Back to kitchen remodel contractors
Cahill Contractors Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Sep 2019
- Last 24 months
- 0 permits filed
538 permits since 2000: 416 completed, 80 never finaled, 42 expired or cancelled.
Of the 80 never-finaled permits, 5 are 5 to 10 years old, 75 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 21 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 1, 2019 | Completed final sign-off Nov 2019 | 210 Taylor St | revision to pa 2016-0217-9822s2 and 2019-0102-9503 including addition of roof farm and revised pavig to roof level, revised community kitchen configuration, and landscape details including tree pit surrounds and turf specificationDetails
revision to pa 2016-0217-9822s2 and 2019-0102-9503 including addition of roof farm and revised pavig to roof level, revised community kitchen configuration, and landscape details including tree pit surrounds and turf specification | |
| Dec 12, 2018 | Completed final sign-off Mar 2019 | 711 Pacific Av | change of use from temporary occupancy approved permit pa 2018-0402-5282 education to original approved assembly occupancy per 2015-1020-0191 install kitchen and bathroom doors, toilet partitions and apliances at community centerDetails
change of use from temporary occupancy approved permit pa 2018-0402-5282 education to original approved assembly occupancy per 2015-1020-0191 install kitchen and bathroom doors, toilet partitions and apliances at community center | |
| Sep 26, 2017 | Completed final sign-off Nov 2017 | 1100 Market St | revision to 201305106635 update food service equipment at gr fl kitchen and bar and penthouse bar, service area and f and b support area; existing mechanical and lighting ystems to remain as permited 201607293721Details
revision to 201305106635 update food service equipment at gr fl kitchen and bar and penthouse bar, service area and f and b support area; existing mechanical and lighting ystems to remain as permited 201607293721 | $7,500 |
| Jul 14, 2015 | Completed final sign-off Aug 2015 | 536 Mission St | revision to 201503029644 and 201504173908. add ceiling above cafe. kitchenn/storage and counter, per sfdph requirementsDetails
revision to 201503029644 and 201504173908. add ceiling above cafe. kitchenn/storage and counter, per sfdph requirements | $1,000 |
| Mar 12, 2014 | Completed final sign-off Jul 2014 | 1998 Market St | revision to appl #2010.1221.7106: revise east corner units on floors 4 through 8. relocate bathroom, kitchen & bedrooms. mep. & lighting to be under seperate permit.Details
revision to appl #2010.1221.7106: revise east corner units on floors 4 through 8. relocate bathroom, kitchen & bedrooms. mep. & lighting to be under seperate permit. | |
| Mar 7, 2014 | Completed final sign-off Nov 2014 | 75 Raycliff Tr | kitchen remodel with electrical, plumbing, & mechanical. extension of crawl space for enlargement of floor above. re-facing of exterior. under (e) front overhang.Details
kitchen remodel with electrical, plumbing, & mechanical. extension of crawl space for enlargement of floor above. re-facing of exterior. under (e) front overhang. | $450,000 |
| Feb 4, 2013 | Completed final sign-off Dec 2013 | 25 Essex St | revision to pa# 2010-0315-8191/s2-work asscoaied with revisions to the warming kitchen-removing partition between warming kitchen & the adjacent space along with the door & roll-down door. also includes misc changes to casework & finshes.Details
revision to pa# 2010-0315-8191/s2-work asscoaied with revisions to the warming kitchen-removing partition between warming kitchen & the adjacent space along with the door & roll-down door. also includes misc changes to casework & finshes. | $10,000 |
| Sep 11, 2012 | Completed final sign-off Jan 2013 | 220 Golden Gate Av | revision to appl #s #2008.0819.9494s3 & #2010.1216.6845 -revision includes architectural scope only, mep scope is permitted with 200808199494 & 201012166845, revision to the original scope & involves ada dimensional changes, flipping kitchenettes & changing door swings. infill at lightwellDetails
revision to appl #s #2008.0819.9494s3 & #2010.1216.6845 -revision includes architectural scope only, mep scope is permitted with 200808199494 & 201012166845, revision to the original scope & involves ada dimensional changes, flipping kitchenettes & changing door swings. infill at lightwell | |
| Jan 14, 2003 | Completed final sign-off Jun 2004 | 1055 Ellis St | conversion of kitchen prep space into boys' & girls' toilet rms (ref.200112175385) new partitions,Details
conversion of kitchen prep space into boys' & girls' toilet rms (ref.200112175385) new partitions, | $180,000 |