Back to kitchen remodel contractors
Cardea Bldg Dba Dimension Design Group
- Based in
- Oakland
- On San Francisco permits
- Aug 2005 to May 2026
- Last 24 months
- 8 permits filed
136 permits since 2000: 110 completed, 4 in progress, 14 never finaled, 8 expired or cancelled.
Of the 14 never-finaled permits, 5 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
36 kitchen remodel permits: 33 completed, 1 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2025 | In progress issued Aug 2025 | 672 Arguello Bl | interior renovation - remodel all (e) bathrooms on all floors., remodel (e) kitchen (3/f) in kind. replace electrical lighting with led throughout whole house. no rewiring or demolition for electrical work.Details
interior renovation - remodel all (e) bathrooms on all floors., remodel (e) kitchen (3/f) in kind. replace electrical lighting with led throughout whole house. no rewiring or demolition for electrical work. | $125,000 |
| May 22, 2023 | Completed final sign-off Mar 2025 | 154 15th Av | rear building: remove crawl space/replace foundations, (n) windows/doors, (n) 1/f powder room, remodel kitchen, replace interior stairs, relocate bathroom, 2/f family room to bedroom, replace water/space heater w/ (n) combination boilerDetails
rear building: remove crawl space/replace foundations, (n) windows/doors, (n) 1/f powder room, remodel kitchen, replace interior stairs, relocate bathroom, 2/f family room to bedroom, replace water/space heater w/ (n) combination boiler | $100,000 |
| Jul 30, 2018 | Completed final sign-off Jul 2022 | 3940 Washington St | (upper unit). interior alteration - remodel kitchen & baths. replace (e) wood shingles with (n) wood siding. ** maher: n/a **Details
(upper unit). interior alteration - remodel kitchen & baths. replace (e) wood shingles with (n) wood siding. ** maher: n/a ** | $150,000 |
| Jul 30, 2018 | Completed final sign-off Jul 2022 | 3938 Washington St | horizontal addition to unit# 3938 @ rear ground floor with new bedroom & bath. infill @ 2nd floor @ rear. interior alteration to kitchen, bath @ 2nd floor. replace (e) wood shingles with wood siding. ** maher: n/a **Details
horizontal addition to unit# 3938 @ rear ground floor with new bedroom & bath. infill @ 2nd floor @ rear. interior alteration to kitchen, bath @ 2nd floor. replace (e) wood shingles with wood siding. ** maher: n/a ** | $300,000 |
| Oct 27, 2017 | Completed final sign-off Sep 2022 | 428 Liberty St | vertical & horizontal additon at rear. 1st fl:(n)fam room, bath, playroom. 2nd fl:kitchen expansion. 3rd fl:(n)master bd, remodel (e)beds and 4th fl: (n) bed and 1/2 bathDetails
vertical & horizontal additon at rear. 1st fl:(n)fam room, bath, playroom. 2nd fl:kitchen expansion. 3rd fl:(n)master bd, remodel (e)beds and 4th fl: (n) bed and 1/2 bath | $500,000 |
| Jun 22, 2017 | Completed final sign-off Dec 2017 | 3953 Washington St | remodel master bathroom, bath 1 and bath 2. replace tile, cabinetry, shower, tub, and toilet. replace kitchen counter tops.Details
remodel master bathroom, bath 1 and bath 2. replace tile, cabinetry, shower, tub, and toilet. replace kitchen counter tops. | $55,000 |
| Feb 8, 2017 | Completed final sign-off Apr 2017 | 2248 15th St | replace cabinetry and countertops in existing kitchenl. add 5 recessed can lights. add 3 electrical outletsDetails
replace cabinetry and countertops in existing kitchenl. add 5 recessed can lights. add 3 electrical outlets | $16,000 |
| May 19, 2016 | Completed final sign-off Mar 2017 | 425 01st St | unit 6003: interior remodel of condo remodel of non structural interior partition walls to enlarge living room. replace finishes in bathrooms. replace kitchen cabintry. no new walls created, no increase in sq ft.Details
unit 6003: interior remodel of condo remodel of non structural interior partition walls to enlarge living room. replace finishes in bathrooms. replace kitchen cabintry. no new walls created, no increase in sq ft. | $42,000 |
| Mar 18, 2016 | Completed final sign-off Jul 2016 | 425 01st St | unit 3202, replace tile in master bath and guest bath. replace countertops in kitchen, master bath and guest room. remove (e) tub in master bathroom and expand shower. no structural work. no wall remove per customerDetails
unit 3202, replace tile in master bath and guest bath. replace countertops in kitchen, master bath and guest room. remove (e) tub in master bathroom and expand shower. no structural work. no wall remove per customer | $40,000 |
| Feb 12, 2015 | Completed final sign-off Aug 2018 | 3235 Clay St | renovation & addition to 4-unit multi-family dwelling. relocate (e) rear 2nd fl unit to ground fl. renovate (e) 2nd ground fl units. (n) kitchen, family rm & rear terrace @ 2nd fl w/ (n) stair to yard. (n) master suite @ 3rd fl.Details
renovation & addition to 4-unit multi-family dwelling. relocate (e) rear 2nd fl unit to ground fl. renovate (e) 2nd ground fl units. (n) kitchen, family rm & rear terrace @ 2nd fl w/ (n) stair to yard. (n) master suite @ 3rd fl. | $500,000 |
| Jan 20, 2015 | Completed final sign-off Feb 2016 | 3874 17th St | upper unit - kitchen & bathroom renovation, replace kitchen countertops. replace vanity, toilet & tile in bathroom. add new bathroom, sink, toilet & shower. replace doors & windows.Details
upper unit - kitchen & bathroom renovation, replace kitchen countertops. replace vanity, toilet & tile in bathroom. add new bathroom, sink, toilet & shower. replace doors & windows. | $31,000 |
| Sep 3, 2014 | Completed final sign-off Sep 2014 | 207 King St | #409 - replace (e) kitchen cabinetry & countertops. replace 3 bathrooms & sinks, 3 toilets to be low flow 1.28g pc. n/a maher ordinanceDetails
#409 - replace (e) kitchen cabinetry & countertops. replace 3 bathrooms & sinks, 3 toilets to be low flow 1.28g pc. n/a maher ordinance | $12,000 |
| Apr 8, 2014 | Completed final sign-off Jun 2014 | 4468 23rd St | new kitchen sink and new kitchen counters on existing cabinets, replace existing wood burning fireplace unit with gas direct vent unit in living room.Details
new kitchen sink and new kitchen counters on existing cabinets, replace existing wood burning fireplace unit with gas direct vent unit in living room. | $20,000 |
| Mar 5, 2014 | Completed final sign-off Jun 2014 | 757 Rockdale Dr | kitchen remodel. reframe of extg openings. electrical upgrades. electrical under separate permit.Details
kitchen remodel. reframe of extg openings. electrical upgrades. electrical under separate permit. | $30,000 |
| Jan 7, 2014 | Completed final sign-off Apr 2014 | 425 01st St | remodel existing bathroom, new tile and shower fixtures. change kitchen counter tops.Details
remodel existing bathroom, new tile and shower fixtures. change kitchen counter tops. | $14,000 |
| Oct 21, 2013 | Completed final sign-off Mar 2014 | 84 Malta Dr | remodel (e) kitchen and 2 full bathrooms plus one half bathroom. add (n) recessed cans. add sauna and soaking tub.Details
remodel (e) kitchen and 2 full bathrooms plus one half bathroom. add (n) recessed cans. add sauna and soaking tub. | $54,000 |
| Feb 11, 2013 | Completed final sign-off Jul 2013 | 250 Laussat St | interior remodel - remodel kitchen, remove (e) wall at stairs, (n) guardrail, (n) ridgid frame. work in one unit.Details
interior remodel - remodel kitchen, remove (e) wall at stairs, (n) guardrail, (n) ridgid frame. work in one unit. | $10,000 |
| Oct 26, 2012 | Completed final sign-off May 2013 | 2760 Broderick St | replace cabinetry, countertops, appliances, update lighting in lower unit kitchen, replace tub and finishes in 2 lower unit bathrooms, replace tub and finishes in 2 upper unit bathrooms, replace in kind same locationDetails
replace cabinetry, countertops, appliances, update lighting in lower unit kitchen, replace tub and finishes in 2 lower unit bathrooms, replace tub and finishes in 2 upper unit bathrooms, replace in kind same location | $34,500 |
| Sep 26, 2012 | Completed final sign-off Feb 2013 | 239 Brannan St | replace extg tile and fixtures in guest bathroom. replace extg tile and finishing, remove extg tab and replace with shower in master bathroom. remove kitchen countertops and replace.Details
replace extg tile and fixtures in guest bathroom. replace extg tile and finishing, remove extg tab and replace with shower in master bathroom. remove kitchen countertops and replace. | $32,000 |
| Jul 18, 2012 | Completed final sign-off Nov 2012 | 943 Church St | unit #a: remodel of kitchen in (e) location. replacement of plumbing fixtures, appliances and cabinetry.Details
unit #a: remodel of kitchen in (e) location. replacement of plumbing fixtures, appliances and cabinetry. | $50,000 |
| Feb 3, 2012 | Completed final sign-off Nov 2012 | 25 20th Av | install new windows and doors on west and north elevations. 1st fl relocate e guest bathroom and build new stair extension. 2nd fl. relocate e kitchen, living room, e powder room. 3rd fl new laundry closet. 4th fl: new wetbar. new shower in e powder room. new guardrail at e stairDetails
install new windows and doors on west and north elevations. 1st fl relocate e guest bathroom and build new stair extension. 2nd fl. relocate e kitchen, living room, e powder room. 3rd fl new laundry closet. 4th fl: new wetbar. new shower in e powder room. new guardrail at e stair | $350,000 |
| Jan 18, 2012 | Completed final sign-off Jul 2013 | 824 Douglass St | contruct new rear addition, new windows and 2 skylights, new slab at ground fl, new furnace. new addition to include new kitchen, familyroom and master bedroom. new staircase from 2nd fl to 1st fl. new electrical and plumbing throughout.Details
contruct new rear addition, new windows and 2 skylights, new slab at ground fl, new furnace. new addition to include new kitchen, familyroom and master bedroom. new staircase from 2nd fl to 1st fl. new electrical and plumbing throughout. | $110,000 |
| Aug 30, 2011 | Completed final sign-off Jan 2012 | 682 Waller St | kitchen remodel. new cabinetry and appliances, minor electrical upgrades. replace kitchen window in kind and add skylight, max u-valve 0.40. remove interior kitchen walls. lighting to comply with cec150(k)Details
kitchen remodel. new cabinetry and appliances, minor electrical upgrades. replace kitchen window in kind and add skylight, max u-valve 0.40. remove interior kitchen walls. lighting to comply with cec150(k) | $41,880 |
| May 17, 2011 | Completed final sign-off Feb 2012 | 2760 Broderick St | work on unit at 2760 broderick. kitchen remodel. master bath remodel. two new skylights. replace/move door to roof deck. two new windows. replace 2 windows. move laundry to powder rm, remove powder roomDetails
work on unit at 2760 broderick. kitchen remodel. master bath remodel. two new skylights. replace/move door to roof deck. two new windows. replace 2 windows. move laundry to powder rm, remove powder room | $120,000 |
| Dec 14, 2010 | Completed final sign-off Feb 2016 | 121 Hugo St | install 2 interior beams, renovate e bath and kitchen, add new powder room, remove e rear deck and stair. legalize e gr fl improvements to include family room, bath, laundryDetails
install 2 interior beams, renovate e bath and kitchen, add new powder room, remove e rear deck and stair. legalize e gr fl improvements to include family room, bath, laundry | $90,000 |
| Nov 17, 2010 | Completed final sign-off Mar 2011 | 239 Brannan St | replace (1) kitchen cabinetry, appliances and countertops. replace flooring throughout. replace tile floor in bathroom. no new lighting, no change to walls.Details
replace (1) kitchen cabinetry, appliances and countertops. replace flooring throughout. replace tile floor in bathroom. no new lighting, no change to walls. | $31,000 |
| Jun 14, 2010 | Completed final sign-off Aug 2010 | 2248 15th St | unit 2248, top floor. add a shower to the existing bathroom and add a closet to the (e) bedroom. remove kitchen wall and install new header.Details
unit 2248, top floor. add a shower to the existing bathroom and add a closet to the (e) bedroom. remove kitchen wall and install new header. | $14,900 |
| Apr 20, 2010 | Completed final sign-off Jul 2010 | 1051 Treat Av | upgrade finishes to kitchen & bathroom, add new cabinets, countertops, replace 4 single panel with insulated double panel windows. u-factor 0.40 max.not viisble from street.Details
upgrade finishes to kitchen & bathroom, add new cabinets, countertops, replace 4 single panel with insulated double panel windows. u-factor 0.40 max.not viisble from street. | $24,000 |
| Apr 20, 2010 | Completed final sign-off Jul 2010 | 3276 Market St | upgrade finishes in kitchen, new flooring, cabinetry, appliances, electrical outlets & plumbing supply. no structural work under this permit. atleast 50% high efficancy lighting (by wattage).Details
upgrade finishes in kitchen, new flooring, cabinetry, appliances, electrical outlets & plumbing supply. no structural work under this permit. atleast 50% high efficancy lighting (by wattage). | $14,000 |
| Jul 28, 2009 | Expired or cancelled expired Mar 2013 | 166 11th Av | kitchen remodel & removal of on existing partition wall & 3-skylights.Details
kitchen remodel & removal of on existing partition wall & 3-skylights. | $30,000 |
| Jul 16, 2009 | Expired or cancelled expired Oct 2010 | 229 Brannan St | change finishes in bathroom. new shower tile, new shoer trim & valve. new vanity add lighting (undercounter) in kitchen. relocate 2 outlets in kitchen.Details
change finishes in bathroom. new shower tile, new shoer trim & valve. new vanity add lighting (undercounter) in kitchen. relocate 2 outlets in kitchen. | $15,000 |
| Sep 25, 2008 | Completed final sign-off Mar 2009 | 1544 20th Av | remodel (e) kitchen & bath and repalce (1) window in kind.Details
remodel (e) kitchen & bath and repalce (1) window in kind. | $45,000 |
| Sep 25, 2008 | Completed final sign-off Mar 2009 | 1542 20th Av | remodel existing bath & kitchen and replace (2) window in kind.Details
remodel existing bath & kitchen and replace (2) window in kind. | $50,000 |
| Jun 3, 2008 | Completed final sign-off Jan 2009 | 194 28th Av | renovae kitchen, bath,bedroom,breakfast room, entry on main floor. upper floor: renovate ma bath, closet & laundry, remove (e) window, add french doors, repalce (e) door with window, replace (e) skylight unit, replace (e) greenhouse window w/casement.Details
renovae kitchen, bath,bedroom,breakfast room, entry on main floor. upper floor: renovate ma bath, closet & laundry, remove (e) window, add french doors, repalce (e) door with window, replace (e) skylight unit, replace (e) greenhouse window w/casement. | $150,000 |
| Dec 20, 2007 | Completed final sign-off May 2008 | 575 28th St | remodel (e) kitchen master bath & 2nd bath remove 2 wet bars one in master sink and one on ground level repalce (e) washer and dryer install (n) hardwood repalce (e) alum. frame windows and doors with alum clad double paned wood windows and doors .67 ufactor max.Details
remodel (e) kitchen master bath & 2nd bath remove 2 wet bars one in master sink and one on ground level repalce (e) washer and dryer install (n) hardwood repalce (e) alum. frame windows and doors with alum clad double paned wood windows and doors .67 ufactor max. | $50,000 |
| Jul 19, 2006 | Completed final sign-off Sep 2006 | 109 Alma St | reconfiguration of bathroom, installation of new plumbing fixtures at bath, installation of new flooring in kitchen and bath, instaallation of new lighting at bath and bedroom closetDetails
reconfiguration of bathroom, installation of new plumbing fixtures at bath, installation of new flooring in kitchen and bath, instaallation of new lighting at bath and bedroom closet | $7,025 |