Block 2629, lot 005
230 Upper Ter
- City’s use
- Single Family Residential
- Built
- 1906
- Stories
- 3
- Units
- 1
- Rooms
- 3 bedrooms, 4 bathrooms
- Building
- 3,446 sq ft
- Lot
- 2,474 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 26, 2023 | Completed final sign-off Aug 2023 | 230 Upper Tr | Crana Windows & Doors Dba Kevin Mc Laugh | replace (2) double hung and (4) casement sashses, wood for wood. no change in design or operation. double hung with og lugs. visible from street.Details
replace (2) double hung and (4) casement sashses, wood for wood. no change in design or operation. double hung with og lugs. visible from street. | $9,000 |
| Feb 8, 2023 | Completed final sign-off Mar 2023 | 230 Upper Tr | Mr. Roofing, Inc. | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $32,000 |
| Dec 28, 2018 | Never finaled issued Dec 2018, no final | 230 Upper Tr | street space only | ||
| Sep 28, 2018 | Completed final sign-off May 2019 | 230 Upper Tr | Cardea Bldg Dba Dimension Design Group | an interior remodel of the top floor master bedroom and master bathroom. the existing hardwood floors across the entire house will be removed and replacedDetails
an interior remodel of the top floor master bedroom and master bathroom. the existing hardwood floors across the entire house will be removed and replaced | $75,000 |
| Aug 13, 2018 | Never finaled issued Aug 2018, no final | 230 Upper Tr | street space | ||
| Mar 24, 2006 | Completed final sign-off Sep 2006 | 230 Upper Tr | Daniel Ehrmann | voluntary structural upgrade of existing basement retaining wall.Details
voluntary structural upgrade of existing basement retaining wall. | $25,000 |
| Mar 9, 2006 | Completed final sign-off Sep 2006 | 230 Upper Tr | Daniel Ehrmann | remodel existing, bathroom. new flourescents to comply with title 24, sink, shower pan and new tile. no structural workDetails
remodel existing, bathroom. new flourescents to comply with title 24, sink, shower pan and new tile. no structural work | $6,300 |
| Mar 6, 2006 | Completed final sign-off Mar 2008 | 230 Upper Tr | Daniel Ehrmann, Barker-O'donoghue Master Bldrs | site permit- construct 2 stories addition at rear of exist structure. convert portion of existing permitted roof deck to conditioned space.Details
site permit- construct 2 stories addition at rear of exist structure. convert portion of existing permitted roof deck to conditioned space. | $200,000 |
| Mar 7, 2001 | Completed final sign-off Jun 2001 | 230 Upper Tr | gut & remodel (e) kitchenDetails
gut & remodel (e) kitchen | $52,000 | |
| Oct 2, 2000 | Completed final sign-off Jan 2002 | 230 Upper Tr | Hall Construction & Woodworkin | renew for final 9712522, 9903580Details
renew for final 9712522, 9903580 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Daniel Ehrmann (3), Barker-O'donoghue Master Bldrs, Cardea Bldg Dba Dimension Design Group, Crana Windows & Doors Dba Kevin Mc Laugh, Hall Construction & Woodworkin, Mr. Roofing, Inc.
- Architects
- Stuart Hills
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.