul 2007 | 175 Commonwealth Av | bathroom remodel. new plumbing fixtures, light fixtures (high efficacy) new pocket door at master closet.Details
bathroom remodel. new plumbing fixtures, light fixtures (high efficacy) new pocket door at master closet. | $20,000 |
| Jul 19, 2006 | Completed final sign-off Sep 2006 | 109 Alma St | reconfiguration of bathroom, installation of new plumbing fixtures at bath, installation of new flooring in kitchen and bath, instaallation of new lighting at bath and bedroom closetDetails
reconfiguration of bathroom, installation of new plumbing fixtures at bath, installation of new flooring in kitchen and bath, instaallation of new lighting at bath and bedroom closet | $7,025 |